Search Documents

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Alaska Way visit highlights Megaprojects conference in Seattle

    When defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,

    Dec 1, 2013

  • AIME
    Beneficiation and Utilization - Principles of Fuel Beds

    By P. Nicholls

    Though the burning of fuels extends far back into antiquity, and though fuel beds are the most common and widely distributed example of chemical actions and engineering practice, there has been little

    Jan 1, 1936

  • AIME
    Beneficiation and Utilization - Principles of Fuel Beds

    By P. Nicholls

    Though the burning of fuels extends far back into antiquity, and though fuel beds are the most common and widely distributed example of chemical actions and engineering practice, there has been little

    Jan 1, 1936

  • SME
    New Projects Highlight Minnesota?s Mining Industry

    global mining boom and in-creased demand for iron ore has lead to a resurgence in the mining industry in Minnesota. At the combined 81st Annual Minnesota Section of SME Meeting and 69th Annual Univers

    Jan 1, 2008

  • ISEE
    Wipfrag and Wipjoint - To Measure, Record and Predict Blast Results

    By John A. Franklin, Tom C. Palangio, Norbert H. Maerz

    WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the

    Jan 1, 1997

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • AIME
    Mining - Ground Movement and Subsidence from Block Caving at Miami Mine

    By J. B. Fletcher

    The Miami mine first started operations in 1910. For convenience, the history of the orebody can be divided into the following categories (Fig. 1): 1) 1910 to 1925: 24.4 million tons of high grade

    Jan 1, 1961

  • CIM
    Chapter 10. Definitions

    By Karl J. C. Harries

    "10.1. INTRODUCTIONDefinitions are a necessary part of every agreement. Their purposes are to assist the reader in reading and understanding an agreement and to attempt to avert potential confusion an

    Jan 1, 2003

  • NIOSH
    Numerical Modeling Of The U1A Complex At The Nevada Test Site: Model Development And Comparison Of Different Drift Mining Options

    By R. Karl Zipf, Francois E. Heuze

    Stress analysis programs such as MULSIM/NL, LAMODEL, MinSim 2000, and EXAMINETAB are used in the mining industry to analyze stresses and displacements in coal mines, platinum mines, gold reefs, and ta

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • SME
    New Developments In The Recovery Of Copper, Cobalt, Zinc And Manganese In The Boleo Process

    Baja Mining is currently constructing the Boleo metallurgical plant in Santa Rosalia, Mexico to recover copper, cobalt, zinc and possibly manganese products from the Boleo ore. The process involves a

    Jan 1, 2012

  • AUSIMM
    Some Notes on Bank Deposits, With special reference to those met with at the Denny Dalton Goldfields, Vryheid District, South African Republic, and the Process of Treatment Employed There

    To many Australian Mining Engineers, we take it, the singular features of banket deposits are not as familiarly known as they would wish, possibly because in the majority of instances they are not in

  • AUSIMM
    Geotechnical Factors Affecting Coal Recovery in the Maramarua, Mokau, and Ohinewai Deposits

    By B W. Riddol1s

    The 1983 Energy Plan calls for an increase in North Island coal production from both underground and opencast sources from the 1982/1983 production of 843 000 tpa to approximately 3.4 Mtpa within the

    Jan 1, 1984

  • AUSIMM
    The Sulphating Roasting of Copper Sulphide Concentrates

    It is shown that factors associated with conditions whIch are thermodynamically favourable for the formation of CuS04 in roasting lead to high copper recoveries on leaching. One of these factors is th

    Jan 1, 1968

  • AUSIMM
    New online/atline splitter designs for laboratory automation – feasibility results

    By A Hollweg, K H. Esbensen, M Lischka

    Two new splitter designs for intercepting moving streams of matter are presented, the variable cross-stream splitter (vCSS) and the rotary stream splitter (RSS), which are intended for implementation

    May 9, 2017

  • SME
    Canadian Companies Make Their Pitch At PDAC

    At the Prospectors and Developers Annual Convention (PDAC) in Toronto, Canada mining and exploration companies of all sizes were on hand to discuss the year that was and those that will be. The follow

    Jan 1, 2009

  • AUSIMM
    Magnesia from magnesite by calcination/carbonic acid leaching: Effect of magnesite/dolomite ratio

    By Moorrees C, Koh P. T, Tsambourakis G

    Calcination of samples from the Savage River region of Thsmania containing varying magnesite/dolomite ratios under conditions optimized for the magnesite component, followed by carbonic acid leaching

    Jan 1, 1987

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin