Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting in the New Mellinnium: The Salesmenship of Saying "No"!

    By Steve Dillingham

    The explosives business by nature is providing a specialized, valued service and associated products to a variety of customers whether mine, quarry or construction related. The level of performance de

    Jan 1, 2003

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Lightning Detection and Warning Systems

    By William H. Highlands

    Lightning is a natural phenomenon which poses a potential hazard to people, structures, and equipment unless adequate protection is provided. The type of protection required is related to the nature a

    Jan 1, 1989

  • ISEE
    Improving Quarry Production Rates by Reducing Bucket Fill Time

    By Elliott Giles

    "Measuring a blast’s performance based on the bucket fill time or “diggability” has always been achallenge due to the subjectivity generally involved. The diggability of a blast is often based onopini

    Jan 1, 2016

  • ISEE
    Computer Aided Blast Design for Tunnels

    By J L. Jethwa, A G. Gaithankar

    The paper deals with a software method developed to design the optimum blast parameters for tunnels and mine roadways for a given set of geo-mining condition without any major discontinuity. The appli

    Jan 1, 1993

  • ISEE
    Considerations for Drill and Blast Excavation of a Geologic Repository for the Disposal of High-Level Radioactive Nuclear Waste at Yucca Mountain

    By Norman Kramer, Roger Keller

    The authors would like to thank Austin Powder Company for their technical support and input, specifically Stephen Harris, Jason Ryan, and John Capers of Austin Powder, without whose support this paper

    Jan 1, 2000

  • ISEE
    The Neglected Step to Accurate Blast Monitoring: Proper Coupling

    By Donelson A. Robertson

    Proper coupling between the seismograph transducer and the surface is the most important aspect of seismograph monitoring but probably receives the least attention in many blasting situations. Without

    Jan 1, 1993

  • ISEE
    Behavior of Nitrogen Oxides in the Product Gases from Explosive Detonations

    By James Rowland, Marcia Harris, Richard Mainiero, Michael Sapko

    All explosive materials produce a cloud of reaction products, the most toxic of which is nitrogen dioxide (NO2). In the study reported here, 4.5-kg (10-lb) charges of blasting agent confined in either

    Jan 1, 2006

  • ISEE
    Blasting Specifications and Guidelines for Protective and High-Profile Blasting

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger

    Feb 6, 2023

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • ISEE
    Burn Cut Pull Optimization through Varying Relief Hole Depths

    By Michael Allen, Paul Worsey

    In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving

    Jan 1, 2015

  • ISEE
    Underwater Energy Measurements for Aluminized and Nonaluminalized Emulsion and Watergel Type Commercial Explosives

    By Oldrich Machacek, Gary R. Eck

    The underwater detonation test method has been long recognized as a useful tool for the evaluation of the energy release and relative effectiveness of commercial explosives. In this study, underwater

    Jan 1, 1990

  • ISEE
    Implementation of Seed Form Vibration Analysis, Modelling and Electronic Detonators for Blast Vibration Control and Blast Performance

    By Thomas L. Barkley

    "In early 2015 the Seed Waveform method was used to measure the Geologic response of the MesabiIron Formation to explosives energy input. This single charge wave form was then used to design acritical

    Jan 1, 2016

  • ISEE
    Twin Pendulum-New Method to Simulate the Generation of Toxic Fumes

    By Gunnar Persson

    The borehole pressure/time history of blasting practice is simulated in a twin pendulum apparatus, where the expanding shotfiring gases force two steel slab swingers apart. A pilot installation built

    Jan 1, 1996

  • ISEE
    Vibration Effects on Underground Concrete Structures

    By Frederick Kuhnow

    In open pit blasting, energy is released and transmitted through the geology. Negative effects can impact operations and can affect mine production. This paper presents recommendations for blast desig

    Jan 1, 2014

  • ISEE
    Stratablast in Action

    By C. Rutledge

    The new mining method of multiple strata blasting, called StratablastTM, is described in a separate paper presented at this conference. The current paper presents three case studies where the techniqu

    Jan 1, 2006

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Roadblocks: Increasing Production, Reducing Problems

    By Greg Parker

    "As the Explosives Industry continues to evolve and condense, those involved, such as Blasters,Contractors, Distributors and Consultants, continue to be challenged by both internal and externalforces.

    Jan 1, 1999

  • ISEE
    Bulk Explosives Testing at the Red Dog Mine in Northwestern Alaska

    By Norman Paley, John Kells

    The climate and location of the Red Dog Mine present several challenges to blasting operations. The mine is located north of 68º latitude, in an area of continuous permafrost. Ground temperatures are

    Jan 1, 2004

  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025