Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Calibrating the Lamodel Program for Site Specific Conditions

    By Keith A. Heasley

    The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine

    Jan 1, 2012

  • SME-ICGCM
    Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface Structures

    By Arka Jyoti Das, Prabhat Kumar Mandal

    "Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv

    Jan 1, 2016

  • SME-ICGCM
    An Overview Of The National Roof Evaluation Accident Prevention (REAP) Program

    By J. M. Krese

    This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac

    Jan 1, 1988

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • SME-ICGCM
    Preventing Roof Fall Fatalities during Pillar Recovery: A Ground Control Success Story

    By Michael Gauna, Christopher Mark

    "For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines. Studies showed that a miner on a pillar recovery section was at least three times more like

    Jan 1, 2016

  • SME-ICGCM
    Physical Simulation of Overburden Movement and Stability of Aquiclude in Shallow Seam Mining

    By Qingxiang Huang

    Shallow seam coal field has the largest coal reserve in China. Mining in shallow depth causes serious problems. One of them is subsurface dewatering. In this paper, the physical simulating model was p

    Jan 1, 2006

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Effects of Rock/Coal Interface Property on Coal Pillar Strength

    By Jun Lu

    There are many factors affecting the strength of pillar, including width-to-height (W/H) ratio, mechanical properties of coal and surrounding rocks, property of partings in the coal, and the interface

    Jan 1, 2008

  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • SME-ICGCM
    Longwall Mining in Illinois: A Controversy over Planned Subsidence of Flat Farmland

    By Daniel Barkley

    Underground coal mining in Illinois has a lengthy history dating back to the early 1800?s. High extraction underground mining has played a significant role in production through out this time. Mode

    Jan 1, 2007

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    Application of Phenolic Foam in Longwall Mining

    By Marc Arl

    Failures of the face and roof above longwall shields have caused days and sometimes weeks of lost production. A common recovery method for these failures has been to pump light weight cementitious gro

    Jan 1, 2005

  • SME-ICGCM
    Massive Pillar Collapse: a Room?and?Pillar Marble Mine Case Study

    By Sandin E. Phillipson

    The Mine Safety and Health Administration?s Roof Control Division responded to a massive ground failure at an underground marble mine in northern Georgia. The ground failure occurred in a benched area

    Jan 1, 2012

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    Geologic Conditions Affecting Mineability in the Jane Mine.

    By Stephen J. Harven

    Geologic conditions in eight northern operating sections of Jane Mine, Keystone Coal Mining Complex. Armstrong County, Pennsylvania are defined by utilizing drillhole data and underground geologic map

    Jan 1, 1987

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    Yield Pillar Applications--Impact On Strata Control And Coal Production

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    Geometrical Description of Gateroad Roof Sag

    By Zbigniew Lubosik, Stanislaw Prusek

    "The main elements of hard coal extraction systems in the Polish mining industry, including the characteristics of gateroads, are described, followed by several dozen underground measurements of gater

    Jan 1, 2010

  • SME-ICGCM
    A Holistic Examination of the Geotechnical Design of Longwall Shields and Associated Mining Risks

    By Russell C. Frith

    This paper examines the design of longwall shields, focusing on those aspects that are critical to either their successful application or contribution to failure during longwall extraction. In many i

    Jan 1, 2013