    PSC Piles Overcome Challenges for $650m Power Plant

    By Tim Siegel, III Fondren, Billy Camp

    "INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic

    Jan 1, 2004

  • DFI
    Design And Performance Of Helical Screw Piles In Collapsible And Expansive Soils In Arid Regions Of The United States

    By David R. Black

    Foundation problems due to collapsible and expansive soils are well known throughout the arid western United States. Millions of dollars are spent annually to counteract the effects of such soils for

    Jan 1, 2002

  • DFI
    Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? Preface

    By Zhou Lu-Jian

    The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T

    Jan 1, 1991

  • DFI
    Characteristics And Application Of Soil Reinforcement By Jet Grouting ? Synopsis

    By J. W. Wang

    This article first explains the mechanism of forming strength in the Jet grouting reinforced foundation, and points out the function of cement hydrates and clay minerals in clayey soil, the reinforced

    Jan 1, 2010

  • DFI
    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study

    By Prasanta Paul, Aminul Islam

    "Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos

    Jan 1, 2015

  • DFI
    Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez Bridge

    By Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma

    Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t

    Jan 1, 2005

  • DFI
    Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)

    By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi

    "A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

    Jan 1, 2017

  • DFI
    Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA

    By P. B. Kelleher

    Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,

    Jan 1, 1989

  • DFI
    In Luxembourg-Walferdange 2 Problems Concerning The Geodynamic Motions Of The Planet Earth Are Studied Since 1963 - A) The Earth Tides

    By experience we know about the natural event of ocean-tides. In geophysics we say that the earth-tides phenomenon is the elastico-viscous response of the earth's body to the attraction potential

    Jan 1, 1987

  • DFI
    Numerical Simulation Of Quasi-Static Pile Load Test

    By N. Q. Huy

    This paper describes the application of finite element analysis to simulate the static and quasi-static pile load tests in different drainage conditions. The possible effect of excess pore water press

    Jan 1, 2006

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009

  • DFI
    Pile Design According to Eurocode 7, Highlights and Developments

    By Adriaan van Seters

    "Abstract The content of Eurocode 7 – Part 1 and Part 2 – with respect to piled foundations is outlined. The important role of pile testing is presented and the derivation of the characteristic value

    Jan 1, 2014

  • DFI
    A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty Ground

    By H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi

    "In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe

    Jan 1, 2015

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017

  • DFI
    Complex Deep Foundation System for Tall Tower in New York City

    By Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f

    Jan 1, 2017

  • DFI
    Vertical Bearing Capacity of Pile Installed by "EX MEGATOP" Method - Base Enlarged Pre-boring and Grouting Method for Pre-cast Pile

    By Hitoshi Ogura, Koichi Kobayashi, Sadao Yabuuchi

    "In Japan, most pile foundations using pre-cast concrete piles are installed by the bored pre-cast piling method, wherein pre-cast piles are installed in holes that have been excavated beforehand and

    Jan 1, 2005

  • DFI
    Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place Piles

    By Timothy C. Siegel

    Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi

    Jan 1, 2010

  • DFI
    Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia

    By James J. Neate

    The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install

    Jan 1, 1988

  • DFI
    Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway Bridges

    By Kouichi Tomisawa

    Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri