Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Rabbit Lake Mill Operation Past, Present and FutureBy K. Wyper
"Gulf Minerals (Canada) Limited' s Rabbit Lake Uranium Operation is located in the northern portion of Saskatchewan, 198 miles southeast of Uranium City and 134 miles northwest of Lynn Lake Manitoba.T
Jan 1, 1982
-
Novel Dewatering Aids for Mineral Concentrates and CoalBy M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu
"According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus
Jan 1, 2005
-
Successful Design of the NICO Grinding Circuit for Unusually Hard OreBy Mike Samuels, John Starkey
"This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi
Jan 1, 2010
-
Environmental Improvements at Sudbury, OntarioBy R. E. Michelutti
"The Sudbury area environment became drastically altered commencing in 1871 with lumbering, repeated fires and early open roasting operations from 1887 to 1929. These combined factors had such a prono
Jan 1, 1986
-
A Laboratory Protocol to Evaluate Potential Chemical Interferences in Flotation Circuit ApplicationsBy B. G. Cousins, B. O’Rourke, C. Spence
"Some non-flotation chemistries are added to flotation circuits directly and indirectly to control issues such as scaling and dust. Since the dosage levels are generally not very large, a standard lab
Jan 1, 2013
-
In situ acid leaching of copper tailings deposits: A case historyBy C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo
The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells
Jan 1, 2001
-
Development of Small Scale Flotation Cells and its Application in Milling OperationsBy R. Rosenblum, J. Y. Kim, D. Shink, K. G. Stowe
"A small scale continuous flotation cell was designed and constructed at the Noranda Technology Centre to develop a mobile testing flotation circuit located next to the production circuit. This mobile
Jan 1, 1992
-
Treatment of Non-Magnetics at FalconbridgeBy C. H. Dionne, J. A. Holmes, B. J. Huls
"Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce
Jan 1, 1991
-
Hoist rope improvements through thermo plastic enhancementBy Bill Parnell
"Friction winders and double drum winders have been used in the vertical shaft mining industry for over 100 years. In that time, there have been many changes made in the electronic and mechanical fiel
Jan 1, 1995
-
Spodumene Processing at TANCOBy J. Flemming, R. O. Burt
"The Tanco pegmatite is located in the Bird River greenstone belt of southeastern Manitoba approximately 160 km northeast of Winnipeg (Figure 1). This pegmatite body was discovered in 1929 and subsequ
Jan 1, 1986
-
The Highmont Concentrator StartupBy R. S. Fukuhara, M. J. Allan
"Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the
Jan 1, 1982
-
Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek ConcentratorBy O. Matwijenko
"The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi
Jan 1, 1980
-
Mill Project Development at El Limon, NicaraguaBy Steve Hubbard, Brad Marchant, Rolando Cuadra
"Triton Mining Corporation acquired the rights to Mina El Limon in Nicaragua in 1993 by international bid. The bid included the gold operations at Limon and an exploration concession of approximately
Jan 1, 1997
-
Milling at Agnico-Eagle Gold Mines LimitedBy K. Mikulash
"Agnico-Eagle Mines Limited is located at Joutel in North-Western Québec. The mine is about four miles north-west from the town on the left bank of the Harricana River. The present mining is 1,800 fee
Jan 1, 1976
-
Research and Development for an Ultra-Low Profile LHDBy Patrick F. R. Murphy
An ultra-low profile LHD has been developed by EJC Mining Equipment of Burlington, Ontario for narrow-reef mining applications. This paper discusses the challenges encountered during the evolution of
May 1, 2004
-
Advances in the Use of Thin, Spray-on Liner SystemsBy James F. Archibald
In historic mining practice, typical thin liner support systems have been considered to comprise non-reinforced or mesh-reinforced shocrete linings. In the early 1990?s, development of alternate forms
May 1, 2002
-
The Systematic Reclamation of Gold Mine TailingsBy Jean-Claude LeRoy, Herman Keller
"INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part
Jan 1, 1975
-
Numerical and experimental study of wedge penetration into oil sandsBy D. D. Tannant
An experimental and numerical study was conducted on the geomechanical behaviour of oil sands during penetration tests in which a steel wedge with an apex angle of either 20 degrees or 30 degrees was
Jan 1, 2002
-
Conditioning of Fractured Rock Masses for the Excavation with EPB ShieldsBy A. Chieregato, C. G. Oñate Salazar, D. Martinelli, D. Peila, M. Barbero
This paper is aimed to confirm the possibility to excavate fractured rock masses by using EPB shields, even in presence of relevant water tables. This verification is based on laboratory test experien
Jan 1, 2015
-
Cyclone Modelling - Case StudiesBy R. N. Murarka
"Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced
Jan 1, 1992