Search Documents

  • ISEE
    Determining and Mitigating the Effects of Firing a Linear Shaped Charge Underwater

    By Brian T. Burch, Paul N. Worsey

    When fired, submerged Linear Shaped Charges (LSCs) lose all effectiveness in the cutting of steel. Users in underwater applications have reported having to substantially increase the charge size to th

    Jan 1, 2015

  • CIM
    A New Method for the Stabilization of Arsenic from Enargite Concentrates

    By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.

    Jan 1, 2017

  • TMS
    Reduction Roasting Of Chalcopyrite Without SO2 Formation

    By A. R. Udupa

    The reduction roasting behavior of chalcopyrite has been investigated using various combinations of a desulfurizing agent, i.e., CaO or Na2CO3, and a reductant, i.e., CO, H2 or C. Using these, combina

    Jan 1, 1983

  • CIM
    Arctic mineral wealth: Equitable participation with aboriginal landowners — a slow or fast process?

    By Donald E. Wakefeld

    "The pace at which mining will occur in Northern regions and Arctic lands will depend on the answers to a number of questions. Who are the local aboriginal participants? What land uses are they pursui

    Jan 1, 1996

  • SAIMM
    Keynote Address: Coal Mining - The Future - Introduction

    By R. P. Mohring

    Before we look at what the challenges and opportunities for future coal mining will be, it is appropriate to have a look at whether there will be a coal industry in the future. There is much talk abo

    Jan 1, 2001

  • SAIMM
    Challenges Associated With Further Development Of The Waterberg Coalfield

    By L. Jeffrey

    The Waterberg Coalfield has vast potential to become a significantmining and industrial centre in South Africa. Its future developmenthinges on a number of critical decisions that must be made jointly

    Jan 1, 2005

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • AUSIMM
    Analysis of Geological Mapping Data at the Cononish Gold-Silver Mine, Perthshire, Scotland

    By I M. Platten, C J. S Sangster, Y Xie

    The Cononish gold-silver deposit is a steep, relatively narrow quartz-vein system, with a current total mineral resource of 154 000 oz Au and 589 000 oz Ag. The northeast-southwest trending system was

    Jan 1, 2009

  • NIOSH
    OFR-123-80 Evaluation Of The Safety Of One-Hour Chemical Self Rescuers ? Introduction

    By R. W. Watson

    In January 1980, the Bureau of Mines initiated an experimental program to examine the fire and explosion hazards of one-hour self-contained self rescuers (SSRs). This action was prompted by a growing

    Jan 1, 1980

  • SAIMM
    Pillar Behaviour and Seismicity in Platinum Mines

    By S. M. Spottiswoode

    Crush pillars are widely used in mine workings on the Merensky Reef in the Bushveld Complex to prevent panel collapses. Crush pillars are expected to fail as or soon after they emerge from the face an

    Jan 1, 2014

  • AUSIMM
    An Analysis of the Performance of a Ball Mill Rake Classifier Comminution Circuit

    An extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope

    Jan 1, 1967

  • CIM
    Some Aspects of Industrial Safety in British Columbia

    By W. K. A. Congreve

    Introduction Less than a hundred years ago the engineer was able to do his job without concern for the science that underlay his practices or for the men who operated his machines. But toward the e

    Jan 1, 1948

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • SAIMM
    Management Of A Major Slope Failure At Nchanga Open Pit, Chingola, Zambia

    By W. A. Naismith

    On 16 July 2004, at 07:10 a collapse of about 1.8 million m3 (about 4 ½ million tons) took place on the north wall on Nchanga Open Pit. This collapse was the result of a developing instability that wa

    Jan 1, 2005

  • AIME
    Geology - Geology of the Nakina Iron Property, Ontario

    By W. T. Swensen

    The Anaconda Company, through its wholly owned subsidiary The Anaconda Company (Canada) I,td., has investigated, optioned and partially developed a large tonnage of iron ore amenable to magnetic conce

    Jan 1, 1961

  • NIOSH
    RI 9597 - Reactivity Studies During Drying and Relocation of Lead-Zinc-Gold Tailings - Phase 1: Preliminary Evaluation and Laboratory Testing

    By L. J. Froisland

    The U.S. Bureau of Reclamation requested U.S. Bureau of Mines (USBM) assistance in developing design data for moving lead-zinc-gold tailings from their current location without disrupting the existing

    Jan 1, 2010

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • TMS
    Recovery Of Germanium From Imperial Smelting Process In Shaoguan Smelter

    By Li Chen

    A new process, i.e. Ball milling--Neural leaching--Oxidation calcinations--Chloridizing distillation--Hydrolysis, was designed to recover germanium from the vacuum furnace slag produced in Shaoguan sm

    Jan 1, 2005

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010