Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • CIM
    Suitability of PEM Fuelcells for Underground Mining Vehicles

    By Marc C. Bétournay

    Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a

    May 1, 2003

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • CIM
    Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite Flotation

    By R. Jackman, D. Koningen, G. Wilcox

    "Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm

    Jan 1, 2012

  • CIM
    Nitrogen-Based Collectors for Sulfide Flotation – Tecflote™

    By A. Lewis, J. Zachwieja, M. Widell, P. Zhou, W. W. Geissler, M. Svensson, A. Movahedi, H. Nordberg

    Flotation collectors for sulfide minerals has been traditionally based on xanthate, thiophosphate, thiophosphinate and thiocarbamate, all derived from sulfur chemistry. Tecflote™ is a new family of pa

    Jan 1, 2019

  • CIM
    X-ray barium sulphate for North America

    By J. D. Nye, I. A. Farr, W. J. D. Stone

    "A unique deposit of barite exists near Brookfield, Nova Scotia. The crystals are extremely fine and the whole deposit virtually free of heavy metals. The deposit size was not large enough for convent

    Jan 1, 1980

  • CIM
    The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft

    In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla

    Apr 1, 2005

  • CIM
    Synergie Production ? Maintenance par le soins des équipements (SDE)

    By Yves-Laurent Turcotte

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • CIM
    The coarse particle recovery process

    By G. S. Hill, B. J. Huls

    This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate ana

    Jan 1, 2006

  • CIM
    Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure

    Jan 1, 1985

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009

  • CIM
    Understanding the Relationship: Bitumen Production and the Athabasca River

    Overview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P

    May 1, 2009

  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • CIM
    Flotation Kinetic Studies -Going from Laboratory to the Plant

    By Richard Klimpel

    "Over the last 15 years, there has been a number of plant scale sulfide mineral flotation tests organized by this author specifically aimed at understanding how flotation rate varies with reagent type

    Jan 1, 1997

  • CIM
    Gold Deposits of the Matachewan Area, Ontario

    By W. D. Sinclair

    "Between 1934 and 1956, nearly 31 million grams of gold were produced in the Matachewan area from deposits on properties belonging to Young-Davidson Mines Limited and Matachewan Consolidated Mines Lim

    Jan 1, 1982