Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimizing Stope Design in a Deeper Mining Zone at the Musselwhite Mine

    By Ali Hashemi, Anna P. Perry

    The PQ Deeps (PQD) is a production zone located at Newmont’s Musselwhite Mine in northern Ontario. Development started for the PQD in late 2017, and the first stopes were mined starting in early 2021.

    Jan 1, 2023

  • CIM
    Novel Metallographic Techniques, Particularly as Applied to the Study of Aluminum

    By C. A. Godden, T. N. Atkinson

    Metallographic techniques developed from studies of corrosion films and electroplated coatings on aluminum alloys, are discussed. These methods, the result of work at the Naval Research Establishment,

    Jan 1, 1962

  • CIM
    Open-Pit Planning at the Adams Mine

    By F. J. West

    This paper deals with Jones & Laughlin Steel Corporation's new Adams mine, near Kirkland Lake, Ontario. After a brief discussion of ore structure, type, reserve tonnages, etc., the main body of the pa

    Jan 1, 1966

  • CIM
    The Implementation of a Mobile Equipment Data Collection System at Vale Inco

    By Peter D. Cunningham

    At Vale Inco in Sudbury, underground mobile equipment production and maintenance data is presently collected manually from paper slips. This paper reviews a pilot project that developed a system to el

    Oct 1, 2009

  • CIM
    Risk Control in Ultimate Pits Using Conditional Simulations

    By Juan Pablo Vielma

    In this work we study how to incorporate risk control to the generation of ultimate pits when orebodies are modeled through a finite number of conditional simulations. To control risk we consider a ch

    Oct 1, 2009

  • CIM
    Feasibility Studies CIM Vancouver 2010

    Some Statistics ? Feasibilitystudiescostbetween2% & 3% of capital andrequire8% to15% of total engineering effort ? Feasibilitystudiesusuallytakebetween8 and16 months ? Historically more than80% of

    May 1, 2010

  • CIM
    A Mixed Integer Linear Programming - Based Short-Term Planning Tool

    By Zhanyou Huang

    The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr

    Oct 1, 2009

  • CIM
    A Mixed Integer Linear Programming - Based Short-Term Planning Tool

    By Zhanyou Huang

    The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr

    Oct 1, 2009

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls (36201383-38b6-40ff-a8ef-b5e69088dfb5)

    By J. Drozdiak

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    HPGR Trade-Off Studies and how to Avoid Them (6875f157-fcc3-4955-b54c-dc18d1078933)

    By C. T. Morley

    The steadily increasing interest in high pressure grinding rolls (HPGR) as a legitimate alternative comminution technology for hard rock applications has led to a proportional increase in the demand f

    Jan 1, 2012

  • CIM
    An Organic Geochemical, Study to Compare Jurassic Black Shale-hosted Manganese Carbonate Deposits: Úrkút, Hungary, and Branisko Mountains, East Slovakia

    By Eva Surová, Molák. Bohumil, Márta Polgári

    The Úrkút rhodochrosite deposit and Branisko Mn showings (rancieite, manganiferous calcite), located in Lower Jurassic marine sedimentary rocks with black shale, were studied by organicgeochemical met

    Jan 1, 1992

  • CIM
    BIM for Facility Management: Design for Maintainability with BIM Tools (Construction Science and Management Program)

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    Magnesium derived foams for hydrogen storage

    By J. O. G. Posada

    Magnesium derived foams were prepared by using the so-called baking of powder blended precursor material method. This method comprises mixing magnesium powder with a small fraction of blowing agent (Z

    Jan 1, 2005

  • CIM
    Software for Simulation of Bulk Media Forces on an Excavation Tool

    By Ahmad Hemami

    A working code is developed to simulate the forces that are involved in the process of penetration of a bucket into bulk media during loading and excavation. The result of this work can be integrated

    Aug 1, 2013

  • CIM
    By-Product Molybdenite Plant Design

    By J. F. Shirley

    "Very seldom, if ever, is a molybdenite by-product plant operated exactly the way the process design engineer visualizes it. The best thing the design engineer can do is provide a sound, basic circuit

    Jan 1, 1981

  • CIM
    Quantitative Estimation of Dilution and Ore Loss Resulting from Block Estimation Errors and a Specified Cut-off Grade

    By T. A. Postolski, A. J. Sinclair

    "Abstract - Where block (selective mining unit) grade distributions can be determined, the effect of average random errors of block grade estimates on metal recovery can be evaluated quantitatively. T

    Jan 1, 1998

  • CIM
    Post-mineralization Breccia Dike from the Sar Cheshmeh Porphyry Copper Deposit, Kerman, Iran (26971b14-1e95-4a1a-9cca-4e98e7d5067c)

    By J. Shahabpour

    "Breccias with angular and rounded clasts of a late-mineralization, ""barren"" hornblende porphyry dike set within a comminuted matrix consisting of rock fragments and quartz, cemented by quartz and K

    Jan 1, 1994

  • CIM
    Long-Term Mine Production Scheduling Optimization and Strategic Planning Under Complex Operational Constraints

    By Kadri Dagdelen

    Recent trends of the mining project show that there will be more and more mechanized, largescale mining operations with complex process options to make low grade deposits economically feasible to deve

    Oct 1, 2009

  • CIM
    Application of Oxygen Demand Measurements to Aeration Design

    By F. Rosenblum, P. Spira

    "A correlation has been established between the oxygen demand of Brunswick Mining and Smelting ore and flotation results at the bench, pilot plant and operating plant scale. A method of dete""1llining

    Jan 1, 1978

  • CIM
    The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches

    By A. Boucher, D. Marcotte

    "Abstract- The accepted practice for the estimation of thin (2D) vein deposits recommends the use of the grade x thickness service variable (i.e., the accumulation). Grade estimates are obtained indir

    Jan 1, 2001