Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation

    By C Dowding, C Aimone-Martin, P Abeel

    This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc

    Aug 24, 2015

  • AUSIMM
    Geostatistical Estimation at Porgera: The Disjunctive Kriging Approach

    By Armstrong M

    The highest grades of the Porgera gold deposit, Papua New Guinea, are contained in Zone 7 due to the presence of the Roamane fault, which acted as channelway of the gold-bearing fluids. Prior to the d

    Jan 1, 1990

  • AUSIMM
    Ventilation At Depth At North Broken Hill Limited

    Autocompression and virgin rock tempera ture have a marked influence on the ventilation of the lower levels at North Broken Hill Limited N.S.W. To maintain comfortable working temp- eratures without

    Jan 1, 1977

  • AUSIMM
    Depression of Arsenopyrite Flotation and its Separation from Pyrite in Guangxi Shanhu Tin Mine

    By Shinnosuke U, Zhang HE, Qian X

    In this paper it is recommended that pyrite is to be separated as froth from arsenopyrite by selective depression of arsenopyrite in strong alkaline medium (1), by oxidation with chlorinated lime (I

    Jan 1, 1993

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metal

    By Y Zhang, Z Zhao

    The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t

    Aug 21, 2024

  • AUSIMM
    Synergistic defoaming/anti-foaming in zinc leaching with surfactant and silicone based defoamers

    By Q Zhou, H Nordberg, W Wang-Geissler

    Efficiently controlling foam/froth within mineral processing continues to pose a challenge to the mining sector. The foaming characteristics of aqueous solutions for two-phase systems of air/liquid ar

    Aug 24, 2022

  • AUSIMM
    The Application of Automated Samplers in Copper/Nickel Processing

    By J E. Powalisz

    "The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass

    Jul 29, 2014

  • AUSIMM
    A Simple and Proven Technology for Reclaiming Acidic Mine Waters

    By B Mack

    The cost of water treatment is now more than ever a major consideration for maintaining an environmentally and economically sustainable mining operation. As an industry, we often have to consider wate

    Jan 1, 2009

  • AUSIMM
    Modelling Structural and Lithological Controls on the Mobility of Fluids and Gold in Orogenic Belts – Examples from New Zealand and Taiwan

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Southern Alps of New Zealand and the mountains of Taiwan are both young transpressive o

    Mar 18, 2015

  • AUSIMM
    Improved Flotation Process Control at Newcrest's Telfer Operation

    By S Hille, J Karageorgos

    With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te

    Jan 1, 2007

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • AUSIMM
    Indicator kriging saves the day – improving reconciliation

    By A Purton, C Taylor, E Conroy

    The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties

    Mar 22, 2022

  • AUSIMM
    The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modelling

    By E Asakpo, S Chaffer, A Heath

    Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin

    Aug 29, 2018

  • AUSIMM
    Application of Tracer Gas Flow Profiling to Improve Secondary Ventilation Practice – A Pilot Study

    By S Wilkinson, S Black, L van den Berg

    "The mine ventilation system plays an important role in mitigating human exposure to diesel particulate emissions (DPM), exhaust gases and heat in underground mines. The mine’s secondary ventilation s

    Aug 31, 2015

  • AUSIMM
    Drying and Roasting of Zinc Concentrate at Zeehan Works of Electrolytic Zinc Company of Australasia Ltd

    ZINC concentrate, produced at Zeehan by flotation from Read Rosebery ore, is also dried and roasted at the same place for the production of a calcine suitable for use in the electrolytic zinc process

    Jan 1, 1927

  • AUSIMM
    The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit mines

    By C Jacobsen, N Harries

    Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f

    Nov 29, 2022

  • AUSIMM
    WAD Cynoprobe - A Case Study for the Development of an Online Weak Acid Dissociable (WAD) Cyanide Measurement Device

    By P Lotz

    With the recent increase in environmental awareness, gold mining companies are fast becoming signatories of the International Cyanide Management Code (ICMI, 2007). The objective of the Code is to impr

    Jan 1, 2007