Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development And Large-Scale Testing Of Innovative Tunnel Support SystemsBy Robert M. Semple, Harvey W. Parker
INTRODUCTION Two promising innovative tunnel support systems are being developed by the Civil Engineering Department of the University of Illinois. One of these is a lining which can be placed by a
Jan 1, 1997
-
Survey And Experimental Studies On Engineering Control Of Machine Noises In Longwall Mining FacesBy Yi Luo, Jeremy Slagley, Arunkumar Rai, Steve Guffey, Syd S. Peng
Research was conducted to study the characteristics of longwall mining machine noises and to develop engineering controls for the reduction of noise exposure at longwall faces. Time-motion noise dosim
Jan 1, 2005
-
Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38By J. S. Peterson, G. P. Cole
The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll
Feb 24, 1997
-
Fine Coal Cleaning Using A Centrifugal Fluidized Bed SeparatorBy Mutombo Nombe, Avimanyu Das, Rick Honaker
Enhanced gravity separators (EGS) provide a more efficient separation than froth flotation when cleaning coal in the 150 x 25 µm particle size range. To improve the performance of an EGS unit, air bub
Jan 1, 2005
-
The Arizona Copper Province And The Texas LineamentBy Jacques B. Wertz
Recurring movements remotely connected with the Murray fracture zone and the San Andreas fault complex, together with the slow northwestward drift affecting the Baja California peninsula, could progre
Jan 1, 1970
-
Federal Cooperation To Protect Watersheds Degraded By Coal Mine Drainage From Abandoned Mine LandsBy B. Samoski
In late 1994, EPA and OSM acknowledged that efforts by any one agency or by the many different agencies to remedy the water quality impacts of decades of contamination from abandoned coal mine lands
Jan 1, 2002
-
Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced TunnelingBy Peter Bigwood
Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come
Jan 1, 2012
-
Monitoring Subsidence In The West: Problems And AnalysisBy John E. Rourke, O&apos
This paper describes some of the results of a project for the design and demonstration of subsidence monitoring systems for underground coal mines. The project was designed to test monitoring systems
Jan 1, 1982
-
Longwall Coal Mining Under S.M.C.R.A. 1977 The Ohio ExperienceBy Robert J. Rothwell
Underground mining of coal by longwall mining methods has not been a predominant technique in Ohio. To date, only five mines in the state utilize this method, however, the technique has sparked a cert
Jan 1, 1986
-
Probable Cost Estimating and Risk ManagementBy John Reilly
Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti
Jan 1, 2008
-
Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle HarbourBy R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves
Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse
Jan 1, 2001
-
Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam MiningIn order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars
Jul 28, 2020
-
Uetliberg Tunnel?Soft Ground Excavation And Premiere Of New Tunnelling Machine: World?s First Tunnel Bore Extender Excavated BY UndercuttingBy S. Maurhofer
The Uetliberg Tunnel in Switzerland is the longest tunnel in Zurich?s new Western Bypass Expressway, connecting the Birmensdorf bypass in the west with the existing Zurich-Chur national motorway in th
-
Lessons and implications from the onshore and offshore gas hydrate field production testsBy Se-joon Kim, Jong-hwa Chun
"‘Gas hydrate’ is the common term for a solid material formed from the combination of various gases as ‘guest’ and water as ‘host’. A series of large-scale scientific drilling and coring programmes co
Sep 1, 2014
-
Methods For Determining Roof Fall Risk In Underground Mines (e9e99c27-c4ac-4dc4-b19d-607c245139c5)By T. Bajpayee, L. Prosser, A. Iannacchione
Reducing the number of roof fall injuries is a goal of the NIOSH mine safety research program. Central to this effort is the development of assessment techniques that will help to identify the nature
Jan 1, 2007
-
Little-explored area of Argentina shows base and precious metals potentialBy Barton J. Suchomel
Introduction Despite perennial economic turbulence, Argentina continues to push ahead with efforts to develop its fledgling hardrock mining industry. The country lacks the infrastructure and mining
Jan 8, 1988
-
Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
Rehabilitation of New Croton Aqueduct ShaftsBy W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
Purification of high-grade calcite ore by flotation with alkyl diaminesBy P. Dhar, H. R. Kota, M. Thornhill
Precipitated calcium carbonate is used as a filler and coating material in the manufacturing of paper because of its high brightness and light scattering characteristics. However, beneficiated calcite
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001