Search Documents

  • SME
    NAT 2018 Full Proceedings - NAT2018

    By Matthew Preedy, Brett Campbell, Jim Rush, Alan Howard, Derek Penrice

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2018

  • SME
    Toward a Mine-Wide, Real-Time, and Autonomous Geotechnical Change Detection, Monitoring, and Prediction Framework for Underground Mines

    Adverse ground behavior events, such as convergence and falls of ground, are some of the most significant challenges and hazards in underground mines. Our goal is to work toward mine-wide, digital, an

    Jul 28, 2020

  • CIM
    Simulation Numérique Du Dma Dans La Halde Sugar Shack South De La Mine Questa, Nouveau-Mexique

    By René Lefebvre

    Numerical simulations of the physicochemical processes related to acid rock drainage (ARD) in the Sugar Shack South rock pile of the Questa Mine were performed with the TOUGH AMD simulator. The object

    Nov 1, 2002

  • ISEE
    Blasting Claims 101: An Introduction to the Defense of Claims

    By Joshua A. Bennett

    "Lawsuits where owners allege their property has been damaged by nearby blasting routinely costblasting companies, explosives engineers, and others in the field both time and money. When ownersfeel th

    Jan 1, 2016

  • AUSIMM
    Belle-Brook 2001 - A Hydrothermal Oddity?

    The Waimumu area, 12 km southwest of Gore, is underlain by the Gore Lignite Measures, an early Tertiary fluvial sequence approximately 500 m thick resting on Triassic-Jurassic argillitic basement. The

    Jan 1, 2001

  • TMS
    Thermodynamic Modeling Of Desilversing Of Lead Bullion By Zinc During Lead Refining

    By Pengfu Tan

    A thermodynamic model has been developed to model the desilverising process of lead by the addition of zinc during lead refining, whereby silver-zinc solid solutions are formed, and floats out of the

    Jan 1, 2005

  • SME
    Industrial Minerals 1986 - Barite, Bauxite and alumina

    By R. J. Anderson, A. V. Castelli

    In 1986, United States' barite production fell 48.9%, consumption - sold or used by grinding plants - was off 47.3%, and imports were down 63.8%. Meanwhile, world mine production decreased 29.6%,

    Jan 5, 1987

  • SME
    The Importance Of Water Utilization For Maximizing Grinding Circuit Classification System Efficiency - Preprint 09-067

    The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill?s grinding performance. The factors which affect cir

    Jan 1, 2009

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • DFI
    Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone Ground

    By Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu

    During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston

    Jan 1, 2018

  • NIOSH
    OFR-31-86 Conveyor Belt Dust Control

    By Vinit Mody

    The belt conveyor is one of the major pieces of equipment for transferring bulk material in mining operations. However, considerable amount of respirable dust may be generated whenever the bulk materi

    Jan 1, 1984

  • AUSIMM
    Three-Dimensional Modelling of Construction Tolerance in Trapezoidal Segments

    By R Bertuzzi

    This paper presents a three-dimensional analysis of a trapezoidal-shaped segmental tunnel lining for a recent tunnelling project in Sydney. Two- dimensional analyses, hand calculations and equipment s

    Jan 1, 2008

  • SME
    The Role of Gas Hydrate in a Global Gas Market

    By M. D. Max, A. H. Johnson

    INTRODUCTION Gas hydrates have considerable potential to be a major energy resource owing to their apparent abundance in Arctic regions and along continental margins throughout the world (Kvenvolden,

    Jan 1, 2006

  • DFI
    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • DFI
    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • SME
    A Dynamic Systems Modeling Approach To Evaluating Backfill Designs

    By M. Wickham

    Design of an open pit backfill requires an understanding of highly varied processes including slope stability, hydrogeology, pit lake chemistry, climate, runoff, and mine waste behavior. Dynamic syst

    Jan 1, 2001

  • AIME
    Papers - Nonferrous Metallurgy - Investigation of Anodes for Production of Electrolytic Zinc, II

    By H. R. Hanley

    The characteristics of alloyed anodes and their influence on the products of electrolysis and power consumption have been noted previosly ously in the literature.' This paper presents data in con

    Jan 1, 1931

  • SME
    CFD Modeling Of Air Flow In An Open Pit Mine

    By W. Collingwood

    As open pit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in open pit mines i

    Jan 1, 2011

  • SAIMM
    Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction

    By F. B. Samani, B. Stabel

    The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the

    Jan 1, 2003

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009