Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • AUSIMM
    Pioneering Community Collaboration in Mineral Exploration Southern Flinders Ranges

    By I B. Miller

    Magnesium International Limited (MIL) has broken new ground in their desire to integrate their mineral development activities in the Southern Flinders Ranges of South Australia in to the communities o

    Jan 1, 2004

  • AUSIMM
    Transport in Drifts and Shafts

    From depths of 400 - 600 m, coal is transported by a conveyor in a drift or a bulk winder in a shaft, whilst men and/or materials are transported by a slope hauler or a cage winder. Assessment of t

    Jan 1, 1976

  • AUSIMM
    Applying supervised machine learning and multiscale analysis on drill core data to improve geological logging

    By E J. Hill, F Huang, A Otto

    Geochemical data from drill core samples is used in mineral exploration to enable geologists to understand subsurface geology. However, it is challenging to analyse these data sets rigorously and cons

    Mar 22, 2022

  • AUSIMM
    Methane Drainage in Underground Coal Mines in China

    By Boshou B

    In China, there are approximately 3,000,000 million m3 of gas (methane) included in highly gassy mines liable to coal/gas outbursts; the amount of methane pre-drainage possible is estimated at 400,

    Jan 1, 1988

  • AUSIMM
    Developments in Geosciences for Overcoming the Constraints on High Production Underground Mining

    By Hughson B

    At present sane man-made Improvements and natural features are constraints on unlimited underground mining. 7 hey will continue to remain, as constraints on the future high production mining syste

    Jan 1, 1988

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    The Significance of Sedimentary Structures in the Willyama Complex, New South Wales

    By Laing W. P

    Sedimentary structures are described from the WiIlyama Complex, New South Wales. Their presence confirms lithological layering within the metasediments as bedding. These primary structures occur not o

    Jan 1, 1975

  • AUSIMM
    Tonnes, Grade and Economics - The ZC Mine Experience 1985-1988

    From the mid-1970s ZC Mines at Broken Hill had a policy to increase ore production rates at progressively lower head grades. In the mid-1980s the mine suffered crippling losses at a time of low metal

    Jan 1, 1990

  • AUSIMM
    A Study of Results of the VLF-EM Method of Prospecting in Australia and Papua

    Since early 1968 the Bureau of Mineral Resources (B.M.R.) has carried out VLF-EM test surveys in various parts of Australia and Papua. The aim of the work, primarily, was to examine the effect- ivene

    Jan 1, 1971

  • AUSIMM
    Risk Management of a Gold Heap Leach Project

    One of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This p

    Jan 1, 1994

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    The Break Up of Recoverable Reserves at High Cut-offs

    By Armstrong M, Kleingeld W. J

    Current low prices for many metals mean that deposits have to be mined at high cut-offs (relative to their mean grade), which means that only a small percentage of mining blocks are above cut-off.

    Jan 1, 1995

  • AUSIMM
    The Ores of the Golden Mile, Kalgoorlie: Coherent Metallurgical Testwork from Comminution, through Flotation, Roasting and Leaching, to Mineralogical Determination of Key Mineral Deportments using QEM*SEM

    By J J. Campbell, G J. Wilkie

    The ores of the Golden Mile exhibit considerable complexity. As a consequence, the operating company, Kalgoorlie Consolidated Gold Mines (KCGM), considered it important to develop a coherent database

    Jan 1, 1998

  • AUSIMM
    The geology of porphyry-related mesothermal vein gold mineralisation north of Kainantu, Papua New Guinea

    By Thirnbeck M, Sione T, Petrie P, Leach TM, Mori W, Digan K, Harry K

    Gold and lesser copper mineralisation are associated with porphyry-related vein systems periph-eral to two separate inferred intrusive centres north of Kainantu, Papua New Guinea (PNG). The intersecti

    Jan 1, 1994

  • AUSIMM
    What Information and Production Benefit Can I Gain by Using Digital High-Speed Camera and Data Capture Technology?

    This paper will address this question from the point of view of a drill and blast engineer or researcher working in open cut and underground mining operations. The paper will establish a common set of

    Jan 1, 2007

  • AUSIMM
    The Use of Evaluation Surfaces to Assist in the Determination of Mine Design Criteria

    One of the problems with mining projects is the setting of the design criteria that will best match the requirements. Normally this is expressed in economic terms but can be other factors. With massiv

    Jan 1, 2000

  • AUSIMM
    Final Session

    The seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res

    Jan 1, 1973

  • AUSIMM
    Importance of Early Rehabilitation Planning - Case Studies from North West Queensland

    By M J. Gillespie, P D. Erskine

    Mine site rehabilitation generally includes the re-shaping of overburden to create a final landform, manipulation of substrates and subsequent revegetation. Due to the wide range of environmental vari

    Jul 10, 2012