Search Documents

  • AIME
    New Process For Copper Anode Slime Treatment At The Hitachi Smelter & Refinery

    By Junichi Sato, Takash Suzuki, Tatsuo Imamura, Mamoru Hojo

    INTRODUCTION Hitachi Refinery of Nippon Mining Co., Ltd. was constructed in 1911. The refinery began early to recover by-product metals and to manufacture copper products. Today, the refinery reco

    Jan 1, 1976

  • AUSIMM
    Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold Mine

    By P Trout, B Macaulay

    Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success

    Jan 1, 2005

  • NIOSH
    RI 2847 Prevention Of Hydrogen Sulphide Poisoning In Handling And Refining High-Sulphur Petroleums ? Introduction

    By H. C. Fowler

    Hydrogen sulphide associated with the gasps and vapors from certain crude oils now produced in the United States has forced a serious health and safety problem upon the petroleum industry. Although th

    Jan 1, 1927

  • NIOSH
    RI 4178 Georgia Iron Deposits, Cherokee, Bartow, Floyd, and, Polk Counties in Two Parts Part I

    By Walter T. Lewieki

    "INTRODUCTION Numerous deposits of iron ore are found in Cherokee, Bartow, Floyd, and Polk Counties in northwest Georgia. The deposits are generally small and irregular in shape. The ore is usually re

    Jan 1, 1946

  • SAIMM
    Spotlight ? INFACON 7 ? Trondheim, Norway, June 1995

    By N. A. Barcza

    INFACON 7, the seventh International Ferro Alloys Congress, took place in Trondheim, Norway, in June 1995. The main aim of the Congress, which was held under the auspices of Euroalliages and the Norw

    Jan 1, 1996

  • SME
    TARP Tunnel Boring Machine Performance Chicago

    By William A. Macaitis, Frank E. Dalton, Leo R. DiVita

    The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil

    Jan 1, 1993

  • TMS
    An Overview of Research on AU & AG Recovery in Copper Smelter

    By Zhonglin Ye, Yifeng Shi

    "This paper has outlined forms of Au & Ag losses in copper smelting process and methods for increasing Au & Ag recovery, analyzed factors influencing Au & Ag recovery in copper converting process, pre

    Jan 1, 2013

  • NIOSH
    OFR-14-78 Development Of Optimized Diffuser And Spray Fan Systems For Coal Mine Face Ventilation

    By Robert E. Wallhagen

    This report describes the results of a four year investigation into improved face ventilation systems for underground coal mines. The objective was to experimentally determine configurations for a dif

    Jan 1, 1977

  • SME
    Gold Companies Look at Mexico, Dominican Republic

    By Steve Kral

    When the price of gold cracked the US$9.60/g(US$300/oz) mark last year, the gold-mining industry began to crank up again. This followed several years of gold prices that had languished in the mid-200

    Jan 1, 2003

  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • NIOSH
    OFR-24-87 Products Of The Oxidative Thermal Degradation Of Mine Stoppings And Mine Reinforcing Materials

    By K. L. Paciorek

    The primary objective of this program was to determine the toxic fume and fire hazard of materials used in the construction of mine stoppings and in the sealing and reinforcing of mine ribs and roofs.

    Jan 1, 1983

  • DFI
    Comparison Of Static Load Test And Dynamic Pile Testing Results

    By Patrick J. Hannigan

    A comparison of 40 statically and dynamically load tested piles was performed to evaluate the variation between testing methods. This evaluation indicated an agreement of 10% to 15% could be obtained

    Jan 1, 1987

  • DFI
    Permanent Displacement And Pile Driving Vibrations - Summary

    By Charles H. Dowding

    Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta

    Jan 1, 1991

  • CIM
    Oxygen Mass Transfer in the Albion Process™: From the Laboratory to the Plant

    "The successful commissioning and ramp up of the Albion Process™ at the GPM Gold Project relied on the successful scaling up of the process from batch and continuous pilot plant campaigns (Voigt et a

    Jan 1, 2017

  • NIOSH
    IC 8689 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines - Mines With Annual Production Of 1.03 To 3.09 Million Tons From A 48-Inch Coalbed - Revision Of Information Circular 8641

    By Sidney Katell

    This Bureau of Mines study estimates capital investment, operating costs, and selling prices for three underground bituminous mines producing coal with annual production ranging from 1.03 to 3.09 mill

    Jan 1, 1975

  • SAIMM
    Effect of Roughness on the Peak Shear Strength of Clay Infilled Joints under Constant Normal Stiffness

    By A. Haque

    The shear behaviour of infilled joints produced from ordinary gypsum plaster (gyprock) and bentonite was investigated in the laboratory under Constant Normal Stiffness (CNS) conditions. Shear tests we

    Jan 1, 2003

  • NIOSH
    OFR-84(9)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume IX - Water Generator

    By C. B. Manula

    This report is volume 9 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1975

  • SME
    Stability Of Open Stopes Intercepted By Graphitic Shears At Ashanti Gold Fields Company Ltd., Obuasi Operations In Ghana

    By A. Adu-Acheampong

    A geotechnical study was conducted to identify the cause(s) of stope instability at the Ashanti Mine (Obuasi, Ghana). As part of the investigation, laboratory testing of rock was performed and the roc

    Jan 1, 2003

  • CIM
    New Developments in Characterization of Sulphide Refractory Gold Ores

    By S. E. Jackson, L. J. Cabri

    Quantitative determination of gold at sub-ppm concentrations in sulphide minerals is an important component of deportment studies for sulphide-gold deposits. Laser Ablation Inductively Coupled Mass Sp

    Jan 1, 2011

  • CIM
    Flotation Process Optimization Using Outotec Frothcontrol Solution

    By M. Mononen, J. Huuskonen, M. Vauhkonen, J. Kourunen, A. Lehikoinen

    "A new approach to measure process conditions in flotation cells is presented. Real scale flotation cells in a Zinc circuit are imaged using Outotec LevelSense sensors based on electrical resistance t

    Jan 1, 2013