Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification Circuits

    By Lynce AJ

    A method has been developed for the prediction 'of 'the- . performance of a multi-stage grinding=cyclone classification circuit of any degree of complexity on any ore for a wide range `of

    Jan 1, 1964

  • AUSIMM
    Exploration and Development History of the Batman Gold Deposit, Mt Todd Project, Northern Territory

    The Mt Todd Project is located 42 km northwest of Katherine in the Northern Territory. The identified mineral resource estimate for the Batman gold deposit is 66.7 million tonnes (Mt) grading 1.4 gr

    Jan 1, 1994

  • AUSIMM
    Some Practical Aspects of Ore Reserve Estimation at Chuquicamata Copper Mine, Chile

    By Dunn P. G

    The copper ore reserves at the Chuquicamata mine were re-estimated during March to June 1994, as part of a comprehensive audit of the mine's overall short- and long-term planning. The basic pri

    Jan 1, 1995

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    Komatiite-Hosted Nickel Sulphide Deposits, Honeymoon Well, Western Australia

    By Woodhouse M, Drew GJ, Andrews DL

    The Honeymoon nickel sulphide deposits are located 45 km south of Wiluna in the 2.7 Ga old Agnew-Wiluna greenstone belt in the NE of the Yilgarn Craton (Figure 1). Both disseminated and massive nic

    Jan 1, 1996

  • AUSIMM
    Chlorine as a Suitable Lixiviant for Gold

    Chlorine as a lixiviant for gold possesses a number of significant chemical and Idnetic advantages over cyanide but because of its corrosive and vaporous nature the method of implementation needs to

    Jan 1, 1991

  • AUSIMM
    Perth City Rail Tunnel Project - Overview, Geotechnical Conditions and Building Protection

    By M Grinceri

    The New MetroRail City Project was completed in 2007 in Perth, Western Australia. The project included construction of two underground stations, twin bored rail tunnels of 1.4 km combined length and c

    Jan 1, 2008

  • AUSIMM
    Ventilation and Refrigeration Design for the Access and Ore Production Decline to the Deep Copper Orebody at the Mount Isa Mine

    By Nixon C. A

    The exploration of Mount Isa Mines' new copper source will require the development of a five kilometre 4.7 x 5.5 metre blind decline commencing 1000m below the surface and extending to 1600m

    Jan 1, 1988

  • AUSIMM
    The Lake Rotokaua Sulphur Deposit

    The Lake Rotokaua sulphur deposit, near Taupo, New Zealand, is a lacustrine sedimentary ore body, 220 acres in area and from 7 ft to 96 ft thick, containing, within the area drilled to date, some 20

    Jan 1, 1971

  • AUSIMM
    ENVIB-Blast Vibration Analysis System

    By Richards AB

    This paper describes the ENVIB software system, which has been developed in a menu-driven form to aid in the monitoring and assess- ment of vibration caused by routine blasting operations and for res

    Jan 1, 1988

  • AUSIMM
    The Discovery and Evaluation of the Vera-Nancy Deposit, North Queensland

    By Jones BH

    Discovery of the Vera-Nancy deposit in late-1995 followed 12 years of active exploration in and around the Pajingo Epithermal System, an andesite hosted veinfield covering an area of 150 square kilome

    Jan 1, 1997

  • AUSIMM
    Rate of Production and Cutoff Grade-A Program Systems for Teaching and Experimentation

    By Daoust G, Dubois JF

    The optimal sequence of decisions on rates of production and cutoff grades is obtained by a dynamic programming model. The main parameters are : 1. the size of the deposit, average grades and grad

    Jan 1, 1977

  • AUSIMM
    Sampling and Production Planning Techniques at Bougainville Copper Limited

    By Scott B. R

    Bougainville's copper mine is located on the west slope of the Crown Prince Range on Bougainville. A high grade copper concentrate is produced for sale to overseas customers. Production planni

    Jan 1, 1976

  • AUSIMM
    The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines Limited

    By Onton W

    During the latter part of 1936, conditions encountered in sinking the Main Ore shaft made it impractical and uneconomical to continue deepening it to serve haulage levels below the present No. 5

    Jan 1, 1988

  • AUSIMM
    Stability of Underground Coal Mine Openings and Structures with Particular Reference to Vibrations from Surface Mine Blasts

    By Prakash AJ, Singh PK, Dhar BB

    Safety and stability of underground mine openings, coal pillars and water dams in the near vicinity of operating surface mines are endangered from excessive blast induced vibrations. This paper deal

    Jan 1, 1995

  • AUSIMM
    Mechanical Excavation for the Tunnels in Soft Rock

    By Inoue T, Takahashi N

    To construct the accessing railroad line to the northern portal of Seikan Undersea Tunnel, nine tunnels amounting 7.4km in their total length were excavated through soft mudstones of young- er tert

    Jan 1, 1987

  • AUSIMM
    Japanese Experiences in Underground Coal Gasification-A Review

    By Ueki S

    Underground coal gasification (UCG) is a promising process for obtai- ning energy from coal, which is either unmineable with current mining techno- logy or uneconomic to recover, using conventional

    Jan 1, 1987

  • AUSIMM
    Processing of Pisolitic Iron Ore at Mesa J

    Robe River Iron Associates (RRIA or Robe) is widely regarded as the worldÆs most cost-effective, consistent and reliable supplier of iron ore. It has been in operation since 1972 and globally is the f

    Jan 1, 2000

  • AUSIMM
    The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port Pirie

    On the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l

    Jan 1, 1975

  • AUSIMM
    Geostatistical Texture Modelling in Enhancing Ore Reserve Estimation in Base Metal Deposits

    By Dimitrakopoulos R

    Ore textures in base metal deposits are an important factor in the liberation of the economic components of the ore, metal recovery and reagent consumption during beneficiation. Optimising the mine

    Jan 1, 1997