Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mine

    By A Nugraha, H Thanasekaran, K Tatetdagat

    The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa

    Aug 29, 2018

  • AUSIMM
    Occupational Diseases in China, with the Emphasis on Its Occurrence in Chinese Mine Workers

    By Y Cao, J C. Tien

    Occupational health and safety is essential in modern mining workplaces and in China it is often not given enough emphasis due to a lack of knowledge and/or appreciation. Although many health and safe

    Aug 31, 2015

  • AUSIMM
    Pisolitic Limonite Deposits in Northwest Australia

    By Morgan B. D

    Since the mid 1950s, limonite deposits of a new type have been found in the northwest of Western Australia. The deposits consist of extensive fossil valley fillings up to several hundred feet in depth

    Jan 1, 1964

  • AUSIMM
    Construction Costs

    By Cerutty L

    To those who have been engaged in the construction of mining and metallurgical plants during the war and post-war periods, it is quite unnecessary to point out the large increases and violent fluctuat

    Jan 1, 1922

  • AUSIMM
    Better Prediction of Performance of a Slope Using Time-series Monitoring Data at Multiple Points in a Multistep Excavation

    By L M. Zhang, X Y. Li

    Surface displacements are routinely monitored at multiple points during slope excavation. The monitoring data reveals the safety status of the slope under current loading conditions. They can be used

    Nov 5, 2014

  • AUSIMM
    Maritime Bulk Cargo Transportable Moisture Limit Requirements for Iron Ore Shipments

    By K Williams, M Pender, T Honeyands, T Krull, D McCallum, R Holmes, R Orense

    Bulk cargoes, including iron ore fines, must be shipped according to the rules agreed by the member states of the International Maritime Organization (IMO). One critical safety measure is the transpor

    Jul 13, 2015

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    Techno-Economic Evaluation of a New Early Removal Process to Treat High-Arsenic Copper Ores

    Techno-Economic Evaluation of a New Early Removal Process to Treat High-Arsenic Copper Ores

    Sep 13, 2010

  • AUSIMM
    Presentation of the Institute Medal, 1981, to Charles Wooller Marshall, A. O.

    Address by the President (Mr B T Loton) in presenting the Institute medal for 1981 to Charles Wooller Marshall AO. Address by Charles Wooller Marshall AO after accepting the medal.

    Jan 1, 1982

  • AUSIMM
    Excavation of the Gjovik Olympic Mountain Hall - The World's Largest Rock Cavern for Public Use

    The Gj0vik Olympic Mountain Hall is the world's largest underground cavern for public use and was created primarily to facilitate the ice hockey tournaments for the 1994 winter Olympics in Norw

    Jan 1, 1995

  • AUSIMM
    Postgraduate Education for Mining Company Management

    This paper looks at the development in management education for engineers at the undergraduate level with particular reference to mining engineers. The management core content of the engineering d

    Jan 1, 1986

  • AUSIMM
    Management Education for Mining Engineering Undergraduates

    This paper looks at the development in management education for engineers at the undergraduate level with particular reference to mining engineers. The management core content of the engineering d

    Jan 1, 1986

  • AUSIMM
    Process Control Developments at Isa Mine Mount Isa

    By Wickham P

    Digital computer based control systems are used to implement control and monitoring over most unit operations in Mount Isa Mines Limited lead-zinc concentrator and copper concentrator. Implementati

    Jan 1, 1978

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    Metallurgical Test Work for Process Development - A Case Study

    The Prospero orebody is a part of the Helene mine at Cosmos and was scheduled to begin production in March 2008 after the exhaustion of the Tapinos orebody in the same mine. Treatment of the Tapinos o

    Jan 1, 2009

  • AUSIMM
    Productivity Enhancement Driver Assistance for Mining Machinery Based on Unique Two-Dimensional Radar Sensor Fusion Concept

    By C Augustin, M Hahn, K Nienhaus

    Operators of mining machinery like haul trucks or excavators have very limited information about the exact distance to other equipment as well as to the natural boundaries like berms, walls and struct

    Sep 26, 2011

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011