Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stable Isotope Study of Variscan Vein Pb-Zn-Ag Mineralization of the Bohemian Massif (63085097-dc47-4544-8d70-a367fa184777)

    By J. H. Bernard, K. Žák

    The three traditional types of Variscan vein Pb-Zn-(Ag) mineralization recognized in the Bohemian massif from historic paragenetic studies are confinned by modem metallogenic studies. Stable C, S, and

    Jan 1, 1992

  • CIM
    Size and Support Effects of Gold Model Catalysts

    By Shamil Shaikhutdinov

    CO adsorption on gold particles deposited on well-ordered alumina and various iron oxide films has been studied with temperature programmed desorption (TPD) and infrared reflection adsorption spectros

    Oct 1, 2003

  • CIM
    SAG Mill Liner Design for Secondary Crushing (1f7d545d-3a50-4254-8cea-23d41b1e2a55)

    By D. Royston

    Reducing SAG Mill feed size has been a major trend in recent years. ‘Mine to mill’ strategies have reduced blasted-rock size, and in a growing number of operations reducing the primary crusher CSS and

    Jan 1, 2012

  • CIM
    Tailings Dam Engineering An Overview of its Evolution, Current Practice and New Challenges Topic Area ? Metal Mining, Environment

    By Robert C. Lo

    As tailings dams grow in physical size, their impact on public safety and the environment also increases in severity. Over the last three decades, tailings dam engineering has evolved from largely "tr

    May 1, 2001

  • CIM
    Variable Frequency Drives as Applied to Ventilation Systems

    By Cheryl L. Allen

    The power required to operate a ventilation system can be 25% to 50% of the total energy requirements of a mine. In an effort to reduce energy consumption, initiatives are being introduced at Vale Inc

    May 1, 2009

  • CIM
    Outlook for Blast Furnace Ironmaking

    By Joseph J. Poveromo

    The blast furnace today continues as the primary production method of hot metal in large-scale steel production. The blast furnace process has been the target of repeated attempts to replace it with v

    May 1, 2003

  • CIM
    A Framework for Promoting Community Development While Avoiding Dependence, Defiance and Dissipation

    By Robert G. Boutilier

    Mining companies in communities without other large employers often encounter dependent or defiant stakeholder attitudes, sometimes simultaneously. Less often they also see some slip into social dissi

    May 1, 2006

  • CIM
    Energy Savings through Process Variable Monitoring

    By Alisa M. Caswell

    Outline: 1. Syncrude: Who are We? 2. Energy Use at Syncrude 3. Historical Energy Focus at Syncrude 4. Case Studies for Process Variable Monitoring 5. Extraction Flood Water Temperature Management

    May 1, 2008

  • CIM
    Investigation of Electrical Properties of Radioactive Phosphatic Layers in the Al-Sharquieh Mine, Syria

    By R. Mohamad, J. Asfahani

    Abstract - Radioactive characteristics of pits drilled in the Al-Sharquieh mine while prospecting for recent phosphatic resources have been investigated. The results indicate that phosphatic layers ar

    Jan 1, 2000

  • CIM
    Atlas Copco drill rigs for Mine Automation and Communication - A totally new technology platform for advanced mining systems

    By Mikael Ramström

    In 2002 Atlas Copco Rock Drills AB released the new RCS technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on modern, standard PC-compu

    May 1, 2003

  • CIM
    Optimisation of the Prominent Hill SAG Mill (bf73cc6e-b0d3-47b9-89d5-5e692f076fff)

    By Brett Triffett, Mark Weidenbach, Christopher Treloar

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • CIM
    Separation of KCl values from Canadian sylvinite and carnallite potash ores by selective flocculation

    By S. A. Beeson, C. Poole

    "This paper reports on the development of selective flocculation processes for the direct recovery of KCl values from low-grade Canadian sylvinite and carnallite potash ores.Two reagent suites, consis

    Jan 1, 2000

  • CIM
    Examples of Ground Support Practices for Low Quality Rock

    By John G. Henning

    Low quality rock is encountered in many manifestations in underground hard rock mines, ranging from weak and poorly consolidated rock to highly altered or foliated rock. Lateral mine developments driv

    Oct 1, 2010

  • CIM
    Mining and Financial Management : After the Credit Crunch: Crunch

    Post--Crunch Financial Management -An Overview A. The Industry and the Capital Markets B. .The SME -De-risking the Current and New Assets Followed by: C. The Lender?s Perspective on Re-financing?

    May 1, 2010

  • CIM
    Real-Time Intervention to Prevent Driver Sleepiness

    Falling asleep at the wheel of a moving vehicle is not only dangerous but avoidable. It is implicated in up to 30% of all road fatalities in general and up to 65% of mining incidents involving haulage

    May 1, 2011

  • CIM
    The Evolution of Maintenance Management into the 21st Century ? The Need to Implement Best practices

    By Ron Doucet

    Industry today is now more than ever dependent on its assets and on the standard of maintenance. Changes in technology, environmental regulations, a continually improving focus on safety and global co

    May 1, 2003

  • CIM
    Long-Term Planning of an Underground Mine Using Linear Programming

    By George McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    May 1, 2003

  • CIM
    The testing, design, construction, and implementation of cemented rockfill (CRF) at Polaris

    By Steve Dismuke, Tom Diment

    In December 1994, Polaris decided to investigate the use of cemented rockfill (CRF) to supplement the existing frozen rockfill system. Extraction plans for the remaining ore reserves required a backfi

    Jan 1, 1996

  • CIM
    Modeling the Optimal Haul Truck Retirement Age

    By Chris Ryan

    Operational excellence along with the need for a capital management strategy demanded an educated budgetary retirement age for haulage fleets, with uniform applicability. Given fleet size and volume o

    May 1, 2010

  • CIM
    Long-Term Planning at Raglan

    By Lee W. T. Weitzel

    This paper reviews the Falconbridge- SMRQ?s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    May 1, 2002