Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Modern Practices Of Post Taphole Operation In Ferro Chrome Production And Its AdvantagesBy S. K. Mahata, P. G. Suresh Kumar, B. B. Singh
Improvement of post tap hole practices is achievable by mechanized handling of melt during the production of Ferro Chrome, resulting in higher recovery of chromium. The paper deals with modern practi
Jan 1, 2007
-
Fluidization Behaviour Of Various Titania Feedstocks - Synopsis (c98f5f86-f8e8-44a9-bf93-967eb1bbd46b)By S. Moodley
In the chloride process for TiO2 pigment production, various titania feedstocks (i.e. rutile, synthetic rutile, slag, and upgraded titania slag (UGS)) are chlorinated in a fluidized bed reactor with p
Jan 1, 2012
-
Flotation cPlant: an Optimum Modular ApproachBy Luis Rudolphy, Pekka Tähkiö
"Flotation plant design, construction and start-up can be challenging tasks, because multiple factors and disciplines have to be combined in an efficient manner, in order to execute a project that mee
Jan 1, 2015
-
Installation of Resin-Grouted Rockbolts in Hard Rock Mining:Challenges and Solutions for Improved SafetyBy T. G. Maepa
"The creation of mine excavations alters the stress distribution in the surrounding rock mass. In modern mining, resin-grouted rockbolts are used as a means of support in order to redistribute stresse
Jan 1, 2017
-
The effects of water recycling on nickel-copper ore at a North American concentrator, A. Di Feo, K. Volchek, L. Morin, A. Demers, and S. MortazaviBy L. Morin, S. Mortazavi, K. Volchek, A. Demers, A. Di Feo
The objective of this paper was to investigate the possibility of reducing process (fresh) water and increasing recycled water (thickener tank overflow water). As part of the investigation, rougher fl
Jan 1, 2020
-
The Use of Fuzzy-Weighted Binary Integer Goal Programming to Select the Optimum Site for a Central Processing PlantBy E. Bakhtavar, R. Mikaeil, D. Khademi
"Fuzzy-weighted integer goal programming has been developed and used to select the most suitable site to construct a central processing plant for several adjacent small-scale dimension stone quarries,
Jan 1, 2017
-
Pre-processing and characterization of PCBs to unlock opportunities for local end processing in developing economies. T. Moyo and J. PetersenBy J. Petersen, T. Moyo
Waste Printed Circuit Boards (PCBs) are a metals-rich fraction of electronic waste (e-waste) streams, and globally it has been demonstrated that they can be recycled gainfully to recover the metals. R
Jan 1, 2020
-
Flotation flowsheet for eliminating pyrite in tailings: a cleaner production solution, Y.L. Botero, L.A. Cisternas, L. Cortes, and A. Lopez-ValdiviesoBy L. A. Cisternas, A. Lopez-Valdivieso, Y. L. Botero, L. Cortes
In the processing of sulfidic ores, pyrite is usually depressed and ends up in the tailings. However, pyrite is the most common species responsible for acid mine drainage (AMD) due to its spontaneous
Jan 1, 2020
-
Extraction of Zinc from Zinc Ferrites by Alkaline Leaching: Enhancing Recovery by Mechanochemical Reduction with Metallic IronBy J. Bai, C. Zang, W. Yuan, L. Zhuang
"This study evaluates the efficiency of using mechanochemical reduction to assist the extraction of zinc from zinc ferrites by alkaline leaching. The transition of zinc ferrite into a metastable state
Jan 1, 2016
-
Isothermal titration calorimetry and density functional theory comparison study of xanthate, dithiophosphate and dithiocarbamate adsorption on pyrite surfaces M.G. Mulaudzi, J Taguta, B. McFadzean, and P.E. NgoepeBy J Taguta, B. McFadzean, P. E. Ngoepe, M. G. Mulaudzi
Computational modelling methods and isothermal titration calorimetry (ITC) were employed to investigate the interaction of a pyrite surface with thiol collectors. Modelling work was conducted in the p
Jan 1, 2020
-
Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System ? Synopsis (cd7f692e-c8f8-43df-8e10-650656e74357)By N. Hanief
This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per
Jan 1, 2012
-
A Protocol For Conducting And Analysing Plant Trials: Testing Of High-Chrome Grinding Media For Improved MetallurgyIt is widely accepted that the type of grinding media has an impact on the grinding chemistry and subsequent flotation behaviour of the sulphide minerals being separated. There are countless laborato
Jan 1, 2012
-
The Influence of Mining Sequence and Ground Support Practice on the Frequency and Severity of Rockbursts in Seismically Active Mines of the Sudbury BasinBy A. Sampson-Forsythe, P. Morissette, A. R. Punkkinen, D. R. Chinnasane
"The performance of ground support systems under dynamic loading is typically assessed in a qualitative and subjective manner. As a result, it is difficult to develop an explicit knowledge on the mech
Jan 1, 2017
-
A Model for Determination of Methane Flow Parameters in Coal from Desorption TestsBy R. D. Lama
This paper presents the results of a study of the mechanics of methane gas flow in coal. Desorption tests carried out on cylindrical coal specimens showed that an analytical formulation can be made to
Jan 1, 1987
-
The Use of Simulation Tromp Partition Curves in Developing the Flowsheet of Plant Extensions at Grootegeluk Coal MineBy T. De Lange
Extensions to the beneficiation plant at the Grootegeluk Coal Mine are currently being planned in order to provide power station coal for Escom's Matimba Power Station, presently under constructi
Jan 1, 1987
-
A Holistic Approach To Control And Optimization Of A PGM Concentrate Flash Drying Unit ? SynopsisBy D. J. de Clerk
Global trends stipulate the need to optimize existing assets while reducing environmental impacts. This paper illustrates the procedure that was followed to achieve such goals at one of the coal burni
Jan 1, 2012
-
Effect Of Hot Rolling Conditions On Ridging In 16wt% Cr Ferritic Stainless Steel Sheet - SynopsisBy K. A. Annan
The last seven hot rolling passes of the ferritic stainless steel AISI430 were simulated on a Gleeble-1500D® thermo-mechanical simulator to investigate the effect of temperature, strain rate, and inte
Jan 1, 2013
-
Re-evaluation of the PlatMine chromitite pillar strength databaseBy M. I. Mabala, B. P. Watson, M. J. Kanda
A failed and stable Upper Group 2 chromitite pillar database was collected in 2007 as part of the PlatMine 1.2 pillar strength project. The database consisted of 177 pillars, of which 33 had failed. M
Nov 27, 2024
-
Cave Management As An Ore Reserve Management Tool Ensuring Optimal Life Of Mine For Palabora Mining CompanyPalabora Mining Company is operating a copper block cave mine in the Limpopo Province of South Africa. The mine was developed in the late nineties with a target ore reserve of 220 million tonnes of c
Jan 1, 2007
-
Fragmentation Studies And Metal Accounting Successes At Kopanang Mine. - SummaryBy FJ Fourie
Lack of success in attempts to develop viable large-scale continuous mining techniques (previously reported by MP o?Hare in 2004) led the team at Kopanang to explore alternative solutions to their ong
Jan 1, 2007