Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Challenges and Opportunities in the Development of a Cultural Heritage Management Strategy at the Lihir Gold Mine, Papua New Guinea

    By J Cook

    In this paper we present a case study of the challenges and opportunities associated with the development of cultural heritage management strategies at the Lihir gold mine in Papua New Guinea. We disc

    Jan 1, 2009

  • AUSIMM
    Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron Project

    By G J. Showers, P Botman, A G. Hunt

    Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo

    Jul 13, 2015

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Extractive Industry - Sustainability Information Systems

    As the title indicates the central themes discussed in this contribution are sustainable development, information systems, and extractive industry. More specifically, the objective is to present a pro

    Jan 1, 2009

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    Pyrrhotite - The Matrix of Nickel Sulphide Mineralization

    The economic significance of a fundamental understanding of the mineral pyrrhotite is dis- cussed. Particular emphasis is placed on the relationship of other sulphide minerals to the pyrrhotite whe

    Jan 1, 1972

  • AUSIMM
    An Integrated Technology Solution for Optimised and Environmentally-controlled Blasts

    By C Parihar, R Garg, A Bhandari, S Bhandari

    Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for

    Aug 24, 2015

  • AUSIMM
    From Banded Iron Formation to Iron Ore – Genetic Models and Their Application in Iron Ore Exploration in the Hamersley Province, Western Australia

    By H J. Dalstra

    High-grade iron ore may be derived from banded iron formation (BIF) through four fundamentally different processes:1. syngenetic precipitation of chert free BIF,2. residual enrichment by removal of ga

    Jul 11, 2011

  • AUSIMM
    Applications of Ceramic Wear Materials in the Gold Industry

    By R Stead

    So many ceramics look the same, but are they?In the past 20 years, there have been significant changes in the materials available, as well as changes to the supply chain, for ceramics used in wear app

    Sep 26, 2013

  • AUSIMM
    Chemical and Physical Variables Affecting Iron Ore Pellet Properties

    By Carter NB

    A statistically-designed experimental program has been used to study compositional and processing variables which influence the development of strength and reducibility of iron ore pellets. The eff

    Jan 1, 1980

  • AUSIMM
    The Production of Nuclear Grade Uranium Dioxide Powders from Australian Ores

    Most types of nuclear power reactors use uranium dioxide fuel. Power reactors using natural uranium dioxide'fuel are of special interest to countries such as Australia that have their own uran

    Jan 1, 1969

  • AUSIMM
    Potential and limitations for sensor-based particle sorting of gold ores – experiences on sensor-based particle sorting piloted for SAG pebbles

    By A Kobzev, C Robben

    Sensor-based particle sorting of gold ores is the masterclass of preconcentration. The technical challenges of a grade in ppm scale makes a direct detection with currently available technology in mill

    Nov 10, 2020

  • AUSIMM
    Achieving Better Mine Closure Outcomes for Less Money

    By B Howard, M Jones, D Pershke

    "Current closure objectives and criteria are often difficult to achieve and are not delivering value for money outcomes at closure. Current mine closure processes tend to focus on rehabilitation and r

    Jul 16, 2014

  • AUSIMM
    Recovery of Iron Ore Fines and Ultrafines from Tailings by Using Wet High-intensity Magnetic Separation – JONES WHIMS

    By M Gerards, M Steinberg, T Graham

    The quality and quantity of Australia’s secondary deposits, which include tailings streams and tailings dams, are higher than most countries’ primary deposits. In addition, these secondary deposits ha

    Jul 13, 2015

  • AUSIMM
    Legacy tailings dam closure with a bituminous geomembrane cover

    By M Medina, J Alexander, R J. Longey

    Capricorn Copper Pty Ltd (CCPL) are operating the Capricorn Copper Mine located at Gunpowder, Queensland. As current holder of the environmental authority for the site, CCPL have obligations to rehabi

    Jul 1, 2021

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    Developments in Sublevel Open Stoping at Rosebery Mine

    Sublevel open stoping (S.L.O.S.) was introduced at Rosebery in 1972 in the wider ore blocks below 14 level, largely replacing cut and fill methods which had been in use up till that time. During 19

    Jan 1, 1982

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Effective Life-of-mine Planning by Understanding and Managing Risks and Opportunities Associated with Geological Uncertainty

    By M Berry

    Consider these four questions:What is the definition of life-of-mine?When should life-of-mine planning seriously commence?When can life-of-mine planning seriously commence?What is the key input to eff

    Jul 16, 2014

  • AUSIMM
    Drainage Research at Mount Isa Mines Limited 1992 - 1997

    By Chend J

    Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled scopes has been the primary cause of bulkhead failures and emphasis is placed on r

    Jan 1, 1998