Making money from wastes: a custom circuit within Clarabelle MillBy Alain Bouchard, Germain Labonté, Jim Barrett
"Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin
Jan 1, 2002
-
TECHNOLOGY NEWS – Tackling India’s Coal Ash ProblemBy Gary Brendel
India produces about 70 Mt/a (77million stpy) of coal ash (fly ash and bottom ash) from burning about 200 Mt/a (220 million stpy) of coal for electric power generation. The average ash content is 35%.
Jan 1, 1999
-
The Control of Fines through Improved Blast DesignFines and unnecessarily small rock fragments are created by as many as four identifiable breakage mechanisms which operate close to the charged section or sections of the blasthole. The peak blasthole
Jan 1, 1979
-
Human Vibration Levels In The South African Mining IndustryBy J. L. van Niekerk
The research project reported on represents the first comprehensive attempt to measure the vibration levels of a variety of tools and equipment in the South African mining industry to determine the ef
Jan 1, 2000
-
RI 3614 Manganese Investigations - Metallurgical Division - 5. Ore-Dressing Studies Of Manganese Ores ? Beneficiation Of Manganese Wad Ore From The Chinn Property, Batesville, Ark.By S. M. Shelton
Tests employing various ore-dressing methods were made on a manganese wad ore from the W. A. Chinn property in the Batesville-Cushman district of Arkansas in an effort to develop a practicable procedu
Jan 1, 1942
-
Canadian Paper - Loading Ore Underground with Scrapers at the Utah-Apex MineBy S. P. Holt
The chief use of scrapers at this mine has been on lead ore of milling grade, clean and dry, in stulled stopes, 50-100 ft. long, 5-12 ft. high, and pitching 20-30°. Scrapers have also been used to fil
Jan 1, 1923
-
Canadian Paper - Loading Ore Underground with Scrapers at the Utah-Apex MineBy S. P. Holt
The chief use of scrapers at this mine has been on lead ore of milling grade, clean and dry, in stulled stopes, 50-100 ft. long, 5-12 ft. high, and pitching 20-30°. Scrapers have also been used to fil
Jan 1, 1923
-
Quantification of the impacts of coalmine water irrigation on the underlying aquifers - SynopsisIt is predicted that vast volumes of affected mine water will be produced by mining activities in the Mpumalanga coalfields of South Africa. The potential environmental impact of this excess water is
Jan 1, 2009
-
Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event SimulationBy J. M. Simard, S. Morissette, P. Coursol, P. Mackey
A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is
Jan 1, 2009
-
Introduction of China’s Copper Converting TechnologiesBy Huilan Yang, Feng He
This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting
Jan 1, 2019
-
IC 8835 Guide To Substation Grounding And Bonding For Mine Power SystemsBy Wils L. Cooley
Although electric utility companies have been active in grounding and bonding within substations, the mining engineer or mine electrical engineer is not involved to the extent that he can be fully up-
Jan 1, 1980
-
Safe mining practice at Quinsam coal mineBy K. Galovich, P. Krivokuca
"Quinsam coal mine is located about 25 km west of Campbell River on the east coast of Vancouver Island, British Columbia. Using continuous miners in a fully mechanized retreat room-and-pillar operatio
Jan 1, 2004
-
OFR-152(2)-83 Noise Attenuating Properties Of Earmuffs Worn By Miners - Volume 2: Development Of A Laboratory Procedure For The Physical Measurement Of Earmuff AttenuationBy Kenneth C. Stewart
The overall purpose of this study was to develop and evaluate, in the laboratory, instrumentation and procedures which might allow for the use of physical measurements of earmuff attenuation which wou
Jan 1, 1980
-
Laboratory Flotation of Endeavour Inlet, N.Z. Antimony OreAntimony ore samples (mean assay 18·7 per cent antimony) from Endeavour Inlet, Marlborough Sounds New Zealand, were tested for upgrading by flotation to a saleable product (60 per cent antimony).
Jan 1, 1977
-
Classification of underground mining methodsBy P. A. Rossouw, G. A. Fourie
Several attempts have been made over the latter half of the twentieth century to devise a system for the classification of underground mining methods. None of these are found to be totally successful.
Dec 1, 1996
-
OFR-114-84 Erodibilities And Eroded Size Distribution Of Western Kentucky Mine Spoil And Reconstructed TopsoilBy B. J. Barfield
Standard erosion plots (4.6 m by 22.1 m on 9 percent slope) were constructed on the Alston Surface Mine of Peabody Coal Company in Western Kentucky to evaluate the effects of placement technique and d
Jan 1, 1983
-
Detection of collectors on concentrator mineral grains by time-of-flight secondary-ion mass spectrometry (TOF-SIMS)By E. Niehuis, J. Y. Kim, H. G. Cramer, S. L. Chryssoulis, K. G. Stowe, C. Bendel
TOF-SIMS was used to detect, identify from parent molecular ions and determine the relative concentrations of collectors sorbed on the surface of mineral particles in concentrate and tailings samples
Dec 1, 1995
-
IC 8380 United States Coals In World MarketsBy George Markon
The importance of United States coal exports as a component of the national economy, the potential for growth of these exports, and the inter-national character of this sector of the coal industry are
Jan 1, 1968
-
Optimizing The Life Of Ore Passes In A Deep-Level Gold MineBy P. R. Brenchley
Main ore pass systems should last the life of a mine, and too often expensive and hazardous remedial measures are required to repair a damaged ore pass in an attempt to extend its life. In order to ma
Jan 1, 2006
-
L-73 Tunnel, Woodbury, MinnesotaBy Michael B. Gilbert
The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o
Jan 1, 2008