Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Exploitation de la zone nord à la Mine Kiena avec des équipements captifs

    By Rosaire Emond

    Le concept du forage horizontal a été développé voilà de nombreuses années. Différents types de plate-formes permettant le forage horizontal depuis une cheminée ont été conçus par divers manufacturier

    Oct 1, 2001

  • CIM
    Operation and Improvements at the El Indio Roasting Facility

    By John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson

    "The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot

    Jan 1, 1999

  • CIM
    Nickel Rim South -Xstrata?s First New Mine in Sudbury in 20 Years

    By Rick Collins

    Presentation Agenda 1.Sudbury Basin 2.Diamond Drilling 3.Planned Production 4.Safety 5.Timeline 6.Sustainable Development 7.Scope Elements 8.Progress 9.Delivery Approach 10.Owners and EPCM

    May 1, 2009

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    Paste Backfill Strength Behaviour Using Different Binding Agents and Binder Combinations

    By Philip A. Dirige

    This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength

    May 1, 2006

  • CIM
    An Alkaline Glycine-Based Process for Copper Recovery and Iron Rejection from Chalcopyrite

    By B. Tanda

    A process has been developed at Curtin University whereby glycine is used in an alkaline environment to leach gold, silver and copper from their ores, concentrates, process intermediates and wastes. C

    Jan 1, 2016

  • CIM
    Diagnosis of the Operation of a Hydraulic Classifier for Iron Ore Concentrate

    By C. Gosselin, G. M. Payenzo, C. Bazin, M. Desnoyers, G. Chevalier

    "ArcelorMittal Mines Canada operates hydraulic classifiers to reduce the silica content of an iron oxide concentrate from 4.5% to less than 1.2% SiO2. Sampling campaigns were conducted to develop a pr

    Jan 1, 2012

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999

  • CIM
    In Kiruna mineral processing starts underground - bulk sorting by LIF

    By Åke Krukka, Heribert F. Broicher

    "The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i

    Jan 1, 2002

  • CIM
    Milling Circuit Control and Optimisation: The Millstar with IES

    By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert

    "An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud

    Jan 1, 2000

  • CIM
    Kerr-Addison Mine

    By J. W. Baker

    "The Kerr-Addison mine is on the northeast shore of Larder Lake in the township of McGarry, District of Timiskaming, Ontario. It lies just south of the highway leading to the town of Kirkland Lake, 25

    Jan 1, 1949

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • CIM
    The Minexan on Stream Analyser Evaluation by Selco Mining

    By G. A. Mallory

    "The South Bay Division of Selco Mining is located fifty-four miles northeast of Ear Falls Ontario on Confederation Lake. The concentrator operates five days a week and processes six hundred tons per

    Jan 1, 1981

  • CIM
    Process Design and Change Management for Successful Deployment of Technology in Mining

    By Laura Mottola

    Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.

    May 1, 2010

  • CIM
    Process Mineralogy of Silver Ores and Applications in Flowsheet Design and Plant Optimization

    By Joe Zhou

    "Mineralogical characterization and metallurgical extraction of silver is challenging due to its complex mineralogy and chemistry. Over 200 Ag-bearing minerals have been identified and a silver-rich o

    Jan 1, 2010

  • CIM
    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Fine Grinding of a Sparsely Disseminated Sulphide Ore

    By Augustine O. Orumwense, Micheline Boisclair

    "The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ

    Jan 1, 2008