Evaluation of Rockburst Hazard from Core TestingBy Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
Influence Of Bolts On Discontinuities And Yielding Rock - Conceptual Developments (76baa342-4034-40cb-bc1f-e7c7c132e40f)By Buddhima Indraratna
The paper highlights the conceptual developments in rock mechanics applied to quantify the effect of bolts in the stabilization of joints and yielding soft rocks.
Jan 1, 1992
-
Stooping Low Safety Factor Pillars At Goedehoop CollieryBy Gift Makusha
The Witbank Coalfield in South Africa contains up to five economically viable coal seams. These seams have been mined continuously for over 100 years and the reserve in now becoming depleted. The norm
Jan 1, 2003
-
Some Technical Considerations When Mining Under Bodies Of WaterBy John W. Fredland
Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun
Jan 1, 1982
-
Roof Instability of Longwall Face at Ikeshima CollieryBy Kikro Matsui
Longwall mining 1s more productive in comparison to other methods but requires particular conditions for its effective use This paper relates to longwall roof instability at Ikeshima Colliery In order
Jan 1, 1997
-
The Duncan Method of Partial Pillar Extraction at Tasman MineBy Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
Pillar SizingBy Marek J. Mrugala
Coal strength based on scaled uniaxial compressive strength from the laboratory and back calculations from in-mine observations of pillar stability indicate that material strength scaling rules are op
Jan 1, 1989
-
Horizontal Stress Control In Underground Coal Mines (1dbd7295-90f8-4003-a003-9120dc19934c)By S. M. Matthews
The magnitude and orientation of the in situ stressfield has been determined as a key factor in controlling the stability of openings for both coal mine development and extraction. Monitoring of roadw
Jan 1, 1992
-
A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mineBy T. J. McMahon
This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from
Jan 1, 1989
-
Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, AustraliaBy David Hill
Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low
Jan 1, 2011
-
Prediction Of Surface Subsidence And Strain In The Appalachian Coalfields Using Numerical MethodsThis paper presents a two-dimensional numerical procedure which incorporates concepts related to the mechanics of strata deformation' as well as' empirical indices associated with subsidence
Jan 1, 1988
-
Problems in "Void" Detection in Coal Mine Water HazardsBy Francis Kendorski
One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe
Jan 1, 2004
-
Eclipse System Improves Resin Anchored Rebar BoltingBy Al Campoli
The majority of the 100 million roof bolts installed each year in the United States are 5/8 inch deformed rebar fully grouted into a one inch borehole. Commonly referred to as B-Series or No. 5 bar, t
Jan 1, 2002
-
Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining MethodsBy Bruce K. Hebblewhit
Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein
Jan 1, 2001
-
Drivage System In Retreat Longwall GateroadBy Kikuo Matsui
In a difficult economic environment, the coal mines in Japan have been making extensive efforts in order to survive by rationalizing the mining operations. Introduction of a new longwall mining system
Jan 1, 1995
-
Horizontal Stress: The Root Of All Evil?By J. Nielen van der Merwe
The effects of horizontal stress in coal mine roofs in South Africa did not receive the attention it deserved for several years, but now there is a danger that it may be over emphasized. A number of p
Jan 1, 2000
-
Floor Failure Induced By Lateral Stress Ahead Of Longwall SupportsBy J. A. Nemcik
Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein
Jan 1, 1995
-
Bolt Load Changes During Initial Face Advance And Cross-Cut BreakthroughBy Steve Signer
The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w
Jan 1, 2004
-
Surface Subsidence Due to the Combined Effects of Underground Coal Mining and Groundwater WithdrawalBy Shu Cheng
Abstract: Based on the consolidation theory of soil dewatering and land subsidence prediction methods in soil mechanics, preliminary analysis of surface subsidence and movement due to groundwater with
Jan 1, 2002
-
The Importance of Underground Stone Mine Roof GeologyBy Frank Kendorski
Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditio