    Confiner Strength and Thickness Effects on Detonation Characteristics of Emulsion Explosives

    By D. Lynn Gordon, Larry B. Weston, Michael W. Manhart, Patrick R. Bowden, Michael W. Redmond

    Study of confinement effects on detonation characteristics and subsequent fitting form development as a function of confiner strength and thickness.

    Feb 1, 2020

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Electronic Detonator and Modern Non-Electric Shocktube Detonator Accuracy

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The emergence of electronic detonators as viable products for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to tim

    Jan 1, 2011

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Dr. Calvin J. Konya, Anthony Konya

    Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all

  • ISEE
    Single Shot Drawbell Blasting with Electronic Detonators at Freeport

    By Bonifacio Degay, Mike Lovitt

    PT Freeport Indonesia is a block cave mine that now utilizes an advanced undercut method to set up the min in the Deep Ore Zone (DOZ). In this method a slice of rock (undercut) is broken such that it

    Jan 1, 2004

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Anthony Konya, Calvin J. Konya

    This paper will present this research which correlates the borehole pressure to variables such as the Young's Modulus and Tensile Strength of various rock types giving blast designers the ability to d

    Feb 1, 2020

  • ISEE
    Hemispherical Charge Comparison to Kingery Bulmash

    By David N/A Doucet, Colter N/A Angell, William N/A Joa, Kyle N/A Wagner, Catherine N/A Johnson, Marty N/A Langenderfer

    The Kingery-Bulmash (K-B) equations are a widely accepted means of predicting air-blast parameters from surface explosive detonations. The parameters predicted from these calculations include incident

    Jan 1, 2019

  • ISEE
    Testing Electronic Detonators to Increase SAG Mill Throughput at the Red Dog Mine

    By Norman Paley

    A blasting project was undertaken at the Teck Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by using electronic detonators. The Jul

    Jan 1, 2010

  • ISEE
    Destress Mass Blast in the North Regional Pillar at Brunswick Mine

    By Philemon Desrochers, Ken Qian Liu

    Following the success of the West Ore Zone distress mass blast in 2001 at Brunswick Mine, a similar approach was taken to distress the North Regional Pillar (NRP) which contained over 3 million tonnes

    Jan 1, 2004

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By Gabe McClain, Thomas Pallua, Joe Schrank, William C. Gates

    Because of restrictions on blasting in urban areas and, more importantly, the proximity of this construction to national historic landmarks, blasting operations were extensively monitored to measure a

    Feb 1, 2020

  • ISEE
    Beyond Regression: A New Wavelet-Based Approach for Airblast Overpressure Prediction

    By Al Romphf

    Managing blasting-induced air overpressure levels is a key compliance requirement for most blasting operations. Regression analysis, plotting overpressure amplitude vs cube root scaled distance, will

    Jan 26, 2026

  • ISEE
    A Long Round Test in Conventional Room and Pillar Mining

    By Thomas Barkley

    Mining tradition holds that a parallel round underground can not be any deeper than it’s smallest face dimension. ln other words, a mine using a 12’ (3.7 m) high by 24’ (7.3 m) wide room and pillar mi

    Jan 1, 2000

  • ISEE
    Shock Tube Detonator Shelf Life in Relation to Timing Accuracy

    By Joshua Hoffman, Philip Mulligan, Braden Lusk, Tristan Worsey

    Blasters rely upon detonators to achieve the designed timing sequence to move material where it needs to go, minimize vibration, or optimize fragmentation. At times detonator inventory on seldom used

    Jan 1, 2013

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo Mine

    By John Vynne

    BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys

    Jan 1, 2007

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar