  • CIM
    Integrated Operations for Maximizing Results

    By D. Schleiss

    Reduced access to knowledgeable workers is creating challenges for operations. We are doing more 4D Operations - dirty, dull, dangerous, and distant. Personnel costs in these environments are high, an

    Jan 1, 2014

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No. 3 Shaft

    Konkola No 3 shaft experienced severe mining-induced stress and time-related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • SAIMM
    Factors Governing The Strength And Elastic Properties Of A Physical Model Material Used For Strata Mechanics Investigations

    By H. Yavuz

    Physical modelling is one of the research tools in the understanding of the failure mechanisms and the deformations likely to be experienced by the strata during mining operations. Success of the phys

    Jan 1, 2003

  • CIM
    Sustainable innovation in underground hardrock mining technology

    By A. Bamber

    Canadian leadership in a global mining context will depend not only on entrepreneurship and best practice but also on technological innovation. This paper argues for more ambition and commitment to R&

    Jan 1, 2005

  • NIOSH
    RI 4986 Investigation Of The Copper Bullion Claims, Rua Cove, Knight Island, Alaska ? Introduction

    By F. A. Rutledge

    The Bureau of Mines Investigated the Copper Bullion claims at Rua Cove on the east coast of knight Island in Prince William Sound, Alaska, during November-December 1948 and March-April 1949. This proj

    Jan 1, 1953

  • CIM
    A New Analytical Model to Simulate SAGD Process Considering Geomechanics

    By A. Azad

    SAGD (Steam Assisted Gravity Drainage) is an in-situ oil recovery technique for heavy oil reservoirs. The technique has been successfully applied to many projects in the past 25 years and the process

    May 1, 2009

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • AUSIMM
    Flow Sheet Simulation of Municipal Waste Treatment Processes

    Flow Sheet Simulation of Municipal Waste Treatment Processes

    Sep 13, 2010

  • DFI
    Plastoelastic Analysis Of Bearing Capacity For Soil Anchor

    By Hui Yongning

    This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla

    Jan 1, 1991

  • SME
    Manhattan?s Transformation Is Talk Of The Town At Fox Conference

    Where space is limited, as it is throughout most of the northeastern United States, new construction either takes place high above street level, or below it. In Lower Manhattan, NY both kinds of expan

    Jan 1, 2007

  • SAIMM
    Problem Of Non-Normality In Statistical Quality Control: A Case Study In A Surface Mine

    By B. Samanta

    A quality characteristic analysed through construction of the Shewhart control chart is required to be normally distributed. In mining applications, this assumption is often violated as many quality c

    Jan 1, 2004

  • ISEE
    Test Study about the Law of the Action of Throw Blast Under Inclined boundary Conditions

    By Wang Hong Qu

    This paper observes the shape of throw explosion crater its ejecta locus of internal medium and the process of distance along with slope's angle developing. It was discovered that initial velocity is

    Jan 1, 1991

  • AUSIMM
    Alliance Type Contracts

    When it comes to structuring major mining contracts, the two most widely adopted formats are æmeasure and valueÆ and æcost-plusÆ. A problem with both of these formats is the difficultly of aligning th

    Jan 1, 2007

  • SME
    Recovery of Heavy Metals from Liquid Effluent by Galvanic Cementation "Mining, Metallurgy & Exploration (2021)"

    By Yehia M. Youssef, Nourhan Moukhtar, M. H. Abdel-Aziz, Ibrahim Hassan

    Copper was recovered from copper sulfate solution in a batch-recycled galvanic reactor operated under forced convection with the generation of electrical energy during the cementation process. The div

    Oct 2, 2020

  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • NIOSH
    OFR-76-75 Mine Electrical Systems Evaluation - Executive Summary

    By Robert Stefanko

    This report abstracts project work performed for the USBM Grant No. GO-133077 during the period 19 June 1973 to 15 October 1974. Five reports have been separately produced and are as follows: 1.

    Jan 1, 1974

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • AUSIMM
    Management of Change ù The Transformation of UK Coal Project 105

    In the UK during the 1990s the energy companies had developed a policy of æDash for GasÆ, building large natural gas power stations to produce more than 30 per cent of the UKÆs electricity demand. The

    Jan 1, 2005

  • SME
    The Spillway Dilemma For Mine Tailings Closures

    By T. Clarkin

    This paper presents a hydrologic closure design concept to minimize the risk of water discharges from closed mine tailings facilities. It evaluates the applicability of U.S. Nuclear Regulatory Commiss

    Jan 1, 2012

  • SAIMM
    Considering in situ grade variability during mining sequence

    By R. Peroni, J. Kopp

    Mine planning and scheduling is based on using a geological model for the deposit. Blocks are used to discretize the deposit into mineable volumes where grade values are assigned. Traditional estimati