Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Road Infrastructure Security Assessment and Measures Selection Methodology Using SecMan – Tunnel Example

    By J Karlovšek, M Hafner, M Žibert

    The transport network in Europe is probably one of the most important systems for the European economy and society. Trans-national transport routes play a vital role in the traffic of goods and the su

    Sep 17, 2014

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Megathrusts, Megavalving and Mineralisation – Perturbation of Hydrothermal and Magmatic Flow Systems by Subduction Thrust Ruptures

    By R H. Sibson

    Magmatic and/or hydrothermal fluid systems in island or mountain arcs self-organise to critical states subject to perturbation by changes in the regional stress, which plays a controlling role in the

    Aug 22, 2011

  • AUSIMM
    Dilution Control in Southern African Mines

    The economic viability of many Southern African massive mining operations is threatened by excessive dilution. In many operations currently in progress, some stopes are experiencing as much as 115 per

    Jan 1, 2000

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Past Achievements and Future Challenges in the Underground Coal Sector

    By B Robertson

    Over the 40 years that the author has been engaged in the Australian underground coal mining industry, there has been a continuous improvement in safety performance as the sector has grown in size and

    Jul 1, 2013

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    Real-time fluorine mineral sensor – taking research to prototype

    By J Moffatt, T Payten, N Spooner, L Teixeira, L A. Balzan, G Wilkie, G Tsiminis

    Fluorine is a penalty element due to its reactive nature. In acidic environments many fluorine minerals dissolve to form hydrofluoric acid (HF), changing processing conditions. When smelted HF can be

    Aug 24, 2022

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021

  • AUSIMM
    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    Sep 13, 2010

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    A Preliminary Investigation into Electro-Strengthening of Tailings for Surface and Underground Disposal

    By Chappell B

    Backfill in the form of mine waste tailings has inherent problems associated with attaining adequate strengths upon placement. Fines are usually removed to ensure adequate drainage, which lowers the

    Jan 1, 1998

  • AUSIMM
    Dashboards, data sources and a modern data platform

    By D Bruce

    OZ Minerals’ Carrapateena mine is a Sublevel cave mine located in South Australia, approximately 160 km north of the regional centre of Port Augusta. Carrapateena commenced underground development in

    Mar 29, 2023

  • AUSIMM
    The MOLTEN Conference series and research trends in slags, fluxes and salts 1980–2023

    By P Hayes, D Fadhlurrahman

    Molten slags, fluxes and salts play key roles in a wide range of the high temperature industrial process applications, including metals production, refining and recycling, metal manufacturing processe

    Jun 19, 2024

  • AUSIMM
    The Geology of the Browns Creek Gold-Copper Skarn Deposit, Blayney, NSW

    By Wilkins C

    The Browns Creek deposit is located 8 kin west of Blayney and 220 km west of Sydney (Figure 1), at lat 33¦32'S, long 149¦10'E on the Bathurst (SI 55-8) 1:250 000 scale map sheet. The total

    Jan 1, 1997

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-Extraction in the South Deep Section, Western Areas Gold Mine (277410f0-6562-47cc-84ec-f0b4e2938751)

    By James JV, Petho SZ

    The South Deep surface shaft system is being sunk to a final depth of 2750 in below surface and on completion will be the deepest single drop haft in the world. The shafts will intersect the target

    Jan 1, 1998

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Advanced Grinding Mill Relining Methods

    RME has a vision for a new mill operational paradigm made possible by RMEÆs fast, safe Mill Relining System. This vision can be moved forward into reality at any time with or without guidance from rec

    Jan 1, 2006

  • AUSIMM
    Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow Tests

    Traditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel

    Jul 1, 2013