Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - SynopsisBy J. W. Slatter
Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati
Jan 1, 2000
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Using Large Pile Driving Hammers For The Foundation Of Bridges And WindparksBy Bernhard Bruggaier
Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u
Jan 1, 2002
-
Determination Of Hydraulic Conductivity Of The Coralline Limestone Aquifer Of Jeddah, Saudi Arabia: Precautions And Recommendations For Deep FoundationsBy Mohamed A. Eliwah
This paper deals with the determination of hydraulic conductivity of the coastal coralline limestone aquifer of Jeddah, Saudi Arabia. This coastal area has witnessed urban development and establishmen
-
Information Technology And The Foundation IndustryBy Andreas Massarsch
Information Technology, IT, is rapidly affecting all aspects of private life and how professional activities are conducted. Probably the most important development is the Internet, which makes it poss
Jan 1, 2002
-
Difficulties In Caisson ConstructionBy Ronnie W. Sisk
1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum
Jan 1, 1988
-
Estimation Of Maximum Unit Side Resistance In Drilled Shaft Foundations From Partially Mobilized Load-displacement DataBy Ramin Motamed, Anna Panorska``, Joseph A. W. Toth
In this study, a dataset of 145 bi-directional and static load tests was used to evaluate the load-displacement response with respect to unit side resistance for drilled shafts comprising fully and pa
-
Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown MicropilesBy M. Meckkey El Sharnouby
In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und
Jan 1, 2011
-
Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved ClayBy Carl Ealy
Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m
Jan 1, 2002
-
JFKIA - Post Grouted Drilled Shafts And Driven Piles - Update - SynopsisBy Walter G. Brusey
This paper describes a comprehensive pile test program conducted at John F. Kennedy International Airport (JFKIA) to evaluate pile types and design capacities ranging from 890 to 4450 KN (100 to 500 t
Jan 1, 2000
-
Multiple Foundation Types For Bridges Over The Same Coal MineBy Kenneth M. Berrry
A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b
Jan 1, 2001
-
Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? SynopsisBy N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
Pile Construction And Related Problems ? SynopsisBy K. Fujita
In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,
Jan 1, 2010
-
Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained SoilsBy W. Morgan NeSmith
A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun
Jan 1, 2008
-
Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch BridgeBy William Auyeung
Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in
Jan 1, 2004
-
Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
Effective Plane Arrangement of Deep Mixing Piles to Resist Lateral Flow of Liquefied GroundBy Daiki Takano, Naoki Takahashi, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"The method in this study, in which cement-treated piles are installed into the ground to decrease the amount of liquefied lateral flow, has been studied. The authors are also investigating the most e
Jan 1, 2015
-
The Effects Of Heating And Cooling Energy Piles Under Working Load At Lambeth College, UKBy Tony Amis
There is very limited information relating to the potential impact of temperature cycles, outside the variation that occurs naturally, on the behaviour of foundation piles. Such thermal loading occurs
Jan 1, 2008