Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Rockburst Prevention in the German Coal Industry

    By Rudiger Baltz

    The sudden failure of bodies of rock is a serious problem commonly experienced in the international mining industry. These explosive releases of energy are referred-to as ?bumps?, ?outbursts? and ?roc

    Jan 1, 2008

  • SME-ICGCM
    Assessment of surface fracture depth and intensity due to subsidence over the longwall panel using a sonic technique

    By A. W. Khair

    This paper presents an analysis of fracture depth and intensity due to subsidence over the longwall panel. Sonic reflection techniques were utilized to determine fracture depth, and a variation of p-w

    Jan 1, 1989

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)

    By C. Dinis da Cama

    In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat

    Jan 1, 1984

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME-ICGCM
    Coal Bumps And Odd Dynamic Phenomena - A Numerical Investigation (70cea8ce-38a7-4c88-a596-77cf801d31b0)

    By Jeffrey K. Whyatt

    The Crandall Canyon accident investigation included an interesting and unexplained observation by rescuers that the ?barrier rib had shifted northward as a unit, as much as 10 feet.? This is not the

    Jan 1, 2009

  • SME-ICGCM
    Evaluation of the Effect of Length on Strength of Slender Pillars in Limestone Mines Using Numerical Modeling

    By Dennis Dolinar

    In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a

    Jan 1, 2007

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Overburden Subsidence Characteristics When Mining in Weak Rocks and Subject to Special Mining Conditions

    By Wenquan Zhang

    Based on the mining and geological conditions of Wadong Mine, Longkou City, Shandong Province, China, a viscoelastic model with proper creep parameters was established. The 3-D ANSYS was used to simul

    Jan 1, 2006

  • SME-ICGCM
    Prediction of First Weighting Distance in Longwall Coal Mining By 3D Numerical Modeling ? A Case Study

    By Haile Manteqi

    In longwall coal mines, estimation of roof strata condition, sequence of loading, and supporting requirements are of a high degree of importance, and they are directly related to production and safety

    Jan 1, 2012

  • SME-ICGCM
    Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

    By Gennaro G. Marino

    Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this

    Jan 1, 1988

  • SME-ICGCM
    Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress report

    By Y. L. Sun

    The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the

    Jan 1, 1989

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995

  • SME-ICGCM
    Subsidence prediction using a laminated linear model

    By Miklos D. G. Salamon

    If all stratifications are horizontal, the computation of surface deformation induced by coal mining involves the prediction of roof and floor convergence and then the transfer of the effects of this

    Jan 1, 1989

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • SME-ICGCM
    Coal Pillar Design Formulae Review and Analysis

    By Xinzhi Du

    Coal strength is essential to analyze the stability of excavation in coal. It is well known that the strength of coal tested in the laboratory is size-dependent, and different size specimens will prod

    Jan 1, 2008