Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pre-Competitive Exploration Research in Australia û A 30 Year Assessment

    By May J. R

    Exploration, including research, has fuelled the enormous expansion of the Australian mineral industry in the last three decades. Analysis of success and failure in exploration and research has the

    Jan 1, 1992

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Re-defining Compliance Planning through data integration and ultra-short-term scheduling

    By C Fong

    Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i

    Jun 22, 2022

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    A Double Drum Separator for Triboelectric Separation of Very Fine Materials

    By K Schonert, K Eichas

    Electrostatic separation of non-conductive materials can be accomplished by triboelectric charging. The efficiency of convential separators becomes worse in the size range below about 100 ¦m. These

    Jan 1, 1993

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Belt Conveyor Transport Systems

    The demands of the economy require larger manufacturing facilities using greater quantit- ies of raw materials which must be mined, handl- ed, stockpiled and recovered with efficiency and dependabili

    Jan 1, 1976

  • AUSIMM
    A thermodynamic and sustainability assessment of PCB recycling through the secondary Cu smelting process

    By A Kamaraj, M Mohanasundaram, R Kumar, P Tikare

    This study presents a comprehensive thermodynamic optimisation and sustainability analysis of the secondary copper smelting process for Waste Printed Circuit Board (WPCB) recycling. The study investig

    Aug 21, 2024

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?

    By C Pope, M Tannock

    Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m

    Jul 13, 2015

  • AUSIMM
    Groundwater Exploration for Mining Development and Groundwater regimes in the Goldfields of Western Australia

    Since gold was first discovered, mining development in the West Australian goldfields has been heavily dependent on the location of groundwater both for potable and mineral processing supplies . Th

    Jan 1, 1988

  • AUSIMM
    Managements' Changing Emphasis on Health and Safety in the 1990s

    The 1990s present many challenges, not the least of which is in the area of health and safety. Integrating of safety and health into the management process to suit the overall needs of a company will

    Jan 1, 1993

  • AUSIMM
    The Approvals Process Through to Mining Lease Grant for a Small-Medium Sized Mining Development: The Mt Sinvit Gold Projects, East New Britain Province

    The Mt Sinivit gold project is located approximately 50km SSW of Rabaul in the Baining Mountains of the Gazelle Peninsula, East New Britain Province. The deposits were discovered in mid- 1983 and fo

    Jan 1, 1997

  • AUSIMM
    Open Stoping with Associated Caving at Mount Lyell

    Underground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce

    Jan 1, 1982

  • AUSIMM
    A Study of the Potential for Surface and Ground Water Contamination by Arsenic at the Sunbeam Gold Mine

    By Pyrih R, House A, Shangraw J, Silva AJ

    Sunbeam Mining -Corporation has the inten mine with heap leach gold recovery, near spent ore indicated a relatively high ar topographical configuration, the spent across a small drainage and a lak

    Jan 1, 1988

  • AUSIMM
    The Development of Acoustic Emission and Microseismic Monitoring Techniques in China

    By Wu Y, Qu Q

    The Central Coal Mining Research Institute has developed the MAE acoustic emission monitoring system, the BD4-1 portable acoustic emission monitor and the MRB rock burst monitoring system. In the MAE

    Jan 1, 1991

  • AUSIMM
    Risk Assessment of Historical Mine Waste Using Chemical Analysis and Ocular Mineral/Rock Classification û A Comparison

    By S SSdbom

    A comparison was made between chemical analysis and ocular mineral/rock classification in health-based risk assessment of historical mine waste produced between 1625 and 1975. Large parts of the mine

    Jan 1, 2008

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • AUSIMM
    GPSS Computer Simulation of the Coal Bunker System at a Proposed Power Station

    By Sturgul J. R

    A major electricity generating authority have a proposal to construct a Power Station. An understanding of the operation of the bunker system is of importance to the designers and a computer simulat

    Jan 1, 1988

  • AUSIMM
    In-Pit Tailings – World’s Best Practice for Long-Term Management of Tailings

    By G M. Mudd

    Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili

    Aug 8, 2011