Systematic Evaluation of Foundation Reuse for a Metro StationBy Haoran Zhang, Chu Ho
A recent design-build project in New York involved various degrees of additions and improvements to four existing transit stations. Reuse of the existing foundations was considered a more sustainable
Sep 8, 2021
-
Effectiveness of Head-Enlarged CDM Columns in Evaluating Settlement of Improved GroundsBy Y. M. Ha, T. D. Nguyen, D. T. Nguyen, H. K. Choi
Conventionally, cement deep mixing (CDM) columns are designed to have constant diameters over the improved depth as this facilitates the construction procedures. However, this design pattern may be in
Jan 1, 2019
-
Design Build of the New NY Bridge FoundationsBy Leykam Chris J., Jacobs Scott. A.
"Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze
Jan 1, 2016
-
Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, ColoradoBy Kyle Kershaw
Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty
Jan 1, 2007
-
A Study On Performance Of Piles Based On Methods Of InstallationBy Babu K. V., Samyukta P.
The energy demand in India is expected to show increasing growth in the next few decades. The oil companies in India are revamping the existing oil refineries as well as constructing new refineries ac
Sep 1, 2022
-
Helical Pile-to-Pile Cap Connections Subjected To Uplift Forces: Improving Future PracticeBy Serhan Guner, Sundar Chiluwal
Although significant research has been conducted on helical piles, there is a lack of research and official design provisions on the helical pile-to-pile cap connections. These connections may govern
Jan 1, 2019
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Rehabilitation of the Kölnbrein Dam / AustriaBy Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Structural Evaluation of Thermal Integrity Profile Results of Transmission FoundationsBy Ryan Weaver, Travis Coleman
The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b
Jan 1, 2019
-
Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale EffectsBy Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami
"Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha
Jan 1, 2015
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
The Impact Of End Bearing Plate On Micropile Capacity Casted In Cohesive SoilBy Soorkty Elarabi
The aim of this paper is to discuss the impact of end bearing plate on the capacity of micropile. Preliminary studies have been made in Sudan in specific area of cohesive soil. Experimental works were
Oct 1, 2022
-
Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)By Donald R. Clark
"Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
Jan 1, 2017
-
Optimization Of Design Of Drilled Shaft Foundations By Lateral Load TestingBy Donald R. Clark
Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
-
Installation Of Drilled Piers In Shales ? SynopsisBy A. C. Ackenhell
The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of
Jan 1, 2010
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case StudyBy Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
Repairs Of Diaphragm Walls, Lessons LearnedBy Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th