Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Adsorption of Alkylammoniums in the Interlayer of Montmorillonite and its Effect on the Viscosity of Organo-Montmorillonite GelsAdsorption of Alkylammoniums in the Interlayer of Montmorillonite and its Effect on the Viscosity of Organo-Montmorillonite Gels
Sep 13, 2010
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western AustraliaBy J Lea, D C. Kettlewell
The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst
Jan 1, 2009
-
Open Pit Strategic Mine Planning with Automatic Phase GenerationBy M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Flotation and Screening Recovery of Titanium Minerals from a Monazite Mineral Sands CircuitBy G W. Heyes, P J. Guy
Investigations were undertaken to assess the suitability of CSIROflotation methods for improving the efficiency of separation of heavyminerals in the monazite circuit at the Westralian Sands Limitedop
Jan 1, 2001
-
Automation for efficient separation with the Outotec SLon® vertically pulsating high gradient magnetic separatorBy I Sherrell, R Jain, P Jansson
With the depleting iron reserves and difficult market conditions, precision in separation efficiency is of utmost importance. Classical local control options are predominant in the industry, but their
Jul 24, 2017
-
IsaMill - The Crossover from Ultrafine to Coarse GrindingBy B D. Burford
High intensity stirred milling using the IsaMill has been the enabling technology for many projects by transforming the economics of fine grinding and simplifying circuit design. IsaMill grinding tech
Jan 1, 2006
-
The Significance of Superincumbent Strata Stiffness and its Impacts on Coalmine DesignBy J M. Galvin
The traditional engineering approach to assessing stability is based on comparing resisting force (capacity) to driving force (demand), or strength to working stress. In underground coal geomechanics,
Nov 5, 2014
-
Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open PitThe Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti
Nov 25, 2010
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Recent Investigations in Electrostatic SeparationThe beach sand industry is the only Australian mineral industry which, so far, has used electrostatic separation on a full commercial scale. The main application of the process is for the separation o
Jan 1, 1954
-
Subtek™ 4D™ – Optimised blasting performance through the application of new underground bulk explosive technologyBy B Taylor, S Evans
Bulk explosive technology for underground mining has not seen any significant technological advances since the widespread transition from ammonium nitrate fuel oil (ANFO) to ammonium nitrate emulsions
Sep 1, 2024
-
Geochemical Studies in the Coromandel Peninsula - The Use of Calcium in Stream Sediments as a Guide to AlterationAcid soluble calcium is depleted in drainage sediments from hydrothermal alteration centres in the Coromandel Peninsula. The routine analysis of acid-soluble calcium on drainage samples is an economic
Jan 1, 1979
-
Mining Practices and their Effect on Mobile Equipment CostsBy R Lethlean
The mining industry in its drive to optimise equipment use and minimise cost simply to remain profitable in an uncertain commodity market needs to develop a greater understanding of equipment capabili
Jan 1, 1998
-
A Black Canvas – Planning a Greenfield Coalmine in New South WalesBy T W. C Stambolie
Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent
Jun 28, 2016
-
Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selectionBy G Burton, S Fityus, J Li, S Vaughan, D Payne
Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the
Jul 1, 2021
-
Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zonesBy J G. McLellan, B Miller
Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio
Sep 20, 2017
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted AnnulusBy M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
Maintaining and Improving Grade Control at New Celebration Gold MineNew Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between
Jan 1, 1991
-
Production and Ventilation Management Towards in Integrated Mine Information SystemBy Ward M
The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.
Jan 1, 1995