Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Seal Slab Prestressed Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p
Jan 1, 2013
-
Fundamental Tests On The Performance Of High Capacity Pin PilesSMBy Donald A. Bruce
Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho
Jan 1, 1993
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017
-
An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In SandBy Giuliana A. Zelada
This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature
Jan 1, 2000
-
Interlocking H-Sections For Cofferdams Resist High PressureBy Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted PilesBy John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical ApproachBy Özgür Bezgin
This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t
Jan 1, 2009
-
Examples Of The Use Of Temporary Works Soil Nailing In The UK And IrelandBy Martin J. Pedley
The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c
Jan 1, 2000
-
High Capacity And Fully Removable Soil AnchorsBy Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002
-
Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment DescriptionBy Jean J. Abiassi
The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t
Jan 1, 1994
-
Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? SynopsisBy M. Pernot
A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati
Jan 1, 2010
-
New Concepts For CFA (Auger Cast) Pile Controle - SynopsisBy Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
Hydraulic Impact Pile Hammers ? BackgroundBy Patrick Bermingham
The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes
Jan 1, 1987
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - SynopsisBy Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed ProjectsBy E. Stoetzer
In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s
Jan 1, 2006
-
Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction HazardBy Dhanaji S. Chavan, Thallak G. Sitharam
"It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi
Jan 1, 2017
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Assessing the Bearing Capacity of Existing Wood Pile FoundationsBy Almer E. C. van der Stoel
"Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e
Jan 1, 2014
-
The Spadina Pier Cofferdam - Design, Installation & PerformanceBy Jan A. Nilsen
This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one
Jan 1, 1987