    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Fundamental Tests On The Performance Of High Capacity Pin PilesSM

    By Donald A. Bruce

    Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho

    Jan 1, 1993

  • DFI
    Cost Effective Drilling Of Extra Large [XL] Monopile Foundations

    By Phil Wilkinson, Sam Whitaker

    "The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo

    Jan 1, 2017

  • DFI
    An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In Sand

    By Giuliana A. Zelada

    This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature

    Jan 1, 2000

  • DFI
    Interlocking H-Sections For Cofferdams Resist High Pressure

    By Marc Dondelinger

    Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca

    Jan 1, 1985

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical Approach

    By Özgür Bezgin

    This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t

    Jan 1, 2009

  • DFI
    Examples Of The Use Of Temporary Works Soil Nailing In The UK And Ireland

    By Martin J. Pedley

    The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c

    Jan 1, 2000

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • DFI
    Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

    By Jean J. Abiassi

    The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t

    Jan 1, 1994

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • DFI
    New Concepts For CFA (Auger Cast) Pile Controle - Synopsis

    By Shachar Magali

    This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique

    Jan 1, 2000

  • DFI
    Hydraulic Impact Pile Hammers ? Background

    By Patrick Bermingham

    The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes

    Jan 1, 1987

  • DFI
    The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis

    By Kenneth Gavin

    The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded

    Jan 1, 1996

  • DFI
    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006

  • DFI
    Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction Hazard

    By Dhanaji S. Chavan, Thallak G. Sitharam

    "It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi

    Jan 1, 2017

  • DFI
    Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:

    By Robert W. Bergwall

    The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T

    Jan 1, 1997

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft Construction

    By C. Vipulanandan

    It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas

  • DFI
    Assessing the Bearing Capacity of Existing Wood Pile Foundations

    By Almer E. C. van der Stoel

    "Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e

    Jan 1, 2014

  • DFI
    The Spadina Pier Cofferdam - Design, Installation & Performance

    By Jan A. Nilsen

    This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one

    Jan 1, 1987