Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
Research on in situ recovery technology of hot-dip galvanised drossBy X Li, R Chu, X Deng
The hot-dip galvanising industry is the largest consumer of zinc, with over 40 per cent of the world’s total annual production of zinc used for galvanised steel. The dross generated in the hot-dip gal
Jun 19, 2024
-
Homogeneity assessment of crushed and pulverised iron ore certified reference materials – implications for laboratory quality controlBy J Carter, B J. Armstrong
Best practice for the submission of samples to an internal or commercial laboratory requires quality control materials to be included for the purpose of independently and comprehensively assessing lab
Sep 18, 2023
-
Analysis of Slurry Sampling Arrangements at a Froth Flotation PlantBy P Minkkinen, J Lohilahti, T Korpela, B McPherson
Concentrator plants intake the ore from the mine and produce concentrates by extracting valuable minerals in a succession of process steps. Controlling the extraction process and detecting changes in
Jul 29, 2014
-
Infrared Spectroscopic Drill Core Logging - Making Inroads to Deposit Scale 3D MineralogyBy A Hacket, M Haest, I Vitins
Infrared spectroscopy has the ability to accurately measure mineralogy of drill cores, allowing for better spatial characterisation of iron ore deposits and potentially improving the prediction of key
Aug 12, 2013
-
RISKGATE« - A Case Study in Application to Fires on Mobile PlantBy J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott
Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address
Sep 18, 2012
-
Analysis of Twin Road Tunnels Using Numerical Modelling TechniquesBy D R. Wines
The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi
Mar 8, 2011
-
Traceability of native seed for mine rehabilitationBy A Grant, H Thomas, C Clarke, B Fuller
Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali
Aug 2, 2023
-
Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale ExperimentsBy D Maldonado
BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in
Jul 11, 2011
-
No entry mechanised presink of the Wira Hoisting ShafBy D Kilkenny
This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min
Mar 29, 2023
-
Blast Design Parameters and Their Impact on Rock FragmentationBy B Prasad, M P. Roy, P K. Singh, C Drebenstedt
Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper
Aug 24, 2015
-
Goodbye from the Argyle diamond deposit – insights from deep mining of the world’s largest diamond depositBy C B. Smith, G L. Boxer, S W. Moss, A L. Jaques, V Lorenz, M J. Rayner
The Ernest Henry Iron Oxide Copper Gold deposit is hosted in a large dilation between two moderately dipping shear zones found in the footwall and hanging wall of the deposit. These shears are control
Mar 22, 2022
-
Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron OreBy A E. Petts
Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro
Jul 11, 2011
-
The Mineral Industry-Csiro's Role in Research and EducationThe Australian Mineral Industry has to compete on world markets, so its mineral research has to be aware of overseas developments, it must be of world class, and it must utilise as many ideas as pos
Jan 1, 1986
-
Does process control sampling always have to be a compromise?By M Singh, R C. Steinhaus, J J. Rust
Metallurgical process control systems in mineral plants often employ state-of-the-art monitoring analysers in an attempt to optimise plant operations and enhance mineral recoveries. These systems are
May 9, 2017
-
Razorback Iron Ore Project – A New Iron District to Meet the Growing Demand of an Iron Hungry WorldBy M Flis
The Razorback Iron Ore Project is a high tonnage, low-grade magnetite deposit that defines a new iron ore district in South Australia. Known since the 1960s, the deposit has come into its own as the i
Jul 11, 2011
-
The Use of Gravity as an Exploration Tool for the Robertson Range and Davidson Creek Iron Ore Deposits, East PilbaraBy R McCarthy, P Darvall
FerrAus Limited's Robertson Range and Davidson Creek iron ore projects are located on the far eastern margin of the Hamersley Province, approximately 100 km to the east of Newman, Western Austral
Jan 1, 2009
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Discovery of the Corunna Downs DepositsBy P J. Howard, P Darvall, J H. Mainwaring
In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south
Jul 13, 2015