Search Documents

  • CIM
    Regional Structure of the Thompson-Moak Lake Nickel Belt

    By H. D. B. Wilson, W C. Brisbin

    The Thompson-Moak Lake nickel belt lies along the root of a Precambrian mountain range of the island-arc or alpine type. This range coin-. cides with the boundary between the Superior and Churchill bl

    Jan 1, 1961

  • SME
    Kinetic And Equilibrium Effects In Gold Ore Cyanidation

    By M. I. Brittan

    Cyanide leaching of two West African gold ores was studied in multiple laboratories to provide process-engineering data for plant design purposes. Unusually slow leach extraction kinetics were observe

    Jan 1, 2008

  • AUSIMM
    Geology and Extraction of the Northland Halloysite Deposits

    New Zealand China Clays produces a unique halloysite clay product at Matauri Bay, Northland.   The company has licences over four deposits that were derived from the weathering of rhyodacite dome

    Jan 1, 1997

  • ISEE
    Blasting Topologies for Electronic Initiation Systems

    By D. Lansburg

    Electronic detonators are increasingly being used in today’s blasting in quarries, seismic, surface and underground mines. Electronic detonators offer several distinctive features over electric and no

    Jan 1, 2011

  • NIOSH
    IC 8666 Proceedings Of The Symposium On The Use Of Diesel-Powered Equipment In Underground Mining, Pittsburgh, Pa., January 30-31, 1973 ? Introduction

    A symposium was held on January 30 and 31, 1973, at Pittsburgh, Pa., to review the state-of-the-art in designing and utilizing diesel-powered equipment in underground mining. The Health and Safety Act

    Jan 1, 1975

  • SAIMM
    The Performance Of Brunswick Mine?s Rockburst Support System During A Severe Seismic Episode

    By B. Simser

    At Brunswick Mine, an increase in the number of seismically-related falls of ground and in particular rockbursts occurred during 1999. This was due to the ever-increasing stress levels in the remaini

    Jan 1, 2002

  • AUSIMM
    Measurement of Blast Vibrations: Compliance under the RMA

    With the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra

    Jan 1, 1996

  • CIM
    The Ausmelt Continuous Copper Converting (C3) Process

    By R. Matusewicz

    The key drivers for the copper smelting industry are a complex mix of economic and "human" factors which combine to drive technology in new directions and can provide a strong indication of future ind

    Jan 1, 2007

  • AUSIMM
    The Development of Processes for the Treatment of Crude Ore, Accumulated Dumps of Tailing and Slime at Broken Hill, New South Wales

    The following paper on the development of processes for the treatment of crude ore, accumulated dumps of tailing and slime at Broken Hill, has been prepared by a committee of the Broken Hill Branch of

    Jan 1, 1930

  • AUSIMM
    Recovery of Metal Values from Complex Sulphide Concentrates of Copper, Lead and Zinc through Aqueous Chlorination

    By Paramguru R. K, Jena P. K

    Increasing demand for copper, lead and zinc with continuous depletion of good grade ore reserves, warrants the need for utilization of lean and complex ores of these metals. There is worldwide effort

    Jan 1, 1981

  • SME
    Transfer Function Model Of Phosphate Heap Leaching

    By M. Weatherspoon, S. Gebo, K. Prisbrey

    Our objective was to develop a transfer function model of phosphate heap leaching for design, optimization and control. The procedure included analysis of time-lapse photography of a laboratory heap.

    Jan 1, 2001

  • SME
    New Tunneling Innovations Revolve Around More Efficient Disc Cutters

    By Desiree Willis

    Disc cutters have determined excavation rates of rock tunneling projects for more than 50 years. First developed in 1956 by James S. Robbins, disc cutters (then 279 mm or 11 in. in diameter) were use

    Jan 1, 2007

  • CIM
    Accurassay Laboratories: State-of-the-Art Automation of the TSMC Iron Ore Lab

    By Brad McBain

    Agenda ? Accurassay Laboratories and Automation ? History and experience ? Features and benefits of automation in the lab ? Tata Steel Minerals Canada (TSMC) Iron Ore Laboratory ? State-of-the a

    Aug 1, 2013

  • CIM
    State of Leadership in the Mining Industry and Why Leadership Matters

    By Scott Martin

    This paper will discuss the challenges currently facing the mining industry. By sharing experiences gained in the CIM Leading in Mining Course, I will highlight what’s working, what’s not, what are th

    Jan 1, 2014

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • NIOSH
    OFR-130(3)-85 High Reliability Miner Hydraulic System - Volume II -Mining Hydraulics Manual ? 1. Introduction ? 1.1 General

    Hydraulic fluid power systems are advantageous whenever power output must be accurately and safely controlled. The load movers, cylinders, jacks, rotary actuators and hydraulic actuators in these syst

    Jan 1, 1982

  • AUSIMM
    Biogeochemical Prospecting for Zinc and Lead in the Te Aroha Region of New Zealand

    The uptake of zinc, lead, and copper by the flora of the Tui Base Mine area near Te Aroha is described.Vegetation and soil samples were taken from two traverses across the Raukaka Lode. Results. after

    Jan 1, 1969

  • SAIMM
    Practical steps to Global Industry Standard on Tailings Management (GISTM) compliance for operational tailings storage facilities in South Africa

    By S. D. Dladla, S. Ramsamy

    The majority of the tailings dam operations in South Africa will be required to comply with the new Global Industry Standard on Tailings Management (GISTM) within the next one to three years, dependin

    Jun 2, 2022

  • SME
    New Discoveries at the Red Dog Zinc-Lead Deposit

    By S. Jennings

    The Red Dog zinc-lead-silver deposit is located in the DeLong Mountains of the western Brooks Range in northwest Alaska. The region is located 145 km(90 miles) north of the village of Kotzebue (Fig.

    Jan 1, 1999

  • DFI
    The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment

    By James E. Parkes

    The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station

    Jan 1, 2011