Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Light Airborne Platforms for Monitoring Mines and Minerals

    By C Cavern, G Jacobs, F Durufle, L Ameglio

    Airborne geophysics and geomatics is at a crossroads as to whether it remains a viable mapping tool, both technically and commercially, and broadens its potential for new applications (eg environmenta

    Nov 4, 2015

  • AUSIMM
    Cadia East Open Pit Project Mining Study

    The Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea

    Jan 1, 2007

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Recovery of Beryllia From Beryl

    By Lawrie D. C

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash and heating at 900°C for 4-6 hr. The sintered mater:al was then crushed and leached by boiling under reflux with 5N

    Jan 1, 1965

  • AUSIMM
    Dust Mitigation - Changing the Paradigm

    By J Visser

    Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre

    Aug 12, 2013

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • AUSIMM
    Use of drone and LiDAR technology for mapping underground voids

    By D Woolmer

    Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and

    Mar 15, 2021

  • AUSIMM
    Understanding the Effects of Liner Wear on Semi-autogenous Grinding Mill Performance

    By N Weerasekara, M Powell, P Toor

    The effect of liner wear on SAG mill performance has gained much attention in recent years. It is commonly observed that the three key performance criteria of SAG milling; throughput, power and produc

    Sep 7, 2015

  • AUSIMM
    Thermodynamic and Phase Diagram of the Lead-Lead Sulphide Binary System

    The published liquidus data on the Pb-PbS system have been correlated on the basis of one-coefficient Margules equations. Thermodynamic properties of the components of this system have been obtained,

    Jan 1, 1972

  • AUSIMM
    Optical image analysis of iron ore pellets and lumps using CSIRO software Mineral/Recognition

    By S Hapugoda, A Poliakov, E Donskoi, L Lu

    A significant amount of metallic iron in the world is produced in blast furnaces from iron ore pellets. To control the quality of pellets and to optimise pellet production, characterisation of both gr

    Jul 24, 2017

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    Continuing Education for the Australian Mining Industry Workforce

    By T O Aspinall

    The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i

    Jan 1, 1994

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • AUSIMM
    Mining History and Geology of the Alpine Reef, Lyell Goldfield

    A review of historic mining information and geological literature pertaining to the Alpine Mine, Lyell Goldfield has been completed. As a result of this work the Alpine reef is inferred to be associat

    Jan 1, 1996

  • AUSIMM
    Thermal Fragmentation - An Innovative Process for Mining Narrow High-Grade Precious Metal Veins

    The mining of high-grade narrow vein deposits is a predominant field of activity in the precious metal sector. These types of deposits are located throughout the globe and have a significant presence

    Jan 1, 2008

  • AUSIMM
    Effective Mining Project Management Systems

    By C Adams

    Reports of delays and cost blowouts in major study and construction projects are becoming increasingly prevalent in the resources industry. This is mainly being attributed to an escalating cost enviro

    Jan 1, 2006

  • AUSIMM
    Aeration induced moisture reduction of iron ore

    By J Guo, K Williams, S Caldwell, W Chen

    Mining is increasingly occurring near or below the water table. This has led to a higher rate of handling problems associated with increased moisture and increased adhesion, which lead to a higher rat

    Jul 24, 2017

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008