Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Santa Fe Pacific Gold Targets Million Ounces/Year ProductionBy William R. Yernberg
Santa Fe Pacific Gold, headquartered in Albuquerque, NM is expanding its operation at the Twin Creeks Mine in Nevada. The $250-million sulfide expansion project, including the Sage Mill, is under con
Jan 1, 1996
-
The Technological Evolution Of Longwall Mining – Preprint 97-116By M. Karmis, C. Haycocks
The evolution of longwall mining is briefly traced from its inception in England in the 1620's. In the beginning this method recovered 90% of coal with roof closure controlled by packs and walls.
Feb 24, 1997
-
Integration Of Operations And Underground Construction: Sound Transit University LinkBy John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
Current Ground Support Membrane Applications In North American Underground MinesBy L. Lacerda
Spray-on ground support membranes (GSM) or thin support liners hold today perhaps as much potential to impact underground (u/g) ground support operations as dry and later wet-mix shotcrete when introd
Jan 1, 2002
-
Summersville Raw Water IntakeBy Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005
-
Bio-Indicator Evaluation of Water Quality Impacts from Inactive and Abandoned Mines in the Bear Butte Creek Basin of the Black HillsBy A. D. Davis, J. L. Sorensen, C. J. Webb
Environmental impacts from acidic mine drainage are growing national concerns that are particularly acute in the headwaters of the Rocky Mountain region. In the Black Hills of South Dakota, approximat
Jan 1, 1999
-
Owner Procured Tunnel Boring Machines––A DiscussionBy A. R. Biggart, A. Walters, G. J. E. Kramer
The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma
Jan 1, 2005
-
Advances In Autogenous And Semiautogenous GrindingBy Vladimir G. Kochnev
Crushing and grinding account for the major portion (60 to 80 percent) of the overall expenses for ore processing. Autogenous (AG) and semiautogenous grinding (SAG) have been considered a step forward
Jan 1, 2008
-
Planning and Preliminary Design of the North-South Bypass Tunnel, Brisbane, AustraliaBy Tony Peglas, Harry Asche, Eva Wood
The North-South Bypass Tunnel is a new $AUD1.5 billion underground traffic route in Queensland, Australia, a project of the Brisbane City Council. The tunnel is approximately 5.2 km long, bypassing th
Jan 1, 2005
-
Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced TunnelingBy Peter Bigwood
Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come
Jan 1, 2012
-
Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage PreventionBy Fritz Grübl
Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.
Jan 1, 2001
-
Numerical Analysis of a Rock Bolt Load Indicator Washer Neglecting the Stress Relaxation Effect Mining, Metallurgy and Exploration (1651f380-7da4-4089-a8ef-ce53aa560d38)By Eugie Kabwe
Rock bolts are components of tunnel support structures and their efficacy in reinforcement requires the appropriate estimation of the bolt pre-tension. However, cases of ineffective rock bolt applicat
-
Replacing The Stone and Rebuilding the PentagonBy Jim Owens
The methodology of quarrying changed significantly in the Indiana limestone industry in the 60 years between Sept. 11, 1941 and Sept. 11, 2001. The former was the date of the Pentagon groundbreaking
Jan 1, 2005
-
M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined HighwayBy Isabelle Lamb, Manfred K. Lechner, Daniel N. Adams
Sydney Australia’s M5 East Motorway connects southwestern suburbs to the airport. Central to the project are twin 3.8 km roadway tunnels which are mostly driven through rock. In order to come up with
Jan 1, 2001
-
Creating Wealth and Competitiveness in MiningBy John E. Tilton
The ability of companies and countries to mine copper and other mineral commodities competitively and in the process to generate new wealth depends on their mineral endowment. Chile, for example, pro
Jan 1, 2003
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15By O. Ogunsola, M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Feb 24, 1997
-
Challenges Of Conveyors In TunnelingBy Marco Sonnenschein
As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if
Jan 1, 2012
-
Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York CityBy Dean Workman
Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th
Jan 1, 2008
-
Comparison Of Numerical And Analytical Models Of Unsaturated Flow Around Underground Openings, Considerations For Performance Assessments Of Yucca Mountain, Nevada, As A High-Level Nuclear Waste RepositoryBy R. Codell, D. L. Hughson
While benchmarking the integrated finite-volume code MULTIFLO against the analytical solution of Philip et al. (1989) for cylindrical underground openings, we found numerical simulation of dripping th
Jan 1, 2000