Unified Specifications for Soil-Mixed Seepage Cutoff WallsBy Wayne S. Smith, Erik James, Jose R. Gomez
"Soil mixed seepage cutoff walls are increasingly being used in levee and dam modification projects nationwide. An important aspect of their overall quality depends greatly on the language included in
Jan 1, 2016
-
Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Analysis of Pile Interaction under Lateral Cyclic Load in Cohesiooless SoilBy Sudip Basack
"The topic of pile foundation subjected to lateral cyclic load is an age-old problem confronted by Geotechnical Engineers. The environment prevalent in ocean and shorelines necessitates the piles supp
Jan 1, 2005
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Effects Of Self-Weight On Thermomechanical Response Of Energy PilesBy Arash Saeidi Rashk Olia, Dunja Perić
The increasing demand for renewable energy has attracted attention to energy geostructures as means of extracting clean geothermal energy from the ground. To further advance the understanding of soils
Oct 1, 2022
-
Comparison of Drilled Shaft Structural Response from Strain Gage and Shape Accel Array (SAA) DataBy J. Erik Loehr, Minh Uong, Andrew Z. Boeckmann, Sarah G. Myers
"The University of Missouri performed a lateral load test program involving 32 drilled shaft load tests for the Missouri Department of Transportation (MoDOT). Tests were performed at two MoDOT geotech
Jan 1, 2017
-
Alternative Deep Foundation Solutions – DMM at LPV-111 in New OrleansBy Peter Cali, Wesley Schmutzler
"The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
Jan 1, 2017
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore FoundationsBy Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck
Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo
Nov 1, 2022
-
30 Hudson Street Foundation Design and Construction in Variable RockBy Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
Piled-Raft Foundations in BelarusBy V. A. Sernov
"One of the ways to increase the bearing capacity of a piled foundation is to take into account soil resistance in the base of the raft. Piled raft is similar to shallow foundation and can transfer si
Jan 1, 2016
-
New Insights On Detecting Flaws With Csl And TipBy Andrew Z. Boeckelmann, David S. Graham, Paul J. Axtell
In the last fifteen years, several research studies have evaluated the ability to detect various types of deep foundation concrete integrity flaws with crosshole sonic logging (CSL) and thermal integr
Oct 1, 2022
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Piled Rafts: Are We Modelling Them Correctly?By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In KolkataBy Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin
This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1
Sep 1, 2022
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?By John L. White
The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi
Jan 1, 1990
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - SynopsisBy F Debidin
The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu
Jan 1, 2010
-
An Alternative Approach for Estimating the Vertical Capacity of L-Shaped Segmental Underpinning Systems in Urban Basement ConstructionBy Abid O. Adekunte, David Greentree, David Hilton
"The construction industry is witnessing an upsurge in demand by property developers to have basements incorporated into their residential and commercial development schemes. This is attributable to p
Jan 1, 2016