Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard
A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc
Jan 1, 2009
-
Comprehensive QA/QC Integrity Testing Using Thermal Integrity ProfilerBy Brad W. Taylor
"During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable
Jan 1, 2017
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, TorontoBy Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
A Case Study of Multichannel Analysis of Surface Waves (MASW) as a Tool to Characterize Unknown FoundationsBy Joseph T. Coe, Siavash Mahvelati, Philip Asabere
Characterization of existing foundations remains an important issue as foundation reuse and rehabilitation continue to garner increased attention. In the case of unknown foundations, geophysical and n
Jan 1, 2016
-
Comparison of LRFD Resistance Factors to Tension Pile Load TestsBy Seth H. Hamblin, John E. Regan, Dimitrios Palantzas
"Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto
Jan 1, 2015
-
Acceptance Of Timber Piles Based On Equivalent Driving EnergyBy Chu E. Ho
This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet PilesBy Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - SynopsisBy F Debidin
The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu
Jan 1, 2010
-
Analysis of Pile Interaction under Lateral Cyclic Load in Cohesiooless SoilBy Sudip Basack
"The topic of pile foundation subjected to lateral cyclic load is an age-old problem confronted by Geotechnical Engineers. The environment prevalent in ocean and shorelines necessitates the piles supp
Jan 1, 2005
-
Mansueto Library: Drama below Ground and AboveBy Patrick J. Lydon, Gregory A. Terri
"The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The
Jan 1, 2013
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Wireless Site Data Collection In Construction And Its Impact On The Business ProcessBy Jason N. Scott
It is now possible using low-cost wireless technology and rugged hand-held devices to record data on site electronically and for that data to be instantly available to others. This could potentially e
Jan 1, 2006
-
The Cosmopolitan Resort & Casino, Las Vegas, NV Specialty Foundation Work Under Extreme ConditionsBy Lawrence Piccagli
This past spring of 2006, BENCOR installed the concrete reinforced diaphragm walls for the COSMOPOLITAN RESORT & CASINO in Las Vegas, Nevada. The project highlights include the excavation of approx. 3
Jan 1, 2007
-
Micropiles For Rehabilitation Of Two Existing StructuresBy Jeffrey R. Hill
This paper discusses the use of micropiles for the rehabilitation of the following two structures: the Milwaukee Auditorium Theatre, in Milwaukee, Wisconsin, and the Cupples Ballpark Lofts, in St. Lou
Jan 1, 2008
-
Experimental And Numerical Assessment Of Osterberg Load Tests On Large Bored Piles In SandBy Roberto Nova
The selection of the Osterberg Cell (O-Cell) technology as the standard testing method for deep foundations of the Railways Po Viaduct in Northern Italy offered a relevant number of field measures on
Jan 1, 2008
-
Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part II: DM, FMI, Mass Stabilization & CSVBy Ali Porbaha
In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.
Jan 1, 2002
-
Estimation Of Horizontal Deformational Property Using A Pressuremeter Test For The Evaluation Of Lateral Bearing Capacity Of A PileBy Hyung-Min Kwon
There are a number of methods available that can be used to estimate the bearing capacity of piles that are subject to lateral load, such as the theory of subgrade reaction or the elastic continuum ap
Jan 1, 2008
-
Port Orange Drilled Shaft Load Tests - IntroductionBy David K. Crapps
The drilled shaft load tests at Port Orange were part of a demonstration project sponsored by the Federal Highway Administration (FHWA) and the Florida Department of Transportation (FDOT). Three load
Jan 1, 1989
-
Minipiles And Compaction Grouting For Seismic Retrofit Of Transportation Structures In The New Madrid Fault ZoneBy Steven D. Scherer
The highest earthquake risk in the United States east of the Rockies is along the New Madrid Fault System, which extends for 193 km (120 miles) through the Central Mississippi Valley from northeastern
Jan 1, 2001