Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geological Sensing - The Key To Increasing Miner Safety

    By J. R. M. Hill

    The U.S. Bureau of Mines is involved in research to improve geological sensing (or geo-sensing) techniques. This paper presents results from field trials of two research projects concerned with new te

    Jan 1, 1992

  • SME-ICGCM
    A Critical Study of Strata Behaviour During Extraction of Pillars in a Thick Coal Seam

    By S. Jayanthu

    This paper presents analysis of strata behaviour with special reference to convergence and stress variation during an experimental trial of extraction of pillars with cable bolts as major support syst

    Jan 1, 1998

  • SME-ICGCM
    Instrumentation and Monitoring For Pillar Extraction in a Deep, Faulted Uranium Mine (3da9a7b4-75c4-492e-843f-6defa6026a38)

    By Thomas R. Scotese

    A rock mechanics instrumentation and monitoring program was implemented during pillar extraction at Gulf Mineral Resources' Mt. Taylor Mine, the deepest uranium mine in the U.S. Three types of mo

    Jan 1, 1984

  • SME-ICGCM
    Roof Support Performance In High Stress Conditions

    By Thomas P. Mucho

    To document the performance of mine roof and roof support systems the U.S. Bureau of Mines (IJSBM) has been installing instrumentation at selected sites in U.S. coal mines. Much of this support and ro

    Jan 1, 1995

  • SME-ICGCM
    Polymer Membrane Liners In Underground Coal Mines - Ground Control For The Millenium?

    By David C. Laurence

    in March 1999, the School of Mining Engineering at the University of New South Wales carried out a series of underground trials using " Evermine", a South African developed two-part water based polyme

    Jan 1, 2000

  • SME-ICGCM
    Gateroad Pillar Extraction Experience at Jim Walter Resources

    By Gregory Hendon

    Jim Walter Resources, Inc. (JWR), has successfully longwall mined for many years at depths ranging from 1200'-2500'. However, full pillar extraction has proven difficult and generally econom

    Jan 1, 1998

  • SME-ICGCM
    Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines

    By Matthew J. DeMarco

    Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t

    Jan 1, 1993

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    Mining Under Strong Roof

    By K. Y. Haramy

    Strong roof helps minimize roof fall problems in coal mine entries. However, the Inability of strong roof to cave readily may contribute to major ground control problems In Iongwall and retreat mining

    Jan 1, 1988

  • SME-ICGCM
    Evaluation Of Support Performance In A Highly Stressed Mine

    By Hamid Maleki

    The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5

    Jan 1, 1994

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Aerostatic Support System For Underground Coal Mines

    By R. J. Morrell

    The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra

    Jan 1, 1988

  • SME-ICGCM
    Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring

    By Richard J. Perin

    Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe

    Jan 1, 1988

  • SME-ICGCM
    Frictional Properties of Rock Applied to Mining Excavations

    Results of direct shear tests on rock discontinuities and triaxial compression tests on intact rocks are presented and - discussed. The main parameters considered area stress functions, angle of in

    Jan 1, 1987

  • SME-ICGCM
    Monitoring For The Evaluation Of The Stability Of Underground Openings

    By P. K. Kaiser

    The purpose of deformation monitoring for the evaluation of the stability of underground openings is reviewed briefly and some results from laboratory tests of small tunnels are presented. The ground

    Jan 1, 1981

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • SME-ICGCM
    Microseismic Monitoring In The Sydney Coalfield

    By G. R. Corbett

    Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst

    Jan 1, 1994

  • SME-ICGCM
    Practical Stress Modeling for Mine Planning

    By Keith Heasley

    As part of the initial investigation and validation of a new boundary-clement formulation for stress modeling in coal mines. the underground stresses and displacements at two multiple-seam coal mines

    Jan 1, 1998

  • SME-ICGCM
    Full-Scale Performance Evaluation of Mobile Roof Supports

    By Thomas M. Barczak

    The performance characteristics of Mobile Roof Supports (MRS's) were evaluated through full-scale testing in the Strategic Structures Testing Laboratory at the National Institute for Occupationa

    Jan 1, 1997

  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000