Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021

  • DFI
    Comparative Study On Numerical Analysis Of Laterally Loaded Pile

    By Tiruvengala Padma, Nilesh Naik

    Piles are common type of deep foundation elements used for the special bridges, transmission towers, Jetties, and tall structures. Lateral loads on the structures can be due to either earth pressures,

    Sep 1, 2022

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016

  • DFI
    Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?

    By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs

    Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS

    Jan 1, 2019

  • DFI
    A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in Turkey

    By Arash Khosravifar, Amalia Giannakou

    "Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d

    Jan 1, 2017

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    3D FEM Modelling of a Ground Improvement Solution

    By Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim

    A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo

    Sep 8, 2021

  • DFI
    Case Histories On The Applications Of Colloidal Silica For Permeation Grouting

    By Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden

    Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject

    May 1, 2022

  • DFI
    Determination of Initial Stiffness of Drilled Shafts for the Analysis of Settlements under Service Loads

    By Carlos A. Prato, Federico Pinto

    "ABSTRACTThe design of drilled shafts often incorporates large factors of safety, for which settlements under service loads are highly influenced by the initial elastic stiffness. In the case of group

    Jan 1, 2014

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • DFI
    Virtual Imaging Technologies as Decision-Making Tools for Geo- Hazards

    By Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas

    Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,

    Jan 1, 2019

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USA

    By Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka

    "The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine

    Jan 1, 2017

  • DFI
    Jacked Tunnel Construction

    "Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in

    Jan 1, 2003

  • DFI
    A Tall Slender Tower Rises On Secant Piles and Drilled Shafts

    By Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet

    Jan 1, 2016

  • DFI
    Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic Building

    By Tai Luu, Maxim C. Schisler, Yaser Taheri

    The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student

    Jan 1, 2019

  • DFI
    Steel H-Piles For A 11.7-Mile Long Rail Rapid Transit Project

    By Jeongbok Seo

    The Dulles Corridor Metrorail Project (DCMP) involves the design and construction of a 23.1-mile extension of the Washington Metropolitan Area Transit Authority (WMATA) rail system. The initial 11.7-m

    Jan 1, 2010

  • DFI
    Augered Pile World Record Depth within a Soil Mix Basement

    By Andres M. Baquerizo, Jeremiah J. Filjones, Nicholas Feldt

    The Estates at Acqualina located in Sunny Isles Beach, FL, is comprised of two, ocean-front, 50-story, luxury towers with podiums and villas. With city regulations now requesting that above-grade floo

    Jan 1, 2019

  • DFI
    Compaction-Induced Lateral Earth Pressures And Vertical Shear Forces Acting On Non-Moving Retaining Walls

    By George M. Filz

    Restrained basement walls and unrestrained but massive concrete walls on rock foundations experience very small movements in response to lateral earth pressures. Such walls are often designed using at

    Jan 1, 2003

  • DFI
    Settlement Control Of A Road Embankment Using Vertical Drains

    By Wei Tu

    A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that

    Jan 1, 2009