Search Documents

  • NIOSH
    IC 8258 Fire And Explosion Hazards In Fluidized-Bed Thermal Coal Dryers

    By H. A. Schrecengost

    Information presented herein was gathered by examination of 29 fluidized-bed thermal coal dryers and by conferences with manufacturers and users of such equipment to determine what safety features cou

    Jan 1, 1965

  • ISEE
    Drill and Blast Digitalization

    By Ricardo Dr. Chavez, Mathieu Lachamp, Rob Dr. Farnfield

    Pueblo Viejo is an open pit gold mine in the Dominican Republic which is always looking forward to implement the newest technology in the industry to improve all processes. Focusing on one of the pill

    Jan 1, 2019

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • SAIMM
    A Laboratory Investigation Into The Effect Of Specimen Size On The Strength Of Coal Samples From Different Areas

    By J. N. Van der Merwe

    The results of over 900 coal strength tests done during the period 1993?1994 for the SIMRAC project COL021A were re-analysed with a view to find a method to delineate areas or seams that can be groupe

    Jan 1, 2003

  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • AUSIMM
    Recovery of Beryllia From Beryl

    By Lawrie D. C

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash and heating at 900°C for 4-6 hr. The sintered mater:al was then crushed and leached by boiling under reflux with 5N

    Jan 1, 1965

  • SME
    The Latin American Exploration & Mining Boom: Who Are The Biggest Winners?

    By Hans von Michaelis

    The current exploration boom in Central and South America shows no sign of abating and, if anything, is growing. This is despite an inevitable cooling in the recent frenzied buying of resource stocks

    Jan 1, 1995

  • SME
    Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) Stresses

    By John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw

    An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac

    Jan 1, 1979

  • NIOSH
    RI 5102 Dephosphorization In A Side-Blown Basic Converter - Part I. Dephosphorization Of 3-Percent Phosphor Iron - Introduction

    By R. C. Buehl

    Pilot-plant tests have been in progress at the Bureau of Mines, Pittsburgh, Pa., on the recovery of manganese from open-hearth slag.3/4/5/ In the process, 1 the slag is first reduced in a blast furnac

    Jan 1, 1955

  • CIM
    Chapter 14. Boilerplate

    By Karl J. C. Harries

    "14.1. INTRODUCTION1The boilerplate of an agreement is not a single provision, but a series of provisions that are expected in “every agreement”. They are sometimes also referred to as the “lawyer’s p

    Jan 1, 2003

  • CIM
    The Benefits of AG Milling for Diamond Liberation when Processing Soft Kimberlites

    By J. E. Danoczi

    Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne (FalC) area in central Saskatchewan. The first ste

    Jan 1, 2012

  • SAIMM
    Projectification in the South African mining industry

    By W. A. Smith, M. C. Bekker, C. Marnewick

    Projects or project-orientated approaches have become a common form of work in nearly all sectors of economies. This has led to concepts such as ‘projectified’ and ‘project orientated’ organizations.

    May 1, 2021

  • NIOSH
    OFR-212-84 Guideline Manual For Hopper/Crusher/Conveyor Systems Used With Front-End Loaders

    By James W. Martin

    This user?s manual analyzes the application, selection and performance of hopper/crusher/conveyor systems used with front-end loaders in surface mining operations. It is designed to be used in conjunc

    Jan 1, 1982

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • AUSIMM
    Light Airborne Platforms for Monitoring Mines and Minerals

    By C Cavern, G Jacobs, F Durufle, L Ameglio

    Airborne geophysics and geomatics is at a crossroads as to whether it remains a viable mapping tool, both technically and commercially, and broadens its potential for new applications (eg environmenta

    Nov 4, 2015

  • AUSIMM
    Cadia East Open Pit Project Mining Study

    The Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea

    Jan 1, 2007

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • NIOSH
    OFR-11-85 Characterization And Beneficiation Of Bitumen-Free Domestic Tar Sands

    By P. B. Altringer

    The Federal Bureau of Mines conducted a study to determine if residues from fractional distillation represent a potential source of mineral values. A literature review and discussions with tar sand sp

    Jan 1, 1982

  • SAIMM
    Geometallurgical model of a copper sulphide mine for long-term planning

    By E. Pizarro, A. Videla, G. Compan

    One of the main problems related to mining investment decisions is the use of accurate prediction models. Metallurgical recovery is a major source of variability, and in this regard, the Chuquicamata

    Jan 1, 2015

  • AUSIMM
    Thermodynamic and Phase Diagram of the Lead-Lead Sulphide Binary System

    The published liquidus data on the Pb-PbS system have been correlated on the basis of one-coefficient Margules equations. Thermodynamic properties of the components of this system have been obtained,

    Jan 1, 1972