Search Documents

  • CIM
    Diamond Project Development ? An Holistic Approach

    By Jarek Jakubec

    The new euphoria in diamond exploration brings with it a need to understand the challenges that new projects can face in different stages of the development and risks that the commercial outcomes from

    May 1, 2006

  • ISEE
    Improved Coal Extraction Using Signature Hole Analysis and Electronic Detonators at the Knight Mine

    By Stuart Brashear, Eddie Colburn

    The Birmingham Coal and Coke – Knight Mine is a single seam coal mine in central Alabama. As pit development progressed in 2013, concerns over increasing vibration levels resulted in modifications to

    Jan 1, 2015

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • SME
    Developing And Implementing An Enterprise Reliability Strategy (ERS) In Mining Operations

    By J. W. Davis

    In the last few years major industrial companies have begun to realize the importance of Reliability as an enterprise strategy that, properly implemented, will improve financial performance. Typical

    Jan 1, 2003

  • CIM
    Shovels And Draglines In Western Canada and Factors Affecting Hoist-Rope Service

    By R. G. Hamm

    A brief outline covering the shovels and draglines in use in the open-pit mines of Western Canada, including British Columbia, Alberta and the Yukon, is given, followed by the procedure for the select

    Jan 1, 1979

  • TMS
    Motivating Sustainable Material Use through Industry-Level Simulation Modeling of Platinum Stocks and Flows

    By Elisa Alonso

    Manufacturing firms that rely on finite resources have a stake in ensuring sustainable materials use. Higher material prices and uncertain material supply, consequences associated with scarcity, can b

    Jan 1, 2010

  • SAIMM
    Mineralogical Solutions For Pyrometallurgical Problems

    By L. Andrews

    Keywords: mineralogy, phase-chemical, chemical-looping combustion, XRD, SEM, EDS, QEMSCAN, PGM, slag, matte, ilmenite Mineralogy, traditionally associated with concentrator studies, is being incre

    Jan 1, 2011

  • IIMP
    Dimensionamiento óptimo del muestreo empleando geoestadística

    By Samuel Canchaya Moya

    Si bien en las últimas décadas se aplicó el estudio de la geoestadística en la minería, el uso de la técnica no ha logrado una mayor difusión. En ese sentido, el presente texto señala la aplicación de

    Jul 31, 2003

  • AUSIMM
    Flotation Practice at Mount Lyell

    THE flotation plant at Mount Lyell was erected, primarily, for the treatment of ore from the Lyell Comstock mine. These workings are situated over a mile in a direct line north of the North Mount Lyel

    Jan 1, 1920

  • AUSIMM
    Infrastructure Needs and Costs for Mining Projects

    By Gibbs R

    The objective of this paper is to provide a broad qualitative perspective of the needs and costs of infrastructure associated with typical mining projects. Infrastructure may be defined as anything

    Jan 1, 1990

  • AIME
    Division Lectures - The Thirty-eighth Henry Marion Howe Memorial Lecture - Role of Chemistry in Metallurgical Research

    By Lawrence S. Darken

    STAFF: Editor, Gerhord Derge Cornegie Institute of Technology Schenley Pork Pittsburgh 13, Pa. Editorial Assistant, M. A. Redmerski Production Editor, Otto T. Johnson THE METALLURGIC

    Jan 1, 1962

  • IOM3
    Investigation of blasting parameters to optimize fragmentation

    By O. Dojcar

    The results of a laboratory investigation of rock fragmentation conducted with a model material were partially verified under field conditions. The object of the investigation was to study the qualita

    Jan 1, 1991

  • AUSIMM
    The Risdon Sulfuric Acid Plant of the Electrolytic Zinc Company of Australasia Limited

    The acid plant consists of the following units: 1. Glover tower. 6. Mills-Packard type chambers. 3. Reaction towers. 6. Gay-Lussac towers.The sulphur dioxide bearing gases, used in the manufacture of

    Jan 1, 1934

  • AIME
    Charles Kirchhoff-In Memoriam

    Born, March 28, 1853 Died July 23, 1916 On July 25, 1916, the Board of Directors adopted the following minute and directed that it be entered upon the records of the Board & published in the Bulleti

    Jan 9, 1916

  • DFI
    Session IV - Notable International Projects - Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:

    By Wolfgang G. Brunner

    The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine

    Jan 1, 2000

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • SME
    Design And Start Up Of The Cortez Gold Mines Pipeline Mill

    By R. N. Powell

    The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the

    Jan 1, 1999

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • DFI
    Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction

    By Michael W. Neill, O&apos

    The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec

    Jan 1, 1989

  • IOM3
    Large deformation analysis for rock excavations - a numerical study

    By J. A. Hudson, X. D. Pan

    A rock mass responds to excavation according to the properties of the intact rock, the network of contained discontinuities and the susceptibility of the rock mass to weathering. Large deformation oft

    Sep 1, 1991