Pemali Open Pit Mine Slope Stability ProblemBy Bhattacharyya A. K>
The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary
Jan 1, 1989
-
An Overview of the Telfer 10 Mtpa Dump Leach OperationBy Mitchell I, Gelfi P, Dunne R, Pyper R
Dump leaching at Teller in its present form began in the fourth quarter of 1988 as an adjunct to milling operations. Initial plans called for a dedicated dump leach facility capable of processing o
Jan 1, 1994
-
Some Performance Characteristics of Ammonium Nitrate-Based ExplosivesBy Hagan T. N
Quite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more
Jan 1, 1974
-
The Goodyear Nickel Prospect, Carnylia Hill, Western AustraliaBy Gole MJ
The Goodyear nickel prospect is located 45 km southeast of Kalgoorlie (31.04¦S, 121.80¦E) near the eastern boundary of Hampton Area - East Location 45 (Figure 1). Nickel mineralisation was discover
Jan 1, 1996
-
Geology and Gold Mineralisation at Mount Leyshon, North QueeslandBy Hodkinson I, Teale GS
Mount Leyshon is an open cut-heap leaching operation that commenced production in early 1987. Open pit reserves are 6.3 m.t. grading 1.8 g/t Au and 4.8 g/t Ag and expected annual production is 68,
Jan 1, 1987
-
Some Recent Changes and Innovations at Mount Isa MineThe planned extraction of deeper copper ore at Isa Mine has necessitated a review of existing equipment and methods to contain costs and improve working conditions. Mining is in progress for a cru
Jan 1, 1984
-
Iron Ore Bedding & Blending at the Newcastle SteelworksExpansion of the B.H.P. Co. Ltd. mater ials handling facilities, at their Newcastle Steelworks, began in 1964 and continued until 1970. The present complex handles the annual iron ore requirement o
Jan 1, 1972
-
Borescope Techniques for Assisting Colliery Roof ControlBy Rixon LK, Walton KP
Evidence will be presented to show that borescope inspection of mine roofs is one of the most useful techniques available for stability assessments. ACIRL currently has four borescopes, comprising
Jan 1, 1986
-
The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NTBy Hein K. A A
The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.
Jan 1, 1994
-
Cross Wellacoustic Tomography to Locate Abandoned Underground Mines and Subsidence FailureThe U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomogr`aphic image reconstruction software for the detection and delineation of abandoned und
Jan 1, 1992
-
Design and Construction of No. 2 Residue Dam at RoseberyBy West Coast Staff
Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic
Jan 1, 1958
-
Overburden Preparation Moura-Kianga Coal Mines, Bowen BasinQuite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more
Jan 1, 1974
-
Recent Grinding Practice in the Copper Concentrator of Mount Isa Mines LimitedBy M Gao, V Lawson, W Valery
Changes in metal prices and mine output over recent years have required the Copper Concentrator of Mount Isa Mines to operate at annual tonnage rates varying from 4.0 million to 6.5 million tonnes. Se
Jan 1, 2000
-
Fluid Inclusion and Sulphur Isotope Research, Mount Morgan, QueenslandBy Smith J. W, Wilkins R. W T
This paper is a preliminary report of research on the Mount Morgan gold-copper deposit being done at the Division of Mineralogy, CSIRO. Fluid inclusion and sulphur isotope measurements were made on
Jan 1, 1974
-
The Financing and Development of the Nagamble Gold Mine, VictoriaThe Nagambie heap leach gold mine commenced production of gold in September, 1989. The mine,120km north of Melbourne in Victoria, Australia, was developed by Perseverance Mining Cor- poration Ltd, a
Jan 1, 1991
-
Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, CobarThe last two years have seen a rapid change-over from mechanised cut and fill. stoping to the more economic and productive long hole open stoping method, such that today more than 80 per cent of to
Jan 1, 1977
-
Sustainability of the Flooding of Lignite Mining Lakes as a Remediation Technique Against Acidification in the Lusatian Mining District, GermanyBy W Uhlmann, U Grnnewald, B Nixdorf
Flooding with surface water is the preferred technique for the abatement of acidification from pyrite oxidation in the lakes of abandoned Lusatian lignite mines. However, water resources of the region
Jan 1, 2003
-
Professional Training for the South African Minerals Industry - Macro PerspectiveWhile South Africa is well endowed with mineral resources, it is generally accepted that its future will be determined more by the development of its human resources than its mineral wealth. The c
Jan 1, 1986
-
The Place of Oil and Gas in Future Energy Patterns in AustraliaAverage annual growth in consumption of primary energy in Australia over the past 10 years has been 5·5 per cent compared to a world average of 4·1 per cent.Over the next 10 years growth rat
Jan 1, 1971
-
Assessment of High Shear Stator Performance at Kanowna Belle Gold MineBy S MacKinnon, J Kok
Potential areas for improvement in flotation performance were identified during JKTech model development surveys in October 2003. Subsequent implementation of the JKTech recommendations in consultatio
Jan 1, 2006