Search Documents

  • SME
    Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern Pennsylvania

    By A. Iannacchione

    Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where

    Feb 27, 2013

  • SAIMM
    A Finite Element Model Of A Søderberg Electrode With An Application In Casing Design

    By W. A. Gericke, B. Olmstead, I. Mc Dougall, C. F. R. Smith

    A finite element model was generated of a Søderberg electrode in a ferromanganese smelter. In this model, the casing and fins were modelled explicitly, and temperature-dependent material properties we

    Jan 1, 2004

  • NIOSH
    RI 3500 Progress Reports - Metallurgical Division - 38. Electrometallurgical Investigations - An Electrolytic Method For The Production Of Calcium Boride ? Introduction

    By J. Koster

    Boron is an element whose metallurgical possibilities never have been investigated thoroughly, probably because of the difficulties experienced in the preparation of elemental boron and its intermetal

    Jan 1, 1940

  • AIME
    The New York Annual Meeting

    By AIME AIME

    EITHER the 2300 people who came to the Annual Meeting were in a better frame of mind or they were resigned to their fate, or it was a better meeting than usual. Whatever the reason, at the 1nstitute?s

    Jan 1, 1938

  • SME
    Wind power as an alternative post-mining land use in surface coal mines in West Virginia, U.S.

    By A. Duerksen

    "Surface coal mining in West Virginia has supplied energy to the eastern coast of the United States for over a century. Over the years, the coal mining industry has been forced to adapt as societal de

    Jan 1, 2011

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • AUSIMM
    The Post-Mining Water Balance

    By A Watson

    We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from on

    Jan 1, 2009

  • SAIMM
    Lessons For The Future: The Origins And Legacy Of COMRO?s Hydraulic Technology Programme

    By T. E. Pogue

    This paper traces the co-operative initiative undertaken by South Africa?s gold mining companies through the Chamber of Mines Research Organization (COMRO) in development of hydraulic technologies. Af

    Jan 1, 2006

  • NIOSH
    OFR-62-85 Evaluation And Demonstration Of Underhand Stoping To Control Rock Bursts

    By D. D. Bush

    Based on the results of this study, the underhand cut and fill stoping method, with mass destressing, is an effective method for controlling rock bursts and falls of ground for deep mining in the Coeu

    Jan 1, 1982

  • DFI
    A New Analysis Of Data From Statnamic Tests On Piles In Clay

    By William F. Anderson

    A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre

    Jan 1, 2006

  • NIOSH
    OFR-44-86 Research Study On Pillar Design For Vertical Crater Retreat (VCR) Mining

    By William G. Pariseau

    The research reported here concerns a four year study of the rock mechanics aspects of two underground hardrock mine study stopes. The first study was conducted at Anaconda Minerals Company's Car

    Jan 1, 1985

  • SAIMM
    Blast optimization at Kriel Colliery - Synopsis

    By A. M. Neale

    Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe

    Jan 1, 2010

  • NIOSH
    OFR-30-79 Development Of An Improved Tamper-Proof Filter Cassette

    By Gene F. ] [Faufaul

    This contract was concerned with the design, development, fabrication and testing of an improved tamper-proof filter cassette assembly for use in the, collection and evaluation of dust particulates, p

    Jan 1, 1978

  • SME
    Geologic Investigation Of The Muskeg River Mine, Ft. McMurray, Alberta

    By M. Fustic, A. H. Paul

    The geology of the Muskeg River Oil Sands Mine is described to demonstrate how geologic modeling aided in resource evaluation and material characterization during the feasibility and construction stag

    Jan 1, 2002

  • SAIMM
    A Comparative Study Of Valuation Methodologies For Mineral Developments

    By E. V. Lilford

    Valuators of mineral properties are faced with a range of valuation methodologies, the most important of which are grouped under the headings of the market approach, the cost approach and the income a

    Jan 1, 2005

  • NIOSH
    OFR-60-83 Improved Ground Control Safety In The Stone, Sand And Gravel Industries

    By Tuncel M. Yegulalp

    The objective of this study was to categorize mining operations in the stone, and sand and gravel industries into areas of similar ground control functions and define initial factors affecting operati

    Jan 1, 1981

  • CIM
    Integrating meso- and micro - textural information into mineral processing: an example from the Ernest Henry Iron-Oxide Copper-Gold deposit, Queensland, Australia

    By Maya Kamenetsky, Khoi Nguyen, Natalee Bonnici, Steve Walters, Claire McMahon, Julie Hunt, Ron Berry

    "The analysis of meso- and micro-scale textural attributes has been undertaken on ore samples from the Ernest Henry iron oxide-copper-gold (IOCG) deposit in NW QLD. Quantified textural data including

    Jan 1, 2009

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • AUSIMM
    A Mechanistic Model of Batch Grinding in Ball Mills

    A Mechanistic Model of Batch Grinding in Ball Mills

    Sep 13, 2010