Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Federal budget disappoints

    By Robert B. Parsons

    "Finance Minister Paul Martin's first budget disappointed almost everyone. The business sector was disappointed at the some what feeble attempt to grapple with the country's deficit. The min

    Jan 1, 1994

  • CIM
    Design in Weak Rock Masses: Nevada Underground Mining Operations

    By Tom Brady

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate data on wea

    May 1, 2006

  • CIM
    An Integrated 3D GIS Model of the Yellowknife Camp: A Tool for Efficient Development

    By Garth D. Kirkham, James P. Siddorn, Hendri Falck

    "Abstract - As an integral part of the Geological Survey of Canada’s EXTECH III Project, a threedimensional computer model has been created of the Con and Giant gold mines in the Yellowknife Greenston

    Jan 1, 2003

  • CIM
    Autonomous vs Manual Haulage Trucks - How Mine Simulation Contributes to Future Haulage System Developments (a7524990-6284-4f20-9922-0fca1327b2e7)

    By Juliana Parreira

    The past decade shows record increases in global demand for minerals and metals with an accompanying significant decline in skilled personnel. Mining companies today are examining new technologies to

    May 1, 2010

  • CIM
    Furnace Explosions with a Focus on Water

    By H. J. Oterdoom

    SMS Siemag (SMS) has always been the front runner in safety aspects of electric smelter plants for the ferro-alloy and non-ferrous industry. The awareness for safety increased significantly over the p

    Jan 1, 2014

  • CIM
    Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick (a738daf4-2f2a-4901-b06d-657f347a1821)

    By Robin N. Adair

    The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotiterich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally continuous sheet

    Jan 1, 1992

  • CIM
    Comparison of Ore Reserve Grades with Mill Head Grades Using Statistics in Two Gold Mines, Sudbury District, Ontario (7ca5ee8d-4f87-46b6-ae68-732b4e5e2c31)

    By Elaine Ellingham, Francis T. Manns

    "The Orostar and Scadding were two small gold mines owned and operated by Orofino Resources Limited. Conventional statistical treatment indicates an identical arithmetic mean grade of 0.22 oz/T Au for

    Jan 1, 1992

  • CIM
    Removal of Heavy Metals from Tailings Recycle Water at Mattabi Mines Ltd.

    By Jean-Guy L. Gauthier

    "With the Ontario Ministry of the Environment stipulating that the cumulative concentration of copper, lead, zinc and nickel in mine mill effluent must be no greater than 1.0 milligram per litre, it h

    Jan 1, 1980

  • CIM
    IOCC Using Expert System to Meet Production and Quality Control Goals

    By Paul Delottinville, Maynard Hall, Henry Hillier

    "An expert system application for supervisory control and optimization of the indurating process at the Iron Ore Company of Canada (IOCC) has been developed and installed in closed-loop. Prior to the

    Jan 1, 1998

  • CIM
    An Investigation into the Regrinding Circuit Efficiency at Miduk Copper Complex

    By R. Shamsodini, A. Poor Zaeif Doost, H. Haji Amin Shirazi, M. R. Garmsiri

    "With columns being installed in rougher section at Miduk Copper Complex, the rougher feed mainly reports to rougher-scavenger cells. To evaluate the efficiency of regrinding circuit, we conducted flo

    Jan 1, 2012

  • CIM
    New Locked Charge Protection System Prevents Damage To 14mw Geared Mill

    By H De Beer

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Nov 1, 2011

  • CIM
    Evaluation of a composite soil cover to control acid waste rock pile drainage

    By Mike D. Riley, Alan V. Bell, Ernest K. Yanful

    Acid mine drainage (AMD) research under the MEND program has been ongoing since 1988 at the Heath Steele Mines waste rock piles including sulphide material, outside Newcastle, NB. In 1989 approximatel

    Jan 1, 1995

  • CIM
    Natural Feed-Stocks for Fabrication of Spare Parts = Sustainability for Planetary Missions

    By Bonnie Cooper

    3D printing by fused deposition can be used on lunar soil. The soil can be precisely size-separated to make the 3D printing process work efficiently. Using a MASER instead of a LASER would allow u

    May 1, 2013

  • CIM
    Millennium Deposit: The Emergence of a New Saskatchewan Uranium Mine

    The Millennium deposit, located in northern Saskatchewan between the McArthur River mine and the Key Lake mill, has considerable potential for becoming an operating mine. Located in the Athabasca Basi

    May 1, 2008

  • CIM
    Successor corporation rules-an update

    By Robert B. Parsons

    "The February 18, 1987, Federal Budget contains a proposed amendment which would simplify somewhat the ""successor corporation"" rules in the Income Tax Act. Despite this amendment, though, the import

    Jan 1, 1987

  • CIM
    Integrated Process Prediction

    By Malcolm Powell

    "Predicting the performance of the whole mining process is surely the holy grail of predictive simulation. This can be named ‘Integrated Process Prediction’.The objective is to be able to predict the

    Jan 1, 2016

  • CIM
    Development of an Innovative Mixed Chloride Leaching Process for the Recovery of Rare Earths

    By V. I. Lakshmanan

    Rare earth elements and yttrium (REEs+Y) are being used in the making of hybrid electric cars, catalytic converters, wind power generators, LEDs, hard disc drives, flat panel displays, and portable el

    Jan 1, 2014

  • CIM
    Integrating Work Index into Mine Planning at Large Scale Mining Operations

    By Jose A. Caceres

    Mine planning and mineral processing optimization are usually treated as two unconnected problems, especially at open pit and panel caving mines where the cut-off grade is practically the only variab

    May 1, 2004

  • CIM
    Geology as a Risk Factor in Project Evaluation: Its Impact on Reserve Estimation (2ef6f64b-2707-4726-a421-479467e1e910)

    By Chris M. Healey

    "Perhaps the single most significant variable in the evaluation of a mining project is the reserve estimate. Many parameters are considered when estimating reserves, among them geology. This paper exa

    Jan 1, 1992

  • CIM
    Treatment of Complex Feeds at Noranda Copper Smelting and Refining

    By Peter Godbehere, Christian Desroches, Viken Baboudjian

    "Noranda Copper Smelting and Refining is a unit of Noranda Metallurgy Inc., comprising the Home smelter in Rouyn-Noranda, Quebec and the C.C.R. Refinery in Montreal East. The Home smelter provides cus

    Jan 1, 1995