Search Documents

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • SME
    Modern Caverns In Gotham?Geotechnical And Design Challenges For Large Rock Caverns In Manhattan

    By Timothy P. Smirnoff

    Sustaining the region?s mobility needs, achieving projected economic growth, and maintain Midtown Manhattan as a center of regional, national and global importance has led to continued investment in c

  • AUSIMM
    Water, By-Products and the Environment

    A Good Product Range - So What! While in terms of water, waste management and environment protectrion, the Gippsland Basin may appear to have a good product range, what does this really mean? What i

    Jan 1, 1992

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Stabilization Of Organic Soil With The Limix System

    By Magnus Ruin

    The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met

    Jan 1, 2001

  • SME-ICGCM
    Field Experience Of Measuring The Acoustic Energy From A Hammer Blow To Coal Mine Roof And Its Relationship To Roof Stability

    By Peter Altounyan

    The rate of decay of the energy from a hammer blow to a coal mine roof is related to the size and nature of the contacts between the rock being struck and its surroundings The use of this principle as

    Jan 1, 2000

  • AUSIMM
    Disparate Tectonic Settings for Mineralisation in an Active Arc, Eastern Papua New Guinea and the Solomon Islands

    By C Spandler, S W. Richards G Rosenbaum, R J. Holm

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The recent and active magmatic arcs of eastern Papua New Guinea (PNG) and the Solomon Island

    Mar 18, 2015

  • CIM
    Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals

    By David G. Almond

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi

    Jan 1, 2005

  • SAIMM
    Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)

    By H. Kotzé

    Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid

    Jan 1, 2006

  • AUSIMM
    Episulphide-Based Reagent for Zinc Sulphide Flotation Without Copper Sulphate

    Results of laboratory studies on the flotation of marmatite (zinc sulphide) with new reagents, which were developed to avoid the use of copper sulphate, are presented.Episulphides were chosen as the b

    Jan 1, 1974

  • AIME
    Stability Analysis of Underground Openings Using a Coulomb Failure Criterion

    By L. A. Panek, F. D. Wang, M. C. Sun

    A method of stability analysis of underground opening by the limiting equilibrium approach is presented. The Coulomb shear failure criterion is employed to find possible fracture surfaces and to evalu

    Jan 1, 1972

  • AUSIMM
    Characterisation of Computer Printed Circuit Boards for Hazardous Properties and Beneficiation Studies

    Characterisation of Computer Printed Circuit Boards for Hazardous Properties and Beneficiation Studies

    Sep 13, 2010

  • DFI
    Predicting The End Bearing Capacity Of Rock Socketed Shafts

    By Lianyang Zhang

    For optimal design of rock socketed shafts used to support axial loading, it is important to predict the end bearing capacity. The existing empirical methods for determining the end bearing capacity o

    Jan 1, 2008

  • SME
    Haul Truck Fuel Consumption And CO2 Emission Under Various Engine Load Conditions

    By V. Kecojevic

    Environmental and economic costs related to equipment fuel consumption and carbon dioxide (CO2) emission present a substantial challenge to the mining industry. Haul trucks are an integral part of the

    Jan 1, 2011

  • AUSIMM
    A Geo-Mechanical Assessment of Thick Seam Mining Methods with Regard to Their Application to Australian Black Coals

    By C D. Rawlings

    An assessment is made of the potential for thick seam underground mining of black coal in Australia. A brief summary is given of the geo-mechanical environment and previous mining history existing in

    Jan 1, 1980

  • SAIMM
    Towards Sustainability In Ferroalloy Production ? Synopsis

    By L. Holappa

    Ferroalloy production is an energy-intensive industrial sector with significant CO2 emissions. In this paper the current situation in ferroalloy processes is discussed from the standpoint of global en

    Jan 1, 2010

  • NIOSH
    IC 8618 Overcoring Equipment And Techniques Used In Rock Stress Determination

    By Verne E. Hooker

    Stress-relief techniques and instrumentation have been developed through many years of research in the Federal Bureau of Mines and successfully used to determine the in situ state of stress in rock. T

    Jan 1, 1974

  • SME
    The History Of Aggregate Development In The Denver, Co Area - Preprint 09-044

    By W. H. Langer

    At the start of the 20th century Denver?s population was 203,795. Most streets were unpaved. Buildings were constructed of wood frame or masonry. Transport was by horse-drawn-wagon or rail. Statewide,

    Jan 1, 2009

  • CIM
    Minage des zones étroites à la Mine Bousquet

    By Paul Gauthier

    Aujourd?hui, avec un faible prix de l?or sur le marché, les opérateurs miniers doivent revoir leur façon de faire. La méthode de minage «Eureka» permet de réduire les coûts de production et d?accélére

    Oct 1, 2001

  • AUSIMM
    Recycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect Environment

    Recycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect Environment

    Sep 13, 2010