CPT Methods for Helical Pile DesignBy Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter
Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu
Sep 8, 2021
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Performance Monitoring of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur
There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri
Jan 1, 2019
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Foundation in Simsima Lime Stone for an Underground ReservoirBy Chandramohan P. V., Ravi Kishore
"An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d
Jan 1, 2017
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015
-
Shoring Design of Historic LA Metro StationBy Babak Mamaqani
The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi
Apr 1, 2022
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile FoundationsBy Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
Lateral Stresses On Multilevel Tieback WallsBy Liiban A. Affi
The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also
Jan 1, 2010
-
Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element ApproachesBy Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu
"Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b
Jan 1, 2016
-
Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase IiBy Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.
The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris
Nov 1, 2022
-
Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen
"District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c
Jan 1, 2015
-
An Evaluation of t-z Analysis MethodsBy Kirk Ellison, Sherif Elfass, Ramin Motamed, Kevin V. Stanton
"The determination of accurate load transfer curves are essential for estimating deep foundation loadsettlement response using t-z style analyses. While recently developed semi-empirical methods from
Jan 1, 2017
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single PierBy Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi
The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines
Jan 1, 2019
-
Staged Construction of an Interstate I69 Embankment: Coupled Hydromechanical Numerical SimulationBy Malek Smadi, Yazen A. Khasawneh
"New embankments were constructed mostly on soft clays as part of interstate I69 extension in southern Indiana. The embankments serve as bridge abutments and as part of the fill sections along the int
Jan 1, 2017
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of OahuBy Steve Davidow, Scott Tunison
As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of