Search Documents

  • SME
    Optimizing Usage Of Installed Size Reduction Power At Minera Peñasquito

    By S. Dixon

    The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acquisition o

    Jan 1, 2012

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • ISEE
    Generating Site Specific Blast Designs with State-of-the-Art Blast Monitoring Instrumentation and PC Based Analytical Techniques

    The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and

    Jan 1, 1994

  • SAIMM
    Sampling Of Run-Of-Mine Mill Feed - A Practical Approach

    By K. I. Afewu

    A modified approach to the implementation of Gy?s sampling theory is discussed and used to design a procedure for sampling crushed gold ore feed to metallurgical process plants. The approach involves

    Jan 1, 1998

  • SME
    Analysis Of The Mining Engineering Faculty Pipeline

    By M. M. Poulton

    Universities are not immune from the large number of retirements facing the mining industry. Department heads anticipate that we will need to replace all of the senior mining engineering faculty in t

    Jan 1, 2012

  • SME
    Building the Underground River to Service Buenos Aires

    By Bernie W. Martin, Raymond Leray, Christian Criado

    Aguas Argentinas,1 a consortium managed by Lyonnaise des Eaux of France and operator of the world’s biggest privatized water supply and waste water collection system for the City of Buenos Aires, a ci

    Jan 1, 1997

  • SME
    Galena Mine - Discovery of Silver-Copper Ore in the Galena Mine in the Coeur d'Alene Mining District of Northern Idaho

    By S. Norman Kesten

    The Galena mine is located astride the Polaris fault in the Coeur d'Alene district of northern Idaho. The surface installations are about a mile up Lake Gulch, the mouth of which is about 2.4 km

    Jan 1, 1990

  • NIOSH
    OFR-2(1)-81 Efficiency And Service Life Of Wire Rope Terminations

    By F. Matanzo

    [Nine wire rope terminations were pull tested and fatigue tested to destruction to measure the termination efficiency and relative fatigue life. The terminations were selected on the basis off mine si

    Jan 1, 1978

  • AUSIMM
    The Demonstration of Electronic Systems to Assist in the Management of a Significant Incident

    By R Moreby

    This paper is a demonstration of the techniques developed during an Australian Coal Association Research Program (ACARP) funded research project aimed to develop aids, principally computer based, to a

    Jan 1, 2005

  • AUSIMM
    Real-Time Risk Analysis and Hazard Management

    Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar

    Jan 1, 2005

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • SME
    Risk Ranking In Tunneling Projects With Fuzzy Electre Method

    By A. Yazadni-Chamzini

    Risk ranking of projects is one of the importance parts of the complicated risk management procedure. Recognizing the riskiest criteria enable the managers to plan for risk reduction. The first stage

    Jan 1, 2012

  • TMS
    Dynamics of Splash Formation in Gas Injected Systems

    By N. B. Gray, A. E. Guerra, D. E. Morton

    "The formation of splash in pyrometallurgical operations that involve the injection of gases into a liquid has been the subject of a number of studies over the last few decades. Given the complexity o

    Jan 1, 1996

  • CIM
    Mining Methods at Canadian Malartic

    By E. V. Neelands

    THE Canadian Malartic mine is in Western Quebec, about fifty miles east of Noranda and forty miles south of Amos on the Canadian National railway. The recently constructed branch of the railway from R

    Jan 1, 1939

  • SAIMM
    Development Of A Mathematical Model For Continuous Tank Bioleaching

    By L. Bircumshaw

    Paper written on project work carried out in partial fulfilment of BSc (Eng) (Chemical) degree This paper details the formulation of a mathematical model for the simulation of a primary bioleach re

    Jan 1, 2006

  • NIOSH
    RI 2582 The Distribution Of Sulphur In Crude Petroleum

    By N. A. C. Smith, D. D. Stark

    "Sulphur is apparently a normal Constituent of crude petroleum, but in most crudes is present in percentages of less than one-half of one per cent. Some crudes, however, contain more, and occurrences

    Mar 1, 1924

  • NIOSH
    Water Jet Perforation Of Well Casings - Objective

    Reduce the cost of modifying uranium well casings so that leaching solutions can pass through, but sand grains are blocked. Approach The well casing and surrounding cement are perforated at th

    Jan 1, 1978

  • CIM
    High Pressure Grinding of Gold Ore HPGR Demonstration at Newmont’s Lone Tree Mine

    By Polysius AG

    "The Lone Tree demonstration was an important milestone in bringing High Pressure Grinding Roll (HPGR) technology into hard rock applications in the mining industry. HPGRs have become standard equipme

    Jan 1, 2005

  • NIOSH
    OFR-22(2)-77 Inherently Safe Mining Systems (Conventional) - Phase III - Volume II - Appendixes

    By D. O. Hamiltion

    The ISMS program provided for the development and demonstration of equipment modifications in both conventional and continuous coal mining systems. This report describes activities during the demonstr

    Jan 1, 1976