Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Stability evaluation for Jinping arch dam by using bifurcation model in 3D FEM analysisBy C. Steve
ABSTRACT: In this paper, the stability evaluation and bifurcation criteria are presented for the Jinping arch dam structure. The bifurcation models in failure status of the arch dam are derived from t
Jan 1, 2003
-
Proceedings, 108th Annual General Meeting, 2005The 108th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Thursday, 11 August, 2005. Welcome
Jan 1, 2005
-
Reduction Of Chromium Oxide Containing Slags Using CaC2 InjectionBy J. Björkvall, S. Ångström, L. Kallin
In this paper results from industrial trials of CaC2 injection during stainless steel production in an electric arc furnace at Sandvik Steel is presented. The main purpose of the investigation was to
Jan 1, 2004
-
Aspects Of Time-Dependent Deformation In Hard Rock At Great DepthBy K. Drescher
Excavations in deep level hard rock mines show rheological or time-dependent deformation responses to mining-induced stresses. These are generally not as dramatic as those seen in soft rock environmen
Jan 1, 2003
-
A Real Options Application To Manage Risk Related To Intrinsic Variables Of A Mine Plan: A Case Study On Chuquicamata Underground Mine ProjectBy J. Botin
Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance
Jul 1, 2013
-
Characterizing The Mineralogical Variability Of A Chilean Copper Deposit Using Plurigaussian SimulationsBy J. Betzhold
Knowing more about an orebody makes it easier to exploit it profitably. Many orebodies are made up of different rock types, alteration zones or mineralogical ensembles: oxides versus sulphides or faci
Jan 1, 2000
-
Pushback 8 South ? A Case Study In Pit Slope ManagementBy P Knight, P A. Walker, H E. Speight
Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i
Jan 1, 2006
-
Mine Planning (d3a3d1a4-3eb5-42a0-a100-700eebbf2b48)"Chairman: Professor J. Elbrond Rapporteur: Miss V. E. MartingPapers.Aids to planning production in coal mines by F. H. Deist and M. P. RobertsCapacity calculations, investment allocation and long-ran
Jan 1, 2014
-
A stochastic simulation framework for truck and shovel selection and sizing in open pit minesBy S. Frimpong, S. R. Dindarloo
Material handling in open pit mining accounts for about 50% of production costs. The selection and deployment of efficient, safe, and economic loading and haulage systems is thus critical to the produ
Jan 1, 2015
-
Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water IntersectionBy M. F. Wells
The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w
Jan 1, 1999
-
Reliability Modelling And Performance Analyses Of An LHD System In MiningBy B. Samanta
LHD (load haul dumper) is now used as a loading machine for intermediate mechanization in underground coal mining. For survival in the intense competition in the global business environment in recent
Jan 1, 2004
-
The Development Of An Agglomerate Through The Use Of FeMn WasteBy K. P. Davey
In 1998 an initial objective was given to the author, to process valuable off grade High Carbon Ferro Manganese (FeMn) metal fines profitably. The previous attempts that had been made to re-melt these
Jan 1, 2004
-
The Road To NPV+By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
Recovery of base metals and PGMs in a DC alloy-smelting furnace - SynopsisBy R. T. Jones
Base metals and platinum group metals can be collected in metallic alloy form, via a wide variety of smelting processes. The recovery, or degree of collection, of the valuable metals is a function of
Jan 1, 2009
-
Carbothermal Solid State Reduction Of Manganese OresBy S. Ganguly, R. Kononov
Carbothermal reduction of manganese oxides and manganese ores in the solid state was studied in hydrogen, helium and argon at different temperatures, ore compositions and carbon to manganese oxide rat
Jan 1, 2007
-
Something for nothing?—An unconventional approach to extracting three-dimensional grade information from two-dimensional estimation of thin, tabular reef depositsThis paper presents an initial investigation into the viability of co-kriging the grades of multiple mining cuts in a two dimensional, thin reef scenario. Deposits with gradational mineralized zones,
Jan 1, 2003
-
Use Of Charcoal In Silicomanganese ProductionBy M. Tangstad, B. Monsen, H. Midtgaard
The increased attention towards reducing emissions of fossil CO2 due to its potential global warming effect has resulted in a focus on renewable resources, as charcoal. Since charcoal is produced from
Jan 1, 2004
-
State-Of-Art Shaft System As Applied To Palabora Underground Mining ProjectAs the world continues to face the turmoil of the economic environment, legislative prerequisites and physical conditions the intervention of technological development is vital for the continuation of
Jan 1, 2000
-
Application Of Shotcrete At Oryx MineBy D. P. Venter
When Oryx Mine down-scaled in 1994, focus was placed on development, with the primary aim being the exposure and proving of ore reserves. In order to achieve this aim, development ends had to be advan
Jan 1, 1998
-
Insight Into The Anglo Platinum Mine Optimisation ToolBy G. R. Lane, A. Vermeulen, S. van de Venter, S. Bhoowanpursadh
Over the past two years Anglo Platinum made use of the specialist skills of Cyest Corporation to develop a Mine Optimization Tool (MOT) to enhance the current suite of in house mine planning tools and
Jan 1, 2007