Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mining of the Ming Orebody by the Consolidated Rambler Mines Limited

    By H. Sahay

    This paper summarizes the history and ore-grade statistics of mining the Ming orebody, and then details the mining methods. Included are raising, stoping, drilling and blasting techniques. Particular

    Jan 1, 1979

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Pebble Grinding At Bethlehem Copper Corporation

    By E. A. Lowe, J. W. Smith, C. W. Overton

    "The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through

    Jan 1, 1975

  • CIM
    Factors Affecting the Dissolution of Gold from Refractory Flotation Tailings

    By H. U. Ross

    "INTRODUCTION Extensive studies have been carried on pure gold to determine the various factors that affect its dissolution in alkaline cyanide solutions. With the extension of milling to refractory o

    Jan 1, 1973

  • CIM
    The Derrick Stack Sizer™: Revolutionary Advancements in Wet Screening Technology

    By Benjamin H. Clark

    "For over 50 years, Derrick Corporation has been renowned for its innovative and durable fine screening equipment and screen surface technology. Derrick’s latest innovation, the patented Stack Sizer,

    Jan 1, 2007

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Summary Of The EU Voluntary Copper Risk Assessment

    By K. Delbeke

    Within the framework of the EU Existing Substance (93/793/EEC) and REACH regulations EC/1907/2006), the copper industry initiated in 2000 a comprehensive Voluntary Risk Assessment of copper and severa

    Jan 1, 2007

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • CIM
    Forecasting copper prices in the short and medium terms using geostatistics (85ec8f44-0e97-49ec-a0bf-7fb69134cd4d)

    By A. Cabañas

    "In this paper, geostatistical techniques are applied to forecast the annual copper price in the short and medium terms (from one to five years ahead). These techniques allow the incorporation of mont

    Jan 1, 2004

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • CIM
    Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the World

    By Gunnar Nord

    Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti

    May 1, 2009

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    Leadership in Maintenance Best Practices - The Mining Experience

    Leadership "Organizing a group of people to achieve a common goal" Paradigms ? Rush to produce or cut costs. ? The most important thing after safety is production. ? We?ll take care of ??this?? o

    Aug 1, 2013

  • CIM
    Enhanced Oxygen Transfer in Gold Cyanidation

    By Ralph Harris, Xia Qi, Frank Komsic

    "Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r

    Jan 1, 1996

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    The Pebble Copper-Gold-Molybdenum Porphyry, Alaska

    By John G. Payne

    The Pebble deposit contains three contiguous zones. In the Pebble West zone, granodiorite stocks intrude gently warped volcanosedimentary rocks that had been intruded by diorite sills and two felsic i

    May 1, 2006

  • CIM
    Sustainable standards for the mining and metallurgical industry of the 21st century

    By D. J. Kemp

    The 20th century saw changes in the mining and metallurgical industry not only technically but also in social and environmental expectations. As projects continue to become larger their visibility rai

    Jan 1, 2005

  • CIM
    A new approach to waste dump site selection according to the fuzzy decision-making process

    By F. Samimi Namin

    During the process of developing surface or underground mines, some sites are considered for dumping of surface soils, while others are applied to reclaiming surface and waste disposal. For each kind

    Jan 1, 2007

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999