Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Longwall Pace Bursts and Inadequate Caving: A Came Study

    By K. Y. Haramy

    Deep coal mines with strong roof and floor strata frequently encounter face and rib bursts. The burst problem becomes more severe with increased depth. While the exact causes of bursts are often diffi

    Jan 1, 1987

  • SME-ICGCM
    Mine Design Considerations For Surface Subsidence Control

    By John L. Edwards

    The underground coal mines in the Lake Macquarie area of the Newcastle Coalfield, New South Wales, Australia are constrained by surface subsidence restrictions as low as 150 mm. The mining environment

    Jan 1, 1993

  • SME-ICGCM
    Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems

    By Reha Ozel

    The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three

    Jan 1, 1990

  • SME-ICGCM
    First Caving And Its Effects--A Case Study

    By S. M. Hsiung

    In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig

    Jan 1, 1984

  • SME-ICGCM
    Roof Behavior In South African Coal Room And Pillar Panels

    By Bruce W. Jack

    An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using

    Jan 1, 2000

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    The Initial Performance of Commonly Used Primary Support on U.S. Coal Mines

    By Murali Gadde

    U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio

    Jan 1, 2011

  • SME-ICGCM
    Prediction of Inter-Strata Movements Above Longwall Faces (bade68bf-520f-401d-9d3a-43ba4395e61a)

    By Neil Styler

    This paper presents an analysis of measurements of inter-burden de- formations above six longwall faces. An attempt is made to demonstrate some correlation between the movements at the various sites,

    Jan 1, 1984

  • SME-ICGCM
    Extraction Ratio In Thin Seams Assuring No Surface Subsidence

    By Kot F. v. Unrug

    The depletion of thicker coal reserves has resulted in the thinner seams being economically attractive. Surface protection against subsidence limits the extraction ratio to 50% for the room and pillar

    Jan 1, 2001

  • SME-ICGCM
    Development And Evaluation Of A Floor-Bearing Capacity Test Apparatus

    By Daniel W. H. Su

    A floor-bearing capacity test apparatus was designed and constructed to determine the true bearing capacity of soft floor materials beneath coal pillars or longwall face supports. The apparatus has be

    Jan 1, 1993

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    State Of The Art Testing Of Powered Roof Supports

    By Robert C. Garson

    The Mine Roof Simulator at the DOE'S Mining Equipment Test Facility is described. Its use in the research and development on the behavior and response of longwall roof supports to simulated mine

    Jan 1, 1982

  • SME-ICGCM
    Evaluation Of Existing Predictive Methods For Mine Subsidence In The U. S. (1ec2d374-5864-4775-9b19-24759c4f95be)

    By Vladimir Adamek

    Two existing predictive methods were chosen for evaluation; an influence function (Gals Theory) and a profile function (hyperbolic). These were applied to several field measured subsidence pro¬files o

    Jan 1, 1981

  • SME-ICGCM
    Evaluation Of Surface Subsidence Potential Along A Pipeline Due To Abandoned Coal Mine Works

    By Thomas L. Vandergrift

    With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern

    Jan 1, 2000

  • SME-ICGCM
    Drag Picks - Influence Of Tool Geometry And Angle Of Arrack On The Stress Evolution And Cutting Efficiency

    During the last decade mechanical rock excavation has become increasingly widespread in the mining industry and, more in general, in excavation engineering. This technology, especially the tools and t

    Jan 1, 1990

  • SME-ICGCM
    Modern Geotechnical Exploration And Mine Design

    By Patrick S. Artrip

    A deep mining operation in the Lower Kelly (Imboden) seam in Wise County, Virginia experienced severe ground control conditions in its attempt to develop reserves situated under increasingly higher co

    Jan 1, 1993

  • SME-ICGCM
    Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)

    By S. I. Al-Ameen

    Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes

    Jan 1, 1992

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    Mitigation of Longwall Subsidence Effects on Operating Railroad

    By Robert Kimutis, Ke Yang, Yi Luo, Jianwei Cheng

    "Surface subsidence processes, especially those associated with a longwall mining operations, could cause operational and/or safety problems to railroads. For railroads with normal amounts of traffic,

    Jan 1, 2010