    Longwall Shield Recovery, Using Phenolic Foam Injection for Gob Control As An Alternative to Recovery Mesh

    By James D. Pile

    Following a methane ignition in the active panel of a longwall coal mine, the affected panel was successfully isolated from the rest of the mine. This allowed for the remainder of the mine to return t

    Jan 1, 2013

  • SME-ICGCM
    Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam Chamber

    By Xicai Gao

    With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e

    Jan 1, 2013

  • SME-ICGCM
    3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine

    By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake

    "Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and

    Jan 1, 2016

  • SME-ICGCM
    Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground Operations

    By Ismet Canbulat

    "In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T

    Jan 1, 2010

  • SME-ICGCM
    Prediction Of Subsurface Subsidence For Longwall Mining Operations

    By Yi Luo

    Subsurface strata movements and deformations associated with underground mining activities could cause problems to subsurface structures and water bodies. By incorporating the methods for surface subs

    Jan 1, 2000

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001

  • SME-ICGCM
    Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)

    By Shosei Serata

    Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in

    Jan 1, 1984

  • SME-ICGCM
    Field Measurements of Chain Pillar Response to Longwall Abutment Loads

    By Christopher Mark

    Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess

    Jan 1, 1986

  • SME-ICGCM
    A Decade of Mobile Roof Support Application in the United States

    By Larry Howe

    Second, or retreat mhng with Mobile Roof Supports (MRS) has now been part of coal mining in the United States for a decade Their utilization has evolved into mining applications which vary in seam hei

    Jan 1, 1998

  • SME-ICGCM
    Ground Control Criteria for Coal Reserve Optimization in Multiple-Seam Mines

    By Eric Westman

    Ground control problems caused by multiple-seam interaction frequently sterilize coal reserves. Interaction mechanisms differ for overmining and undermining and are controlled by mining, spatial. and

    Jan 1, 1997

  • SME-ICGCM
    Using The Point Load Test To Determine The Uniaxial Compressive Strength Of Coal Measure Rock (993fe9c2-59a0-4335-9e4c-58da9811402f)

    By John A. Rusnak

    Point load testing is used to determine rock strength indexes in geotechnical practice. The point load test apparatus and procedure enables economical testing of core or lump rock samples in either a

    Jan 1, 2000

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines

    By Yoshiaki Fujii

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat

    Jan 1, 1992

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Highwall Augering In Ultra-Thick Western Coal Reserves: Unique Geotechnical And Operational Challenges

    By Timothy Ross

    The Pittsburg & Midway Coal Mining Co.'s Kemmerer Mine is one of the deepest surface coal operations in the world, with the highwall extending to approximately 1,000 ft above the pit floor. To in

    Jan 1, 1999

  • SME-ICGCM
    Hydraulic Fracturing Of Sandstone And Longwall Roof Control - Implementation And Evaluation

    By D. W. H. Su

    Following a roof fall in the B12 headgate of a CONSOL Pennsylvania Coal Company (CCPC) underground coal mine in February 1998, CONSOL R&D and Exploration initiated an underground roof geology reconnai

    Jan 1, 2001

  • SME-ICGCM
    Surface Subsidence Caused By Flooding and Dewatering at Four Abandoned Coalmines in the US

    By Kewal K. Kohli, Stefanie Self

    "Three cases of surface subsidence investigated over abandoned coal mines after flooding in one case and dcwatering in two cases are presented in this paper. Mining was conducted by the room and- pill

    Jan 1, 2010

  • SME-ICGCM
    An Overview Of Bureau Of Mines Ground Control Research

    By John M. Karhnak

    The Bureau of Mines has a long history of research in Ground Control. For many years, this work was done at Bureau facilities by Bureau researchers. As the tiles changed, however, the area of research

    Jan 1, 1981

  • SME-ICGCM
    CBM Extraction Engineering Challenges and the Technology of Mining the Upper Protective Seam in the Daxing Mine, China

    By Yuanping Cheng, Jingyu Jiang, Qiang Zhang

    "With the increase of mining depths, deep-seated coal seams face threats from high ground stresses, high gas pressures, high gas content, and low seam permeability, which significantly increase the li

    Jan 1, 2017

  • SME-ICGCM
    Void Fill and Support Techniques to Stabilize Drift Excavated Through a Transition Zone Mined By a TBM at the Stillwater Mine

    By Josh Johnson, Stephen Tadolini, Mark Ferster, Curt Jacobs

    "Stillwater Mining Company is the only U.S. producer of platinum group metals (PGMs) and the largest producer outside of South Africa and Russia. The Company controls a considerable portion of the J-M

    Jan 1, 2016